Laserfiche WebLink
SHEARWALL SCHEDULE (CDX) HOLDOWN SCHEDULE F <br /> SILL PLATE & BOTTOM/TOP PLATE 'FOR HOLDOWN5 INSTALLED IN NEW FOUNDATIONS <br /> MARK SHEATHING EDGE NAILING FIELD NAILING CONN. ® FND CONN. <br /> THRU BOLTS S EMBEDMENT T MINIMUM <br /> MODEL ANCHOR BOLT NAILS/SCREWS STRAP LENGTH EDGE DIST. I° d° C D � � <br /> FACE 8d ® 6" O/C Sd ® 12" O/C O/C W/ 2x SILL W/ 2x BOTTOM G,t e 0 <br /> PLATE PLATESTHD10/RJ N/A (28) 16d COMMON 10" EMBED ix. NA NA J N <br /> ® %2" CDX ONE 10d ® 3" 0/C 10d ® 12" 0/C A.B.3®S2LL LTP4 ® 9" O/C W/ (30) 10d COMMON 34" + CLEAR CENTER ON <br /> FACE 0/C PLATE 3x BOTTOM PLATE CS14 N/A IN SINGLE STUD SPAN RIM JOIST NA NA B <br /> [MSTC48B3 N/A (54) 10d COMMON HOOK TOLo <br /> SHEARWALL NOTES / IN DOUBLE STUD 447� BELOW BEAMNA NA <br /> 1. ALL STUDS, BLOCKING, TOP AND BOTTOM PLATES SHALL BE HEM-FIR NO. 2 UNLESS NOTED OTHERWISE -N <br /> ON PLANS. ALL SHEATHING EDGES MUST BE BACKED WITH 2x OR WIDER FRAMING (SEE NOTE #3). HOLDOWN NOTES V <br /> 2. SHEATHING MAY BE INSTALLED EITHER HORIZONTALLY OR VERTICALLY. ALL SHEARWALL SHEATHING MUST 1. ALL-THREAD BOLTS SHALL CONFORM TO ASTM A307. G Q <br /> EXTEND TO THE OUTISDE EDGE OF ALL HOLDOWN POSTS AND CORNERS, AND TO THE INSIDE EDGE OF H E 0 ch <br /> FRAMING AROUND OPENINGS. 2. MINIMUM CONCRETE COMPRESSIVE STRENGTH f'c = 2500 PSI 00 w-n E <br /> Q >Op O <br /> 3. WHERE SHEATHING NAILING IS SHEARWALL #3 AND GREATER, ALL FRAMING MEMBERS RECEIVING EDGE 3. ALL HOLDOWNS REQUIRE A (2) 2x POST UNLESS NOTED OTHERWISE. HDU11 AND HHDQ14 +'' Q N <br /> NAILING FROM ABUTTING PANELS SHALL NOT BE LESS THAN A SINGLE 3-INCH NOMINAL MEMBER. REQUIRE A 6x6 D F# 2 MINIMUM POST SIZE, U.N.O. WHERE HOLDOWNS ARE INSTALLED INTO ; + O)c0 y <br /> ADDITIONALLY, WHERE SHEARWALLS ARE SHEATHED ON BOTH FACES, ALL STUDS AND PLATES RECEIVING THE WIDE FACE OF THE STUD, THE STUDS MUST BE STITCH NAILED TOGETHER W/ 16d • '' ' _� <br /> EDGE NAILING FROM BOTH FACES MUST BE A SINGLE 3-INCH NOMINAL MEMBER OR PANEL JOINTS MUST BE SINKERS STAGGERED ® 4" O/C. i � N <br /> STAGGERED. IN EACH OF THESE CASES 3x STUDS ARE REQUIRED UNLESS SPECIFICALLY NOTED OTHERWISE ''' '' '' (u Y- <br /> ON THE PLANS BY THE ENGINEER.T1MES THE NUMBER OF ANCHOR BOLTSRREQUREDABY T SHEARWALL2SCHILL EDULEATE MAY ARE USEDEAND€D IF ARE TWO 4. MINIMUM EDGE CONCRETE CAST AGANSTNCE S01 SPROVIDE FORMED <br /> CLEARCONCRETE <br /> TO ANCHOR BOLO WEATHER OR SOIL. FOR T. ®DOUBLE TOP PLATE W/ EDGE NAILING ©HOEDOWN PER SCHEDULE C) lu <br /> Z 3�3 <br /> EVENLY SPACED (SEE 2003 IBC SECTION 2305.3.10). (STAGGER) AND PLAN (HDQ8-SDS3 cx1 w O 3 <br /> 5. NAILS/SCREWS TO HOLDOWN POST SHALL BE PER MANUFACTURER'S SPECIFICATIONS. ®SIiEARWAtt EDGE NAILING AT ALL PANEL SHOWN) 3 <br /> 4. SHEARWALL NAILING CRITERIA IS BASED ON TABLE 2306.4.1 OF THE INTERNATIONAL BUILDING CODE (FOR EDGES. BLOCKING AT ALL PANEL