Laserfiche WebLink
as -"z J cn <br /> Y <br /> O <br /> O ¢ O W <br /> CL M j <br /> a m W � <br /> ozz <br /> m a o <br /> m <br /> v v v <br /> L N N N <br /> D 0 0 0 B D O o 0 o N N <br /> I I I <br /> v rn o <br /> — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — <br /> 0 0 <br /> r ---1 L JL-= Professional of Record: <br /> J I L-� FAA <br /> 1 I <br /> _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _` DESIGN <br /> 2 3 2 SCOPE OF WORK 2 2 2 I `SCOPE OF WORK Architectural <br /> Solutions Group <br /> z <br /> FRONT ELEVATION — DEMOLITION 1940140WOOD,TH A9803620 <br /> �� FRONT ELEVATION — PROPOSED LVNNWOOD,WA98036 <br /> (425)967-8409 <br /> A2.0 3/16" = 1'-0" A2.0 3/16" = 1'-0" <br /> AMANDA MARTIN <br /> PROGRAM MANAGER <br /> DEMOLITION NOTES amartin@pmdginc.com <br /> 1. NOTIFY ARCHITECT OF ANY DISCREPANCIES BETWEEN ARCHITECTURAL DRAWINGS AND EXISTING KEN McCRACKEN <br /> CONDITIONS. OBTAIN CLARIFICATION FROM ARCHITECT IN WRITING BEFORE PROCEEDING WITH THE ARCHITECT <br /> WORK IN THE CORRESPONDING AREA. <br /> rc 2. CONTRACTOR TO COORDINATE DISCONNECT OF ALL UTILITIES PRIOR TO ANY DEMOLITION. EXPIRATION DATE:06/22/25 <br /> 3. CONTRACTOR TO REMOVE ALL DEMOLITION DEBRIS AND DISPOSE OF IT IN ACCORDANCE WITH CITY 1�� 66 <br /> F AND COUNTY REGULATIONS. 1 /4 REGISTERED <br /> 4. CONTRACTOR TO PROTECT ALL PUBLIC BUILDING AREAS ALONG THE ROUTE OF TRAVEL PRIOR TO ARCHITECT <br /> a THE COMMENCEMENT OF DEMOLITION. <br /> 5. CONTRACTOR TO CLEAN UP PUBLIC AREAS ALONG THE ROUTE OF TRAVEL EACH DAY AND <br /> WHENEVER DEBRIS, DUST, ETC. BECOMES EXCESSIVE. KE McCRACKEN <br /> 6. FIELD VERIFICATION OF EXISTING CONDITIONS AND SPECIFIC QUANTITIES OF DEMOLITION ARE THE STATE OF WASHINGTON <br /> RESPONSIBILITY OF THE CONTRACTOR. <br /> 7. ALL DIMENSIONS SHOWN TO BE EXISTING SHALL BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO SIGNATURE DATE: <br /> DEMOLITION. VERIFY DEMOLITION WORK WITH NEW CONSTRUCTION AND INSTALLATION DRAWINGS �0/03/24 <br /> o D O PRIOR TO COMMENCEMENT OF CONSTRUCTION. <br /> a 8. CONTRACTOR SHALL PROVIDE ALL TEMPORARY BRACING AS REQUIRED TO MAINTAIN STRUCTURAL Seal <br /> 0 4 I STABILITY OF THE EXISTING STRUCTURE DURING ALL PHASES OF CONSTRUCTION. <br /> 3 5 9. IF THE CONTRACTOR ENCOUNTERS ANY HAZARDOUS MATERIALS DURING DEMOLITION OR <br /> k CONSTRUCTION, CONSTRUCTION IS TO BE SUSPENDED IMMEDIATELY AND MCDONALD'S PROJECT <br /> rc n I MANAGER SHALL BE NOTIFIED BEFORE PROCEEDING. o <br /> r----�r----�r----JL <br /> 4 r -, 10.ALL DEMOLITION SHALL BE CARRIED OUT IN A SAFE MANNER IN ACCORDANCE WITH OSHA J o�ko�CP''c <br /> 1 II t III III II REGULATIONS. - °e�m J ams <br /> o \ III <br /> z U \ ❑ IL----4---- <br /> —JL--- III IIII ° <br /> o I I y o'E�c°$v <br /> ` li <br /> DEMOLITION KEYED NOTES <br /> to $�3-2 <br /> 0 SCOPE OF WORK SCOPE OF WORK c v` W E u ii <br /> 2 1 EXIST STOREFRONT GLAZING TO BE REMOVED. o c ^o <br /> EXIST D"EXIST <br /> E HARDWARE AND THRESHOLD TO BE 2 �°-�€ <br /> REMOVE <br /> N �3� DRIVE—THRU ELEVATION — DEMOLITION 3 PORTIORICK TO BE REMOVED. y <br /> rE A2.0 3/16" = 1'-0" �a EXIST CASH WINDOW TO REMAIN. o' mo <br /> 0 �5 EXIST SERVICE WINDOW TO REMAIN. o G '�.. o•;„Ti <br /> o <br /> �oswS�•w° <br /> 0 <br /> o w <br /> a <br /> a a <br /> p N Z p N <br /> Z W Q <br /> PROPOSED KEYED NOTES <br /> i ❑i NEW EXTERIOR CONSTRUCTION AND FINISH TO MATCH EXIST ADJACENT. <br /> 3 <br /> a <br /> NEW ENTRY/EXIT DOOR AND FRAME, FRAME FINISH TO MATCH EXIST ADJACENT. <br /> SEE 1/A4.1 AND 9/A4.1. <br /> 310 <br /> D O 3 NEW STOREFRONT GLAZING, FRAME FINISH TO MATCH EXIST ADJACENT. <br /> 0 SEE 9/A4.1 AND 12/A4.1. m <br /> 3 <br /> C <br /> 5 M tt <br /> U � w � <br /> o <br /> ^ ¢ w <br /> N co LLJ <br /> o p <br /> J W <br /> Q O <br /> G Z a R m <br /> N <br /> 0 I W ; W p O <br /> i SCOPE OF WORK SCOPE OF WORK � <br /> :2 W o vai A a r'7 <br /> Ln <br /> a = A2 . 0 <br /> �4� DRIVE—THRU ELEVATION — PROPOSED <br /> A20 3/16" = 1'-0" U <br /> EXTERIOR ELEVATION <br /> City of Everett Permit Services <br /> EVERETT Reviewed for Permit 11/14/2024 <br />