Laserfiche WebLink
SHEARWALL SCHEDULE (CDX) HOLDOWN SCHEDULE F <br /> SILL F-ATE & BOTTOM/TOP PLATE "FOR HOLDOWN5 INSTALLED IN NEW FOUNDATIONS <br /> MARK SHEATHING EDGE NAILING FIELD NAILING C — <br /> CONN. ® FND CONN. THRU BOLTS OR EMBEDMENT/ MINIMUM <br /> %" 0 A.B. O 48" LTP4 ® 20" O/C MODEL ANCHOR BOLT NAILS/SCREWS STRAP LENGTH EDGE DIST. I. d' ZI <br /> Q COX ONE 8d ® 6" O/C 8d ® 12" O/C O/C W/ 2x SILL W/ 2x BOTTOM D �t N 8 Q <br /> FACE PLATE PLATE STHD10/RJ N/A (28) 16d COMMON 10" EMBED 1kz" NA NA J <br /> 2" COX ON 1Od ® NA NA <br /> 12" 0 A.B. ® 24 LTP4 ® 9" O/C W/ (30) 10d COMMON 34" + CLEAR CENTER ON g <br /> ® FACE 10d ® 3" 0/C O/C 0/C W/ 3x SILL 3x BOTTOM PLATE CS14 N/A IN SINGLE STUD SPAN RIM JOIST <br /> PLATE <br /> MSTC4883 N/A (54) 10d COMMON 447/6„ H BEAMO NA NA <br /> SHEARWALL NOTES IN DOUBLE STUD I BELOW <br /> 1. ALL STUDS, BLOCKING, TOP AND BOTTOM PLATES SHALL BE HEM—FIR NO. 2 UNLESS NOTED OTHERWISE <br /> ON PLANS. ALL SHEATHING EDGES MUST BE BACKED WITH 2x OR WIDER FRAMING (SEE NOTE #3). HOLDOWN NOTES V <br /> 2. SHEATHING MAY BE INSTALLED EITHER HORIZONTALLY OR VERTICALLY. ALL SHEARWALL SHEATHING MUST 1. ALL—THREAD BOLTS SHALL CONFORM TO ASTM A307. G <br /> EXTEND TO THE OUTISDE EDGE OF ALL HOLDOWN POSTS AND CORNERS, AND TO THE INSIDE EDGE OF E <br /> m <br /> 2. MINIMUM CONCRETE COMPRESSIVE STRENGTH f'c = 2500 PSI H. <br /> w—N E <br /> FRAMING AROUND OPENINGS. _ Q >O o <br /> NAILING IS SHEARWALL 3 AND GREATER ALL FRAMING MEMBERS RECEIVING EDGE 3. ALL HOLDOWNS REQUIRE A (2) 2x POST UNLESS NOTED OTHERWISE. HDU11 AND HHDQ14 3. WHERE SHEATHING # <br /> REQUIRE A 6x6 D F MINIMUM POST SIZE, U.N.O. WHERE HOLDOWNS ARE INSTALLED INTO <br /> NAILING FROM ABUTTING PANELS SHALL NOT BE LESS THAN A SINGLE 3—INCH NOMINAL MEMBER. # 2 ��' ''' "" <br /> ADDITIONALLY, WHERE SHEARWALLS ARE SHEATHED ON BOTH FACES, ALL STUDS AND PLATES RECEIVING THE WIDE FACE OF THE STUD, THE STUDS MUST BE STITCH NAILED TOGETHER W/ 16d <br /> EDGE NAILING FROM BOTH FACES MUST BE A SINGLE 3—INCH NOMINAL MEMBER OR PANEL JOINTS MUST BE SINKERS STAGGERED ® 4" 0/C. •'. •• ,':. .: `,' ": ' .N <br /> STAGGERED. IN EACH OF THESE CASES 3x STUDS ARE REQUIRED UNLESS SPECIFICALLY