EDGES ®COORDINATE ALL STUD :n <br /> CDX) OR REPORT NER-124 (FOR OSB). VALUES ARE BASED ON HEM-FIR NO. 2 FRAMING WITH COMMON 6. ALL HOLDOWN BOLTS MUST BE RE-TIGHTENED JUST PRIOR TO ENCLOSING 2ND SIDE OF WHERE APPLICABLE. AND PLATE SIZES w/ <br /> NAILS. WALL. ©EDGE NAILING TO HOLDOWN POST (FULL SHEARWALL SCHEDULE U <br /> HEIGHT) STAGGER INTO DOUBLE STUDS REQUIREMENTS 3 <br /> 5. HOLDOWNS AND OTHER CONNECTIONS MAY BE REQUIRED AT THE ENDS OF MANY SHEARWALLS. SIZES POST PER ®STUDS ® 16" ON CENTER QJ EDGE NAILING TO POSTS, <br /> AND LOCATIONS OF THESE CONNECTORS ARE INDICATED ON THE PLANS. REFER TO THE APPROPRIATE PLAN/SCHEDULE HOLDOWN PER PLAN TRIM STUDS, AND KING <br /> DETAILS AND/OR HOLDOWN SCHEDULE FOR ADDITIONAL INFORMATION REGARDING ANCHOR BOLTS, (2-2x MIN) ®PRESSURE TREATED SILL PLATE WITH STUDS <br /> EMBEDMENT LENGTH, ETC. WHERE (2) 2x's ARE USED AS A HOLDOWN POST, SHEARWALL EDGE NAILING EDGE NAILING AND ANCHOR BOLTS PER <br /> MUST BE STAGGERED INTO EACH MEMBER OF THE POST. ALL-THREAD ROD, DIAMETER SHEARWALL SCHEDULE. ®BEARING STUD FOR <br /> AND EMBEDMENT PER ®TOP PLATE SPLICE NAILING TO BE (8) 16d HEADER p <br /> 6. ANCHOR BOLTS MUST BE EMBEDDED A MINIMUM OF 7" INTO CONCRETE OR GROUTED CMU, AND SHALL BE SCHEDULE SINKERS.(MIN). LAP 48" MINIMUM. N <br /> PLACED TO PROVIDE A MINIMUM OF 2" COVER. PROVIDE 3"COVER FOR CONCRETE CAST AGAINST-SOIL. CENTER SPLICE ON STUD. Ik <br /> PRESSURE TREATED SILL nSTD. SHEARWALL ELEVATION W/O RIM I i <br /> 7. ALL MACHINE BOLTS SHALL BE ASTM A307 OR BETTER. HILTI KWIK BOLTS/SIMPSON TITEN HD BOLTS OF i PLATE PER SHEARWALL I SCALE: )i=1'-0" m <br /> THE SAME DIAMETER AS SHOWN IN THE SHEARWALL SCHEDULE MAY BE SUBSTITUTED FOR ANCHOR BOLTS SCHEDULE. <br /> rA <br /> INTO EXISTING CONCRETE. BOLTS SHALL BE EMBEDDED A MINIMUM OF 5" INTO EXISTING CONCRETE. 1 4, w <br /> EMBEDMENT •�° EXIST. FOUNDATION <br /> 8. ALL NAILS AND CONNECTORS IN CONTACT WITH PRESSURE TREATED WOOD (EXCEPT FOR BORITE TREATED LENGTH 4x6 P.T.HF#2 o <br /> ' <br /> WOOD) MUST BE HOT DIPPED GALVANIZED OR STAINLESS STEEL TO RESIST CORROSION. O 4 O/C <br /> ° <br /> "d 'a„ •. A21 EA SIDE OF 2x6 P.T.HF#2 TOP AND Oz <br /> 9. WHERE 10d NAILS ARE SPACED AT 3" ON CENTER OR LESS, NAILS MUST BE STAGGERED. SIMPSON ACE(TYP) POST,TOP AND BOTTOM RAIL <br /> BOTTOM RAIL(TYP) _ <br /> (ho <br /> 10. OSB OF EQUAL OR GREATER THICKNESS MAY BE SUBSTITUTED FOR CDX SPECIFIED IN SHEARWALL 2x21NTERMEDIARY <br /> SCHEDULE. FRAMING o a"o/c <br /> nHOLDOWN DETAIL w/o RIMJOIST I/ t SCALE: �K"=V-0" <br /> HOEDOWN POST. SEE FOR DOUBLE SIDED CQ <br /> HOLDOWN SCHEDULE OR LENGTH OF SHEARWALLS, THE SHEATHING BEAM PER PLAN <br /> PLAN FOR MINIMUM SHEARWALL ON EACH FACE MUST EXTEND TRUSS PER PLA POST PER PLAN 42 O LLJ CNJ <br /> REQUIREMENTS CONTINUOUS BETWEEN <br /> HOLDOWN POSTS AS SHOWN. 