My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2405 5TH ST 2023 Plans 2025-08-20
>
Address Records
>
5TH ST
>
2405
>
Plans
>
2405 5TH ST 2023 Plans 2025-08-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2025 9:52:30 AM
Creation date
8/20/2025 9:52:16 AM
Metadata
Fields
Template:
Address Document
Street Name
5TH ST
Street Number
2405
Permit
TANK2304-001
Year
2023
Notes
Decommission (1) 300 gallon UST
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Controlling static electricity or providing a conductive path to discharge static electricity by <br /> bonding and grounding equipment and vehicles. <br /> • Roping off tank area from pedestrian and vehicular traffic. <br /> • Provide two 20-B:C portable fire extinguishers within 50 feet of operations. <br /> • Locating and mark all utility lines on site. <br /> • Determining meteorological conditions. Vapor accumulation can occur on still and high-humidity <br /> days. Under these conditions,test the area for vapor accumulation; if present, either provide <br /> additional forced ventilation or delay the job until there is a breeze and it is less humid. <br /> Excavated soil should be tested for vapor release. <br /> o Artificial ventilation or repeated turning of excavated soil might be necessary to avoid <br /> ignitable concentration of vapors. <br /> • Ensuring personnel are wearing hard hats, safety shoes, and safety glasses and a combustible <br /> gas indicator is available. <br /> Removal and Disposal of Tanks <br /> Removal of above-ground and underground tanks shall be in b = <br /> accordance with all of the following: <br /> • Flammable and combustible liquids shall be removed - <br /> from the tank and connected piping. <br /> • Piping at tank openings that is not to be used further <br /> shall be disconnected. <br /> • Piping shall be removed from the ground. �I _ N <br /> o Exception: Piping is allowed to be <br /> abandoned in place where the fire code d <br /> official determines that removal is not ^x'' <br /> practical.Abandoned piping shall be capped <br /> safeguarded as required by the fire code <br /> official. <br /> • Tank opening shall be capped or plugged, leaving <br /> 1/8-inch to 1/4—inch-diameter opening for pres a <br /> ure "�'r, ,- ' <br /> equalization. <br /> • Tanks shall be purged of vapor and inerted prior to removal. <br /> o Purging or ventilating the tank replaces the flammable vapors in the tank with air, <br /> reducing the flammable mixture of fuel and oxygen below the lower explosive limit or <br /> lower flammable limit (LFL). <br /> • No cutting torch or other flame, or spark, producing equipment should be used until the tank <br /> has been completely purged or otherwise rendered safe. <br /> • All exterior above-grade fill and vent piping shall be permanently removed. <br /> Fire Marshal's Office 425.257.8100 1 everettwa.gov/fire I INFORMATION HANDOUT P-3 8.1.2019 1 Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.