My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering, Inc. 8/25/2025 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
HDR Engineering, Inc. 8/25/2025 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:10:19 AM
Creation date
8/25/2025 11:09:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering, Inc.
Approval Date
8/25/2025
Council Approval Date
7/23/2025
End Date
12/31/2027
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lexington-Broadway Stormwater Improvements Phase 1
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004344
Total Compensation
$1,277,070.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
HDR Engineering, Inc 5/7/2024
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />12 <br /> <br />1. To be determined when the supplemental services tasks are defined and mutually agreed <br />upon in writing. <br />Assumptions <br />The following was assumed for Task 1100: <br />1. A budget of up to $50,000 for this work <br />2. Other assumptions to be determined when the supplemental services tasks are defined and <br />mutually agreed upon in writing. <br />Deliverables <br />The following deliverables will be produced under Task 1100: <br />1. To be determined when the supplemental services tasks are defined and mutually agreed <br />upon in writing. <br />Schedule <br />The anticipated schedule is provided in the table below. <br />Anticipated Schedule <br />Milestone Date <br />Potholing July 2025 <br />Final Design July – August 2025 <br />Bid phase support August–November 2025 <br />Design support during construction November 2025–November 2026 <br />Fee <br />The estimated total contract amount to provide professional services identified in the scope of <br />services is offered on a time-and-materials basis, not to exceed $399,610, as shown in the table <br />below.
The URL can be used to link to this page
Your browser does not support the video tag.