My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2600 FEDERAL AVE PORT OF EVERETT 2026-01-15
>
Address Records
>
FEDERAL AVE
>
2600
>
PORT OF EVERETT
>
2600 FEDERAL AVE PORT OF EVERETT 2026-01-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2026 9:00:57 AM
Creation date
8/20/2025 1:20:17 PM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
2600
Tenant Name
PORT OF EVERETT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2022 System Development Fee Calculations <br /> Permit ff: B2201-014 Additional Notes: <br /> Project Address: 2600 Federal AVE <br /> Project Name: Modular Restroom Building <br /> Answer the Following Questions(Required):All Yellow Inputs <br /> Water District: Everett <br /> Sewer District: Everett Prepared By: Thad Newport Date: 2/7/2022 <br /> Outside City Limits? No *Adds a 25%Surcharge <br /> Supportive Housing Credit? No *Reduces by 80% lReviewed By: Date: <br /> Fee Calculations: <br /> Water&Sewer System Development Fees: <br /> Domestic Meter: Fee Calculation(Before Credit): Credit Calculations(Up to 3 meters for Meter-Based Calculation or 3 previous building uses for Administrative Guidelines-Based Calculation): <br /> *Subject to Administrative Guidelines Proposed Building Use: Warehouse Previous Bldg Use 41: Warehouse Previous Bldg Use H2: No Other Use Previous Bldg Use#i3: No Other Use <br /> Proposed Unit Measure: 460 Sq.Ft. Unit Measure for Use 111: JSq.Ft. Unit Measure for Use N2:1 None Unit Measure for Use 03: None <br /> Note:Meter Size Used for Proposed Meter Size: 2" Credited Meter##1 Size: 81.1Credited Meter H2 Size: None Credited Meter#i3 Size: None <br /> Calculation Water Fee: $22,979.00 Water Credit Hl: $229,924.00 Water Credit#2: $0.00 Water Credit q3: $0.00 <br /> Sewer Fee: $29,739.00 Sewer Credit#t1: $297,559.00 Sewer Credit k2: $0.00 Sewer Credit HI $0.00 <br /> Total Fees Due:Add to Utility Permit for Domestic Meter <br /> Permit M U Water Sys Dev Fee Total: -$206,945.00 This fee reflects credit for existing%voter meter <br /> Sewer Sys Dev Fee Total: -$267,820.00 This fee reflects credit for existing water meter <br /> Total: -$474,765.00 <br /> Irrigation Meter: Fee Calculation(Before Credit): Credit Calculations: <br /> Proposed Meter Size: None Credited Meter Size: None <br /> Water Fee: $0.00 Water Credit: $0.00 <br /> No Sewer Fee: SOLD No Sewer Credit: $0.00 <br /> Total Fees Due:Add to Utility Permit for Irrigation Meter <br /> Permit N:U Water Sys Dev Fee Total: $0.00 This fee reflects credit for existing water meter <br /> No Sewer Sys Dev Fee: $0.00 lirrigation meters are only subject to the water portion of system development fees <br /> Total: $0.00 <br /> Fire Meter: Proposed Meter Size: None For informational purposes only <br /> Permit N:U No Sys Dev Fees: $0.00 Fire meters are not subject to system development fees <br /> Stormwater System Development Fees: <br /> Permit 4: B2201-014 Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: 460 1 SF <br /> Stormwater System Dev Fee: $123.19 Add this fee to the Building Permit <br /> Permit 4: PWXXXX-XXX Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: I SF <br /> Stormwater System Dev Fee: $0.00 Add this fee to the Public Works Permit <br />
The URL can be used to link to this page
Your browser does not support the video tag.