Laserfiche WebLink
HDR ENGINEERING, INC. STAFF <br />City of Everett: Lexington-Broadway SW Improvements Phase 1, Amendment 1 <br />Billing Rates <br />STAFF PROJECT ROLE HOURLY RATES* <br />1 Martin, Erik Paul Managing Principal 406.18 <br />2 Bergstrom, Eric C PIC 386.14 <br />3 Hitch, Stephen James PM 317.18 <br />4 Bromberg, Kevin Matthew Project Accountant 125.25 <br />5 Kern, Benjamin Taylor Design Engineer 181.44 <br />6 Norberg, Edward R Sr. Civil 264.8 <br />7 Kinzer, Cindy Jean Sr. Civil 269.5 <br />8 Dexheimer, Jessica Jeanne (Jess) Civil EIT 134.37 <br />9 Schmidt, Adam Michael CAD / Drafter 183.81 <br />10 Golbuff, Graham Landscape Architect 137.82 <br />11 Smith, Caitlin May Landscape & Irrigation EIT 111.55 <br />12 Napiorkowski, Tomasz William (Tom) Traffic Designer 182.21 <br />13 Draheim, Daniel P (Dan) Technical Editor 160.42 <br />14 Rincon, Isabel C Electrical QC 340.29 <br />15 Gonzalez-Flores, Luis Manuel Electrical Engineer 186.05 <br />16 Nishimura, Shawn S Electrical CAD 205.95 <br />17 Johnson, Michelle Kathy Project Coordinator 134.43 <br />18 Rhodes, James G (Jim) QC Lead 276.74 <br />19 Adair, Tina M Technical Editor 182.72 <br />20 Megrditchian, John William Stormwater QC 229.54 <br />*Rates are in effect through December 31, 2025 and may be revised for appropriate cause.