My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2725 32ND AVE NE 2024 PROPANE NORTHWEST Plans 2025-08-20
>
Address Records
>
32ND AVE NE
>
2725
>
PROPANE NORTHWEST
>
Plans
>
2725 32ND AVE NE 2024 PROPANE NORTHWEST Plans 2025-08-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2025 11:39:44 AM
Creation date
8/20/2025 11:38:22 AM
Metadata
Fields
Template:
Address Document
Street Name
32ND AVE NE
Street Number
2725
Tenant Name
PROPANE NORTHWEST
Permit
TANK2405-002
Year
2024
Notes
installing a 30000 gallon propane storage tank
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Form 4.3 <br /> Additional Information on the LP-Gas Facility <br /> ❑ Existing Facility; Built to NFPA 58 Edition 2011 ✓❑ Proposed Facility <br /> a) Name of the Facility(if applicable): Propane NorthwestEverett storage <br /> b) Type of LP-Gas Facility: ❑ Commercial ❑ Industrial ✓❑ Bulk Plant <br /> c) Facility is located in: ❑ City Industrial Zone ❑ Suburban Area ❑ Rural Area <br /> ✓❑ City Commercial Zone <br /> d) Facility neighbors§: ❑ Agri Fields 0 Commercial Bldgs. ❑ Flammable Liquids Storage <br /> (Check all that apply) ❑ Industrial Activity(metal fabrication, cutting and welding, etc.) <br /> ❑ Manufacturing 0 Others (explain) landscaping and composti <br /> e) Geographic Location of Facility/Address: 3000 Frontage rd <br /> Everett, WA 98201 <br /> f) Landmarks, if any: <br /> g) LP-Gas liquid supply by: ❑ Bobtail 0 Truck Transport ❑ Rail Tank Car <br /> (Check all that apply) ❑ Pipeline <br /> h) LP-Gas Distribution by: ❑ Liquid Piping ❑ Truck Transport ❑ Vapor Piping Plant <br /> (Check all that apply): 0 Bobtail ❑ Dispensing or Vehicle Liquid Fueling <br /> i) Number of Vehicle Entrances: ❑ One ✓❑ Two ❑ More than two <br /> j) Type of Access Roads to the Facility: ❑ Rural ✓❑ City or Town ❑ Highway <br /> (One check per line) Entrance 1: ❑ Dirt road ❑ Gravel road ✓❑ Paved <br /> (One check per line) Entrance 2: ❑ Dirt road ✓❑ Gravel road ❑ Paved <br /> k) Staff presence: ❑ Not staffed 0 Only during transfer operations <br /> ❑ Staffed always (24/7) ❑ Only during business hours <br /> ❑ Other(Explain) <br /> 1) Location and distances to Assembly, Educational or Institutional Occupancies surrounding <br /> the facility, if any, within 250 feet from the facility boundary in the direction of the assets: <br /> n/a <br /> m) Overview plot plan of the facility attached? ✓❑ Yes ❑ No <br /> § All properties either abutting the LP-Gas facility or within 250 feet of the container or transfer point nearest to <br /> facility boundary. <br /> A- 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.