8d ® 6" O/C INTO BLOCKIN POST/BEAM (ONE SIDE) 0 L <br /> H1 CLIP ® EAC <br /> TRUSS (24" O/C 1 Z Q <br /> # OPENING PER PLAN # MA <br /> LOCATION OF (J� <br /> HOEDOWN TO BE STHD14RJ VENTILATION MAY BE <4" C) <br /> ' INSTALLED = 0 <br /> REQ'D AT BLOCKING. <br /> \ WALL PER PLAN - Q <br /> `TYPE OF HOLDOWN TO BE INSTALLED NAIL SHEATHING VERIFY METHOD W/ SIMPSON AC(TYP) BEAM PER PLAN / "0 THRU BOLT = <br /> SHEARWA DESIGNATION - INTO EA MEMBER OF ENGINEER PRIOR TO BEAM PER PLAN / W/2"90 x)V WASHER. n LL I <br /> LL D SEE CONSTRUCTION. BIRD POST PER PLAN MIN`MOTH m 3' BOLTS SHALL BE CENTERED V 1 <br /> TOP PLATE MIN DEPTH 7.5" IN THE POST,NOT LESS <br /> SHEARWALL SCHEDULE FOR FRAMING, BLOCKING IS POST/BEAM (TWO SIDES) THAN 2'FROM THE EDGE Lu <br /> NAILING AND ANCHORAGE ACCEPTABLE. OF <br /> LATERAL MARKING LEGEND REQUIREMENTS <br /> n ROOF/SHEARWALL CONN. 4 TYP. POST TO BEAM CONN. �TYP HANDRAIL <br /> >a"CDX OR 3(e OSB ROOF _ <br /> SHEATHING. NAIL w/8d O 6" <br /> o/c PANEL EDGE AND 8d O 12" C�VIA'C <br /> SIMPSON H2.5 EACH o/c PANEL FIELD dF wayMyc^O <br /> NAIL SHEATHING TO BLOCK NAIL ROOF SHTG OUTLOOKER TO GABLE EDGE NAILING <br /> W/ 8d ® 4" o/c TO TOP CHORD w/ END TRUSS OUTLOOKER SPAN <br /> 8d ®6" o/c NAIL ROOF SHEATHING TO � � <br /> TOP CHORD w/ 8d 0 6" 0 C 2x HFf2 OUTLOOKERS O ��� <br /> SIMP-SON'HU' 24"o/c-SIZE AND ` <br /> TO(4) 16d NAIL COMMON HANGER SPAN PER TABLE - 16" x 8" CONCRETE JAN 2 2 2024 <br /> FROM BRACE TO w45' 2x FLAT S� GABLE SOLID BLOCKING f FOOTING w/(2) #4 <br /> BLOCK SHEATHING TO MATCH SHEATHING TO MATCI+ BETWEEN OUTLOOKERS f$b BARS CONTINUOUS <br /> 2x4 BLOCK ® EA IF NAIL TO GABLE PER IF SHEATHING IS NOT SHEARWALL. NAIL TO O BEARING f---T 24" x 24" x 12" DEEP CONCRETE <br /> SCHEDULE.(WHERE 10d NAILS ARE BROKEN ON TOP PLATE, GABLE PER SCHEDULE. GABLE END Drawn ey,CHRLi <br /> DIAGONAL BRACE USE �5S I_ 1 FOOTING w/ (2) #4 BARS EACH Checked CHR15 <br /> 2xQFLLAT ® GABLE 2 LONG.) USE A35 f� 12" 0/C 'f4 WAY Date:05 0-23 <br /> BREAK SHEATHING ON --- <br /> TOP PLATE ONLY SIZE SPAN i i 36" x 36" x 12" DEEP CONCRETE <br /> BREAK SHEATHING ON , � — <br /> TOP PLATE ONLY 2x4 FLAT 18" I I FOOTING w/ (3) #4 BARS EACH 5DA JOB NO. <br /> 2x4 DIAGONAL BRACE LATERAL BRACING IS 2x6 FLAT 24" WAY, TOP & BOTTOM Q/� <br /> ® 48 0 C _ BSL SHEARWALL PER PLAN REQUIRED AT ALL GABLE 2x4 W. 363fi12 95G4 <br /> / IF SHEATHING IS NOT BROKEN END TRUSSES AND IS TO 2x6 42' <br /> BRACE WHEN LENGTH i ---i 54" x 54" x 24" DEEP CONCRETE = <br /> EXCEEDS 6'-0" ON TOP PLATE, USE A35 ® 12" 0/C BE DETAILED BY TRUSS FOOTING w/ (7) #6 BARS EACH <br /> SHEARWALL PER MANUFACTURER i i WAY, 5TRUCTURNL <br /> PLAN 166 6b <br /> . 4�424 TOP BOTTOM <br /> LI;h LL\v{I RftoNS STRt LT_ <br /> E)ETAIL5 <br /> 6 /SHEARWALL CONN GABLE END/SHEARWALL CONNECTION r.--�O ,UTLOOKER CONNECTION � FOOTING SCHEDULE 1�3��z1 5-2 .0 <br /> SCALE. %"=1'-O" 7 w <br />