My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1711 ENGLAND AVE 2025-09-10
>
Address Records
>
ENGLAND AVE
>
1711
>
1711 ENGLAND AVE 2025-09-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 11:25:32 AM
Creation date
8/19/2025 11:23:14 AM
Metadata
Fields
Template:
Address Document
Street Name
ENGLAND AVE
Street Number
1711
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 of 22 <br /> \Ik/ PROJECT NO. NO. <br /> S231120-2XR <br /> PROJECT 1711 England Ave Everett WA 98203 <br /> LONGITUDE SUBJECT Foundation Stabilization/Jacking <br /> ONE TWENTYO <br /> ENGINEERING&DESIGN BY JT DATE 12/19/2023 <br /> Maximum loading on grade beam determined <br /> based on building geometry,and through <br /> conservative assumptions regarding span <br /> - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - <br /> lengths and support walls/foundation.Basically, I'all concrete walls assumed full tributary span of L/2 L/2 <br /> floor members and roof members. <br /> Design code:IBC 2018 <br /> Roof LL(snow ground):25 psf <br /> Floor LL:40 psf <br /> Patio/Deck LL:60 psf <br /> Floor/Roof OIL:15 psf <br /> Wall DL: 12 psf <br /> Cone Wall DL: 150pcf x 240 in2=250 plf <br /> *see following pages for area calc <br /> Pile#8 2'-2" (18" + 8") <br /> Roof Trib=0.5*30'=15' <br /> Typical Fir Ht=10' <br /> Cone Ht=4'-0" <br /> Pile#9-13 <br /> Roof Trib=0.5*30'=15' <br /> Floor Trib=0.5*20'=10' Plle antl connection requirements per Pile and connexion requirements per <br /> Typical Fir Ht=10' contactor contractor <br /> 6'-0"MAX <br /> Pile #8 Pile #9-13 <br /> Case 1:Point Load(8'Span) Case 1:Point Load(6'Span) <br /> Pile Reaction=1120 pif*8'=9.0 k Pile Reaction=1270 plf*6'=7.7 k <br /> Pile Reaction w/SW=1520 pif*6'=9.2 k <br /> Case 2:Uniform Load Case 2:Uniform Load <br /> DL=12*10+15*15+400=745 pif -DL=12*10+15*(15+10)=495 pif <br /> LL=0 plf -LL=40*10=400 plf <br /> SL(snow)=25*15=375 plf -SL(snow)=25*15=375 plf <br /> Total load=DL+LL+SL=1120 plf Total load=DL+LL+SL=1270 plf <br /> Total load w/SW=DL+LL+SL=1520 plf <br /> Refer to attached calculations for analysis. Refer to attached calculations for analysis. <br /> Conclusion: <br /> Based on the loading and geometry of the structure we conclude that the foundation may be stabilized through the use of piles and <br /> connections per R&R.These are to be attached to the stem-wall(grade-beam)at an on-center(o.c.)spacing no greater than 6'-0"o.c.. <br /> L120 ENGINEERING&DESIGN <br />
The URL can be used to link to this page
Your browser does not support the video tag.