Laserfiche WebLink
IF THIS PLAN IS NOT ON 2204 PAPER,IT HAS BEEN SCALED ACCORDINGLY <br /> �N �� <br /> Uo <3 <br /> zg 8 o <br /> Z �N <br /> A. g <br /> N <br /> M <br /> • O 3 <br /> AF z �� a <br /> .z R <br /> ail �3 <br /> w y <br /> 0 <br /> ---------------------------- <br /> -I - 1-11- 4 1 jjj 11 4�4 A <br /> w5 <br /> 0 <br /> 1 PROPOSED FRONT ELEVATION SCALE:1/4°=T-0° <br /> '-� <br /> E <br /> o <br /> 0 00 <br /> L � <br /> Q N <br /> © L -5 <br /> TYPICAL ROOF ASSEMBLY: to <br /> rn y� <br /> COMPOSITE ROOFING ATOP ROLLED UNDERLAYMENT ATOP I. W <br /> 'A'CDX NAILED TO PRE-MANUFACTURED TRUSSES w/Bd w <br /> COMMON NAILS AT 6/12 PATTERN.INSTALL 0)LAYER h' <br /> TYPE'X'GWB TO CEILING.INSULATE ATTIC SPACE w/MIN. <br /> R-49 BLOWN INSULATION w/APPROVED BAFFLES. ✓ <br /> TYPICAL WALL ASSEMBLY: via (e4 I)'(/4L�jlwli a <br /> - 0 VERTICAL T1-11 SIDING ATOP ROLLED VAPOR9nRMER(TYPAR <br /> (--� OR FROGSKIN OR SIMILAR)ATOP h'CDX ATTACHED TO 2x <br /> \v I I I I I I I I I I I I I I LI I I I I II I I I I I I I I I I I I I lu'I FRAMING PER SHEARWALL SCHEDULE.INSTALL 0)LAYER h' <br /> G FACE OF WALL.FULLY INSULATE STUD BAYS <br /> o 21AFACED INSULATION,INSTALL FOAM <br /> Proposed <br /> IwWNS TIONALL <br /> WALL VOIDS HEADERS.INSTALL Elevations <br /> N m <br /> / \ PLASiIE-BARRfER BETWEEN INSULAA TION AND GWB(TVP)LIU - <br /> ---- <br /> _ _ Douglas Almond <br /> TYPICAL FLOOR/CEILING ASSEMBLY GARAGE <br /> FLOOR FINISHES PER OWNER ATOP�/i'CDX T&G GLUED AND 09212023 <br /> / NAILED TO FLOOR FRAMING w/12d RING OR SCREW <br /> q SHANKED NAILS @ 6/12 PATTERN.INSTALL 0)LAYER A° PP- 23-012-01 <br /> o 'X'GWB TO CEILING,FULLY FIRE TAPE SEAMS,INSTALL FIRE <br /> STOP AT ALL PENETRATIONS(TYP).INSULATE EACH JOIST Rlon R•Neiws <br /> BAY w/MIN.R-30 UNFACED INSULATION,HOLD TIGHT TO - <br /> \ 01 01/242024 <br /> UNDERSIDE OF SHEATHING(TYP). ✓ <br /> 0 - <br /> OV <br /> 2 PROPOSED LEFT ELEVATION SCALE:1/4°=T-0° 3 TYPICAL CROSS SECTION SCALE:1/4°=T-0° <br />