My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1522 CHESTNUT ST 2025-09-09
>
Address Records
>
CHESTNUT ST
>
1522
>
1522 CHESTNUT ST 2025-09-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2025 11:11:19 AM
Creation date
8/22/2025 11:11:19 AM
Metadata
Fields
Template:
Address Document
Street Name
CHESTNUT ST
Street Number
1522
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: E2505-003 Description: Service Change 200 AMP MAIN BREAKER, EMERGENCY <br /> DISCONNECT <br /> Applied:5/1/2025 Approved: 5/2/2025 Site Address: 1522 CHESTNUT ST <br /> Issued:5/2/2025 Finaled: 6/5/2025 City,State Zip Code: EVERETT,WA 98201 <br /> Status: FINALED Applicant: HARTS SERVICES(ELECT) <br /> Parent Permit: Owner:WEBER RYAN B&ZARATE CITLALLI <br /> Parent Project: Contractor: HARTS SERVICES(ELECT) <br /> Details: <br /> A. Replace 200a amp Main Breaker Panel(indoor, up to 66 circuits).. B. Replace 200a Service Mast and Meter with Emergency <br /> Disconnect. <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 5/21/2025 5/21/2025 ELEC 05-SERVICE** MICHAEL PARTIAL <br /> WICKLANDER APPROVAL <br /> Notes: <br /> JARIN 253-878-2555 <br /> UPDATED REQUESTTO 5/21 PER INTALLTEAM'S EMAIL IN ATTACHMENTS <br /> Approved service only.branch circuit and IBT to be inspected at a later date. <br /> 6/5/2025 6/5/2025 ELEC 10-FINAL** MICHAEL APPRVD-PERMIT eTRAKiT Inspection Request <br /> WICKLANDER FINAL <br /> Notes: <br /> 6/3/2025 12:13 PM HARTS SERVICES(ELECT) <br /> Contact Name:HARTS SERVICES(ELECT) <br /> Site Address:1522 CHESTNUT ST <br /> Phone:2533457222 <br /> e-Mail:office@hartsservices.com <br /> Approved permit final.Panel schedule is neat and complete,circuits test good. <br /> I <br /> Printed: Friday, 22 August,2025 1 of 1 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.