Laserfiche WebLink
Intake &Approval Sheet (FOR PERMIT STAFF ONL)q PERMIT <br /> BUILDING PLANNING <br /> Intake OK by: Date: Intake OK by: Assign To: Date: <br /> Intake Comments: Intake Comments: <br /> Zone <br /> Overlay/Agreement <br /> ❑ Route to Commercial Building Nonresidential Use <br /> ❑ Route to Residential Building Residential Use <br /> ❑ Make this a"W"Permit Proposed No.of Dwelling Units: <br /> Bldg/TI/Addn/Rem Size Total No.of Dwelling Units: <br /> Garage/Accessory Struct.Size — Planning/Landscape Inspection Required before Final? ❑Yes ❑No <br /> Number of Stories "In Lieu" Fee:Type: Amount$ <br /> Basement ❑No ❑Yes, Fin/Unfin School Impact Fee: Total $ <br /> Type of Construction Calculated: Credit: <br /> Occupancy Group (t2G ❑Everett School Dist ❑Mukilteo School Dist <br /> Occupancy Load Park Impact Fees for permit plied for after 1/1/2022: <br /> Fire Sprinklers: ❑Update Existing ❑New System ®Not Req'd Park Impact Fee Total$ (net due after credit for existing uses) <br /> Reason Sprinklers Required: Fee Schedule Used For Calculation(Year): <br /> 1 _ ......_...,..__ _,..... .._,-...................... <br /> ,....,.._,........,.__,.........,_.._..,_..,_..,.._.. <br /> Fire Alarm: Update Existing El New System yuNot Req'd Permit Technician Use Only:Apply Phase-In Credit Per EMC19.53.200 <br /> Reason Fire Alarm Required: rt� ❑ 100%Credit-Issued 1/1/2022-9/2/2022 <br /> RCW 64.55 MF worksheet req'd for permit? ❑Yes No ❑ 50%Credit-Issued 9/3/2022-6/2/2023 <br /> Addl RCW 64.55 docs required prior to final? ❑Yes MNo ❑ 0%Credit-Issued 6/3/2023 or later <br /> VALUATION CALCULATION: Total$ 24,t=:257 Additional Notes: <br /> n Lha L Z23- <br /> Approved By: Date: <br /> PUBLIC WORKS <br /> Additional Notes: Intake OK by: Date: <br /> ........... <br /> ____,_,.,._....__.._.........__......,....,..... <br /> ,. <br /> .............. <br /> . <br /> Intake Comments: ;PW Worksheet Needed if: <br /> ![]Sys Dev Eval(UGI/sw)(]Traffic Mit Eval <br /> Approved By: Date: OE]Site Work/Drainage ❑Address Letter <br /> IDBackflow Prevention for high hazard: <br /> I <br /> (dental,medical,animals,mortuary,hospital, <br /> FIRE DEPARTMENT supportive housing) <br /> i------------........._...........................................,................... <br /> Separate/Deferred Submittals Required: El this folder for PW Review at end ---PW Review Worksheet <br /> ❑Fire Sprinklers ❑Fire Alarm ❑Other: ❑This project also has a separate concurrent PW Review(Green Folder) <br /> Additional Notes: AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br /> ❑This Permit is Approved by Public Works <br /> Fire Dept.Fees: ❑ See PW Review Worksheet and associated attached items <br /> ❑ Review of As-Built Plans-NO FIRE FEE ❑A Separate PW Permit is Required(Permit#: PW ) <br /> ❑ Minimal or No Fire Scope-NO FIRE FEE AND ❑ Is located in this folder <br /> ❑ Review/Inspection Scope-ADD FIRE FEE ❑ Is in a Separate Green Folder Qoin with this folderfor permit issuance) <br /> Approved By: Date: // ❑Will be Issued separately(Separate Green Folder,PW issued ahead of Bldg) <br /> EFPublic Works has no scope—PW Not Required <br /> ELECTRICAL/PLUMBING Additional Notes: RPOLT> 5vzFAcE iA�EA• <br /> Additional Notes: <br /> Approved By Date: Completed By: — Date: c.•S 20 2oL3 <br />