NOTED OTHERWISE <br /> ON THE PLANS BY THE ENGINEER. FOR SHEARWALLS #3 AND #4, A 2x SILL PLATE MAY BE USED IF TWO 4. MINIMUM EDGE DISTANCE IS FOR FORMED CONCRETE EXPOSED TO WEATHER OR SOIL. FOR 0 °� N <br /> ®DOUBLE TOP PLATE W/ EDGE NAILING ©HOLDOWN PER SCHEDULE O z w <br /> TIMES THE NUMBER OF ANCHOR BOLTS REQUIRED BY THE SHEARWALL SCHEDULE ARE USED AND ARE CONCRETE CAST AGAINST SOIL PROVIDE 3" CLEAR TO ANCHOR BOLT. AND PLAN (HDQ8—SDS3 Z 3 <br /> EVENLY SPACED (SEE 2003 IBC SECTION 2305.3.10). (STAGGER) m w O 3 <br /> 5. NAILS/SCREWS TO HOEDOWN POST SHALL BE PER MANUFACTURER'S SPECIFICATIONS. ®SHEARWALL EDGE NAILING AT ALL PANEL SHOWN) <br /> 4. SHEARWALL NAILING CRITERIA IS BASED ON TABLE 2306.4.1 OF THE INTERNATIONAL BUILDING CODE (FOR EDGES. BLOCKING AT ALL PANEL EDGES (B)COORDINATE ALL STUD <br /> COX) OR REPORT NER-124 (FOR OSB). VALUES ARE BASED ON HEM—FIR NO. 2 FRAMING WITH COMMON 6. ALL HOEDOWN BOLTS MUST BE RE—TIGHTENED JUST PRIOR TO ENCLOSING 2ND SIDE OF WHERE APPLICABLE. AND PLATE SIZES w/ - <br /> NAILS. WALL. OHEGH)NAILING <br /> STAGGER UNTO DOUBLE POST <br /> STUDS(FULL <br /> SHEARWALL SCHEDULE Q <br /> REQUIREMENTS � <br /> 5. HOLDOWNS AND OTHER CONNECTIONS MAY BE REQUIRED AT THE ENDS OF MANY SHEARWALLS. SIZES POST PER ®STUDS ® 16" ON CENTER QJ EDGE NAILING TO POSTS, 4--N <br /> AND LOCATIONS OF THESE CONNECTORS ARE INDICATED ON THE PLANS. REFER TO THE APPROPRIATE PLAN/SCHEDULE HOLDOWN PER PLAN TRIM STUDS, AND KING ((� <br /> DETAILS AND/OR HOLDOWN SCHEDULE FOR ADDITIONAL INFORMATION REGARDING ANCHOR BOLTS, (2-2x MIN) ®PRESSURE TREATED SILL PLATE WITH STUDS <br /> EMBEDMENT LENGTH, ETC. WHERE (2) 2x's ARE USED AS A HOLDOWN POST, SHEARWALL EDGE NAILING EDGE NAILING AND ANCHOR BOLTS PER BEARING STUD FOR <br /> MUST BE STAGGERED INTO EACH MEMBER OF THE POST. ALL—THREAD ROD, DIAMETER SHEARWALL SCHEDULE. (E)BEARING <br /> HEADER j <br /> AND EMBEDMENT PER ®TOP PLATE SPLICE NAILING TO BE (8) 16d <br /> 6. ANCHOR BOLTS MUST BE EMBEDDED A MINIMUM OF 7" INTO CONCRETE OR GROUTED CIVIL, AND SHALL BE SCHEDULE SINKERS (MIN). LAP 48" MINIMUM. 