My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9910 EVERGREEN WAY BUZZ INN STEAKHOUSE 2025-09-11
>
Address Records
>
EVERGREEN WAY
>
9910
>
BUZZ INN STEAKHOUSE
>
9910 EVERGREEN WAY BUZZ INN STEAKHOUSE 2025-09-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2025 7:58:46 AM
Creation date
8/21/2025 11:36:14 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
9910
Tenant Name
BUZZ INN STEAKHOUSE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� J CROWN <br /> Date: February 28, 2022 CASTLE <br /> Crown Castle <br /> 2000 Corporate Drive <br /> Canonsburg, PA 15317 <br /> 724-416-2000 <br /> Subject: Structural Modification Report <br /> Carrier Designation: DISH Network Co-Locate <br /> Site Number: SESEA00219B <br /> Crown Castle Designation: BU Number: 880407 <br /> Site Name: BUZZ INN <br /> JDE Job Number: 702556 <br /> Work Order Number: 2078679 <br /> Order Number: 601554 Rev. 0 <br /> Engineering Firm Designation: Crown Castle Project Number: 2078679 <br /> Site Data: 9910 EVERGREEN WAY, EVERETT, SNOHOMISH County,WA <br /> Latitude 47'54'28.74", Longitude -1220 94'29.92" <br /> 96 Foot- Monopole Tower <br /> Crown Castle is pleased to submit this "Structural Modification Report" to determine the structural integrity of <br /> the above-mentioned tower. <br /> The purpose of the analysis is to determine acceptability of the tower stress level including the proposed <br /> modifications as outlined in the attached drawings, "Appendix D". Based on our analysis we have determined <br /> the tower stress level for the structure and foundation. under the following load case, to be: <br /> LC4: Modified Structure with Considered + Proposed Equipment Configuration Sufficient Capacity <br /> This analysis has been performed in accordance with the 2018 International Building Code based upon an <br /> ultimate 3-second gust wind speed of 98 mph. Applicable Standard references and design criteria are listed in <br /> Section 2- "Analysis Criteria". <br /> Structural analysis prepared by: Drew Stephens <br /> 03/01/22 <br /> Respectfully submitted by: .,RUC LAc <br /> OF WAS; <br /> Truc, Lac, P.E., S.E_ �4Q <br /> Senior Project Engineer , '262 <br /> License Expires: 02/24/2023 <br /> tnxTower Report-version 8.1.1.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.