My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 8/21/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
IMCO General Construction 8/21/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 2:19:45 PM
Creation date
8/21/2025 2:19:24 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
8/21/2025
Council Approval Date
8/20/2025
End Date
6/13/2025
Department
Public Works
Department Project Manager
Zachary Brown
Subject / Project Title
WFP Emergency Generator Replacement Final Acceptance
Public Works WO Number
UP3587
Tracking Number
0003461
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Project:WFP Emergency Generator Replacement <br />Work Order: <br />Contract Amount at Bid: (excludes WSST) <br />General Contractor:IMCO General Construction <br />Req #Subcontractor Federal Employer ID #WA UBI No.Amount $This %Prior % <br />% To <br />Date <br />Return <br />Date DBE <br />L&I <br />Intent Date <br />L&I <br />Affidavit Date <br />1 Service Electric 97-0579381 179 023 787 $1,349,465.00 30.03 0.00 30.03 1276974 11/16/22 1429478 7/3/25 <br />2 Construction by Champion 26-2033877 602 806 074 $54,300.00 1.21 30.03 31.24 1292947 12/30/22 1205715 4/27/23 <br />3 Hudson Bay Insulation 93-1030217 601 274 484 $14,200.00 0.32 31.24 31.56 1275341 10/17/22 1356423 11/8/24 <br />4 Northshore Paving 91-1342960 600 635 278 $18,700.20 0.42 31.56 31.98 1305744 2/21/23 1208232 5/8/23 <br />5 Shinn Mechanical 91-1660433 601 585 839 $286,982.00 6.39 31.98 38.37 1301257 2/3/23 1426387 7/1/25 <br />6 McDowell NW Pile King 91-1702995 601 637 637 $2,910.00 0.06 38.37 38.43 1285170 11/21/22 1183301 2/2/23 <br />7 Lake Pointe Metals 46-1071113 603 241 414 $39,767.00 0.89 38.43 39.32 1283431 11/14/22 1434382 7/3/25 <br />8 Mountain Trucking & Excavating 26-0513563 602 730 335 $3,140.00 0.07 39.32 39.39 1278896 10/31/22 1428089 6/30/25 <br />9 Hytech Roofing 91-1202974 600 482 257 $64,950.00 1.45 39.39 40.84 1305975 2/22/23 1225578 7/19/23 <br />10 Ford Crane 91-1418055 601 050 656 $3,325.76 0.07 40.84 40.91 1303224 2/10/22 1240536 9/12/23 <br />11 Bravo Environmental NW 602 946 216 $2,352.50 0.05 40.91 40.96 1301147 2/13/23 1408943 4/4/25 <br />12 Innovac 603 469 527 $3,000.00 0.07 40.96 41.03 1500012 1/9/25 1427953 6/12/25 <br />13 E-Z Interface 600 618 766 $5,820.00 0.13 41.03 41.16 1303228 2/10/23 1222224 7/5/23 <br />14 Ralph's Concrete Pumping 578 085 430 $3,995.09 0.09 41.16 41.25 1295236 1/25/23 1285011 2/7/24 <br />15 Smokey Point Concrete 603 326 236 $22,994.24 0.51 41.25 41.76 1276888 11/16/22 1427071 6/27/25 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />SUBCONTRACTOR TRACKING LOG <br />3587 <br />$4,493,000.00
The URL can be used to link to this page
Your browser does not support the video tag.