12)CENTER <br /> TO PROVIDE A MINIMUM OF 2" COVER. PROVIDE 3" COVER FOR CONCRETE CAST AGAINST SOIL. CENTER SPLICE ON STUD. z N <br /> PRESSURE TREATED SILL STD. SHEARWALL ELEVATION W 0 RIM oN <br /> 7. ALL MACHINE BOLTS SHALL BE ASTM A307 OR BETTER. HILTI KWIK BOLTS/SIMPSON TITEN HD BOLTS OF PLATE PER SHEARWALL SCALE: Y2"=1'-0" <br /> THE SAME DIAMETER AS SHOWN IN THE SHEARWALL SCHEDULE MAY BE SUBSTITUTED FOR ANCHOR BOLTS SCHEDULE. n <br /> Lu <br /> INTO EXISTING CONCRETE. BOLTS SHALL BE EMBEDDED A MINIMUM OF 5" INTO EXISTING CONCRETE. Kul <br /> '4. ' ru <br /> EMBE EXIST. FOUNDATION p <br /> 8. ALL NAILS AND CONNECTORS IN CONTACT WITH PRESSURE TREATED WOOD (EXCEPT FOR BORITE TREATED LEN axfi P. T. HF#z <br /> WOOD) MUST BE HOT DIPPED GALVANIZED OR STAINLESS STEEL TO RESIST CORROSION. A21 EA SIDE OF 2x6 P. T. HF#2 TOP AND z <br /> POS9. WHERE 10d NAILS ARE SPACED AT 3" ON CENTER OR LESS, NAILS MUST BE STAGGERED. SIMPSDN ACE (TYP) BOTTOM TOM TOP AND BOTTOM RAIL <br /> RAIL(TYP) <br /> 10. OSB OF EQUAL OR GREATER THICKNESS MAY BE SUBSTITUTED FOR COX SPECIFIED IN SHEARWALL 2x2INTERMEDIARY <br /> FRAMING O 4" O/C <br /> SCHEDULE. 2 HOLDOWN DETAIL W/o RIMJOIST <br /> G SCALE: 3/4"=1'—O" <br /> HOLDOWN POST. SEE FOR DOUBLE SIDED BEAM PER PLAN 0 <br /> HOLDOWN SCHEDULE OR LENGTH OF SHEARWALLS, THE SHEATHING N <br /> POST PER PLAN ON EACH FACE MUST EXTEND TRUSS PER PLA 42 W <br /> PLAN FOR MINIMUM SHEARWALL CONTINUOUS BETWEEN O (n <br /> REQUIREMENTS 8d ® 6" 0/C INTO BLOCKIN <br /> HOLDOWN POSTS AS SHOWN. POST/BEAM (ONE SIDE) <br /> Iml <br /> H1 CLIP ® EAC 1 <br /> TRUSS (24" O/C <br /> OPENING PER PLAN # MA> <br /> LOCATION OF <br /> HOLDOWN TO BE STHDI4RJ VENTILATION MAY BE <4" = O <br /> INSTALLED \ REQ'D AT BLOCKING. I _ <br /> \ Lu <br /> WALL PER PLAN — VERIFY METHOD W/ SIMPSDN AC (TYP) BEAM PER PLAN / "m THRU BOLT <br /> `TYPE OF HOEDOWN TO BE INSTALLED NAIL SHEATHING ENGINEER PRIOR TO BEAM PER PLAN J w/2"m x 16" WASHER. ^ �J <br /> INTO EA MEMBER OF POST PER PLAN MIN WIDTH m 3" BOLTS SHALL BE CENTERED U 1 <br /> CONSTRUCTION. BIRD IN THE POST, NOT LESS > <br /> SHEARWALL DESIGNATION — SEE TOP PLATE BLOCKING IS MIN DEPTH = 7.5" THAN 2" FROM THE EDGE Lu <br /> SHEARWALL SCHEDULE FOR FRAMING, POST/BEAM (TWO SIDES) OF THE BEAM. <br /> NAILING AND ANCHORAGE ACCEPTABLE. <br /> LATERAL