My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8102 EVERGREEN WAY MALL KIOSK EVERETT 4 CORNERS - MAIL KIOSK Geotech Report 2025-08-22
>
Address Records
>
EVERGREEN WAY
>
8102
>
EVERETT 4 CORNERS - MAIL KIOSK
>
Geotech Report
>
8102 EVERGREEN WAY MALL KIOSK EVERETT 4 CORNERS - MAIL KIOSK Geotech Report 2025-08-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2025 7:50:43 AM
Creation date
8/22/2025 7:49:23 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8102
Unit
MALL KIOSK
Tenant Name
EVERETT 4 CORNERS - MAIL KIOSK
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 1, 2019 <br />ES-6516 <br />DevCo, Inc. <br />10900 Northeast 8t" Street, Suite 1200 <br />Bellevue, Washington 98004 <br />Attention: Mr. David Ratliff <br />Dear Mr. Ratliff: <br />Earth <br />Solutions <br />NW«c <br />Earth Solutions NW LLC <br />Geotechnical Engineering, Construction <br />Observation/Testing and Environmental Services <br />Earth Solutions NW, LLC (ESNW) is pleased to present this report titled "Geotechnical <br />Engineering Study, Four Corners, 8102 Evergreen Way, Everett, Washington". Based on the <br />results of our investigation, the proposal is feasible from a geotechnical standpoint. Our study <br />indicates the site is underlain primarily by glacial till, with minor areas of fill. Perched groundwater <br />seepage was encountered at the boring locations between depths of about 3 to 15 feet below the <br />existing ground surface elevation. In our opinion, the contractor should be prepared to manage <br />discrete zones of groundwater seepage during construction. <br />Based on our findings, it is our opinion the proposed multi -family structures may be constructed <br />on conventional continuous and spread footing foundations bearing upon dense to very dense <br />native soil. In general, dense native soil suitable for support of foundations will likely be <br />encountered beginning at depths of about two -and -one-half to eight feet below existing grades. <br />Where loose or unsuitable soil conditions are exposed at foundation subgrade elevations, <br />overexcavation to a depth that exposes dense native soils and replacement with crushed rock or <br />lean mix will be necessary. <br />Given the presence of dense to very dense native glacial till at relatively shallow depths, it is our <br />opinion infiltration is not feasible from a geotechnical standpoint. The appreciable fines contents <br />and high in -situ density of the deposit will likely inhibit the function of any full-scale infiltration <br />system. From a geotechnical standpoint, the native glacial till should be considered impervious <br />for purposes of large scale infiltration design. <br />Pertinent geotechnical recommendations are <br />opportunity to be of service to you on this project. <br />this geotechnical engineering study, please call. <br />Sincerely, <br />EARTH SOLUTIO S NW, LLC <br />t <br />6-14V <br />CNase"G. Halsen <br />Senior Staff Geologist <br />provided in this study. We appreciate the <br />If you have questions regarding the content of <br />1805 - 136th Place N.E., Suite 20"1 • Bellevue, VVA 98005 • (425) 449-4704 • FAX (425) 449-4711 <br />
The URL can be used to link to this page
Your browser does not support the video tag.