My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10130 IDAHO AVE 2025-09-09
>
Address Records
>
IDAHO AVE
>
10130
>
10130 IDAHO AVE 2025-09-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 9:23:40 AM
Creation date
8/25/2025 9:23:40 AM
Metadata
Fields
Template:
Address Document
Street Name
IDAHO AVE
Street Number
10130
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: E2505-020 Description: 200 amp panel and EV CHARGER <br /> Applied:5/2/2025 Approved: 5/5/2025 Site Address: 10130 IDAHO AVE <br /> Issued:5/5/2025 Finaled: 5/14/2025 City,State Zip Code: EVERETT,WA 98204-3601 <br /> Status: FINALED Applicant:CRIMSON CITY ELECTRIC LLC <br /> Parent Permit: Owner: LOVER LAROD JAMAR <br /> Parent Project: Contractor: CRIMSON CITY ELECTRIC LLC <br /> Details: <br /> Installing a new 200 amp panel and replacing the old one <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> ELEC 10-FINAL** Unassigned <br /> Notes: <br /> 5/6/2025 5/6/2025 ELEC 05-SERVICE** MICHAEL PARTIAL <br /> WICKLANDER APPROVAL <br /> Notes: <br /> DE-ANDRE 425-219-9519 <br /> Approved service only branch circuits to be done at a later date. <br /> 5/6/2025 5/6/2025 ELEC 10-FINAL** MICHAEL NOT READY <br /> WICKLANDER <br /> Notes: <br /> Branch circuits not installed at this time nor is there a panel schedule.approve service only. <br /> Needed power to verify circuits. <br /> 5/14/2025 5/14/2025 ELEC 10-FINAL** MICHAEL APPRVD-PERMIT Approved <br /> WICKLANDER FINAL <br /> Notes: <br /> LORAD 425-248-8652--REQUESTS AFTER 1:30PM <br /> Approved permit final circuit test good panel schedule is neat and complete Tesla car charger installed. <br /> Approved permit final,circuit test good,panel schedule is neat and complete,Tesla car charger installed. <br /> I <br /> Printed: Monday, 25 August, 2025 1 of 1 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.