My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2600 FEDERAL AVE PORT OF EVERETT 2026-01-15
>
Address Records
>
FEDERAL AVE
>
2600
>
PORT OF EVERETT
>
2600 FEDERAL AVE PORT OF EVERETT 2026-01-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2026 9:00:57 AM
Creation date
8/20/2025 1:20:17 PM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
2600
Tenant Name
PORT OF EVERETT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 2/17/2023 2/17/2023 BLDG 16-FINAL RAKEEB KHAN CORRECTION <br /> REQUIRED <br /> Notes: <br /> Cole Potter <br /> Strider Construction Co.,Inc. <br /> 4721 Northwest Dr. <br /> Bellingham WA,98226 <br /> Cell:(360)303-5906 <br /> Office:(360)380-1234 <br /> Need electrical final prior to building final. <br /> anchorage ok. <br /> 2/23/2023 2/23/2023 BLDG 16-FINAL KURT KECK CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 2/18/2023 10:38 AM STRIDER CONSTRUCTION CO INC <br /> Contact Name:STRIDER CONSTRUCTION CO INC <br /> Site Address:2600 FEDERAL AVE RESTROOM <br /> Phone:3603801234 <br /> e-Mail:colep@striderconstruction.com <br /> Obtain finals on all sub permits. <br /> 3/7/2023 3/7/2023 BLDG 16-FINAL RAKEEB KHAN OTHER eTRAKiT Inspection Request <br /> Notes: <br /> 3/3/2023 9:20 AM STRIDER CONSTRUCTION CO INC <br /> Electrical has been signed off <br /> Contact Name:STRIDER CONSTRUCTION CO INC <br /> Site Address:2600 FEDERAL AVE RESTROOM <br /> Phone:3603801234 <br /> e-Mail:colep@striderconstruction.com <br /> TCO for 60 days. <br /> Final approval required for all permits including electrical and public works. <br /> 10/8/2024 10/8/2024 BLDG 16-FINAL RAKEEB KHAN APPRVD-PERMIT <br /> FINAL <br /> Notes: <br /> Instructions to Building Inspector from Sabrina: If building permit and all sub permits are ready,OK to final. Public Works parent permit will remain <br /> open for easement recording.This inspection is scheduled by Sabrina in an effort to help close out Port Permits.The Public Works permit is a"campus <br /> style"permit with multiple buildings that can be finaled ahead of the PW parent permit. <br /> 10/9/2024 10/21/2024 CERTIFICATE OF CINDY BERGSMA APPROVAL <br /> OCCUPANCY <br /> Notes: <br /> I <br /> Printed: Monday, 21 October,2024 2 of 2 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.