My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering, Inc. 8/25/2025 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
HDR Engineering, Inc. 8/25/2025 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:10:19 AM
Creation date
8/25/2025 11:09:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering, Inc.
Approval Date
8/25/2025
Council Approval Date
7/23/2025
End Date
12/31/2027
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lexington-Broadway Stormwater Improvements Phase 1
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004344
Total Compensation
$1,277,070.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
HDR Engineering, Inc 5/7/2024
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />4 <br /> <br />2. All explorations for this scope amendment can be completed within an 8-hour day during <br />daylight hours and will be within City Right of Way or property for which right of entry has <br />already been secured. <br /> <br />Deliverables <br />The following deliverables will be produced under Task 300: <br />1. Draft and Final Dewatering memorandum <br />2. Final geotechnical report <br />Task 500 Project Reports <br />Objective <br />Ecology’s review process required multiple iterations of the design report in the form of <br />amendments. Those amendments were separate documents to facilitate expediting Ecology <br />review. The objective of Task 500 is to assemble the amendments into a final report for use by <br />the City. <br />Subtask 510 Design Report Update <br />Consultant Services <br />The Consultant will provide the following services under Subtask 510: <br />1. Summarize the changes that were incorporated into the final design through the value <br />engineering process that was completed in a memorandum to Ecology. Support the City in <br />responding to comments that may arise from that summary. <br />2. Assemble a final design report that incorporates the final design and each of the <br />amendments that were developed to meet Ecology grant requirements. <br />City Responsibilities <br />The City is responsible for the following activities under Task 500: <br />1. Provide written consolidated, conflict-resolved comments for the draft final design report. <br />Assumptions <br />The following was assumed for Task 500: <br />1. The report will not undergo Ecology review <br />Deliverables <br />The following deliverables will be produced under Task 500: <br />1. Draft and final design report
The URL can be used to link to this page
Your browser does not support the video tag.