MARKING LEGEND REQUIREMENTS 4 TYP. POST TO BEAM CONN. <br /> n ROOF/SHEARWALL CONN. J TYP HANDRAIL <br /> J <br /> ,%2" COX OR 3(6" OSS ROOF <br /> SHEATHING. NAIL w/8d O 6" cov <br /> o/c PANEL EDGE AND 8d O 12" y A (. <br /> SIMPSDN H2.5 EACH o/c PANEL FIELD 16" x 8" CONCRETE 0 <br /> OUIMPSO R TO GABLE EDGE NAILING FOOTING w/ (2) #4 <br /> NAIL SHEATHING TO BLOCK NAIL ROOF SHTG END TRUSS OUTLOOKER SPAN fhb BARS CONTINUOUS <br /> W/ 8d ® 4" o/c TO TOP CHORD w/ ---; 24" x 24" x 12" DEEP CONCRETE 3 <br /> 8d ® 6" o/c NAIL ROOF SHEATHING TO i FOOTING w/ (2) #4 BARS EACH bNAL <br /> TOP CHORD w/ 8d ® 6" 0 C 2x HF#2 OUTLOOKERS O E4 WAY <br /> SIMPSDN 'HU' 24" o/c — SIZE AND i----i 30" x 30" x 12" DEEP CONCRETE <br /> COMMON HANGER SPAN PER TABLE i 1 FOOTING w/ (2) #4 BARS EACH 8/21/24 <br /> (4) 16d NAIL TRUSS <br /> FROM BRACE TO SOLID B OUTLc <br /> BLOCK �Zj <br /> a45 2x FLAT ® GABLE -__3� WAY <br /> SHEATHING TO MATCH SHEATHING TO MATCH BETWEEN OUTLOOKERS <br /> SHEARWALL. NAIL TO GABLE PER IF SHEATHING IS NOT SHEARWALL. NAIL TO O BEARING <br /> 2x4 BLOCK ® EACH SCHEDULE.(WHERE 10d NAILS ARE BROKEN ON TOP PLATE, GABLE PER SCHEDULE. GABLE END 1 I 36" x 36" x 12" DEEP CONCRETE Drawn By:CHRIS <br /> DIAGONAL BRACE REQ'D, USE 10d x 2" LONG.) USE A35 ® 12" 0/C TRUSS i FOOTING w/ (3) #4 BARS EACH Checked By:CHRI5 <br /> 2x FLAT ® GABLE BREAK SHEATHING ON 363612 WAY, TOP & BOTTOM Date:08-21-24 <br /> BREAK SHEATHING ON <br /> TOP PLATE ONLY slzE SPAN ; ; 42" x 42" x 12" DEEP CONCRETE <br /> TOP PLATE ONLY 2x4 FLAT 18° i FOOTING w/ (4) #4 BARS EACH SDA JOB NO. <br /> LATERAL BRACING IS 2x6 FLAT 24" i WAY <br /> 2x4 DIAGONAL BRACE SHEARWALL PER PLAN REQUIRED AT ALL GABLE 2x4 36" ----41 9864A <br /> ® 48" O/C — BBL IF SHEATHING IS NOT BROKEN END TRUSSES AND IS TO 2x6 42" i-------1 54" x 54" x 24" DEEP CONCRETE <br /> BRACE WHEN LENGTH ON TOP PLATE, USE A35 O 12" O/C BE DETAILED BY TRUSS FOOTING w/ (7) #6 BARS EACH STRUCTURAL <br /> EXCEEDS 6'-0" MANUFACTURER I I WAY, <br /> SHEARWALL PER ---- TOP & BOTTOM DETAILS <br /> PLAN 545424 <br /> 6 GABLE SHEARWALL CONN GABLE END/SHEARWALL CONNECTION 8 OUTLOOKER CONNECTION 9 FOOTING SCHEDULE 5-2 .0 <br /> SCALE: 3/4"=1'—O" <br />