Laserfiche WebLink
el <br /> National Ready Mixed Concrete Association <br /> Certificate of Conformance <br /> Tr�r For <br /> Concrete Production Facilities <br /> NRMCATHIS IS TO CERTIFY THAT <br /> Arlington Plant oo3R, Arlington, WA <br /> Smokey point Concrete <br /> has been inspected by the undersigned licensed professional engineer for conformance with the <br /> requirements of the Check List for Ready Mixed Concrete Production Facilities. As of the <br /> inspection date,the facilities met the requirements for production by <br /> Truck Mixing with Automatic Batching and Recordings of <br /> Cementitious Materials, Aggregate, Water, and Chemical Admixtures <br /> � Rt 41 {rT ,€�q� <br /> x <br /> � J <br /> a,� ��� Signature of Licensed Professional Engineer <br /> --, ° October 01, 2021 October 12, 2023 <br /> (Sea Inspection Date Certification Expiration Date <br /> This company will maintain these facilities in compliance with the Check List requirements and will <br /> correct promptly any deficiencies which develop. <br /> Signature of Company Official Title of Company Official <br /> NOTICE:The Check List indicates only that plant facilities are satisfactory for the production of concrete when properly operated. Conformance of the <br /> concrete itself with specification requirements must be verified by usual inspection methods in accordance with sales agreements. <br /> This certificate is issued by the National Ready Mixed Concrete Association on verification that the production facility conforms to the requirements of the <br /> NRMCA Certification of Ready Mixed Concrete Production Facilities,QC3.Unauthorized reproduction or misuse of this certificate may result in legal action. <br /> Plant ID#: 815169 Certification ID#:28174 <br /> © 1965,1992,2001,2002,2006,2007,2012 <br /> National Ready Mixed Concrete Association 66 Canal Center Plaza,Suite 250 9 Alexandria•Virginia 22314 <br />