Laserfiche WebLink
Cendek Railings Ltd. May 25,2016 <br /> Report No. 102560897000-002 Page 4 of 5 <br /> Notes: <br /> 1. A live load factor of 2.5 was applied to the above loads. <br /> 4.2. IN-FILL LOAD TEST <br /> A load of 125 lbs was applied using a 1 square foot block normal to the in-fill. After release of <br /> the load, the system was evaluated for failure, any evidence of disengagements of any <br /> component and/or visible cracking from any component. <br /> 4.3. CONCENTRATED LOAD TEST <br /> The top rail of the guardrail system was subjected to three separate tests where a concentrated <br /> load of 500 lbs was applied: <br /> • horizontally at the mid-span of the top rail, <br /> • horizontally at the top rail adjacent to the post connection to verify the connection <br /> capacity, and <br /> • horizontally at the top of post. <br />