My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
144 W MARINE VIEW DR 2025-09-29
>
Address Records
>
W MARINE VIEW DR
>
144
>
144 W MARINE VIEW DR 2025-09-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 1:16:03 PM
Creation date
8/27/2025 9:43:06 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
144
Permit
2024
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No. 094-23024 <br /> Page No. 5 <br /> 6.0 CONCLUSIONS <br /> 6.1 Asbestos <br /> None of the samples collected from the on-site structure contained one percent or more of asbestos. <br /> Contractors should be aware that concealed suspect asbestos-containing building materials may be <br /> uncovered during the course of demolition or renovation work. Contractors should have contingency <br /> plans that include stopping work, evacuation of the immediate area and sampling by a certified AHERA <br /> Building Inspector whenever these materials are found. Concealed suspect materials may include,but are <br /> not limited to: non-fiberglass pipe or roof drain insulation; spray-applied coatings; cement board; asphalt <br /> or paper vapor barriers; floorings;electrical wiring and adhesives. <br /> If discovered, all asbestos-containing materials that will be disturbed as a natural part of renovation and/or <br /> demolition are required to be removed and disposed of in accordance with Washington State regulations. <br /> State and local laws require that such abatement be performed using Certified Asbestos Workers under <br /> the direct on-site supervision by a Certified Asbestos Supervisor. <br /> Based on our conclusions,Krazan is making the following recommendations regarding asbestos: <br /> 1. A copy of this inspection report should be maintained at the project site during the duration of <br /> any renovations <br /> 2. A copy of this inspection report should be provided to the General Contractor and any Sub <br /> Contractors working on the renovation project <br /> 3. The inspection report is not intended to serve as a design document, or scope of work prior to <br /> teilovation <br /> Estimated Asbestos Abatement or Management Costs <br /> Asbestos-containing materials were not identified in the survey area as indicated above; therefore, <br /> asbestos abatement costs are not provided. <br /> 6.2 Lead <br /> The sample collected from the on-site structure did not contain greater than or equal to 0.5 percent by <br /> weight(5,000 ppm)lead. <br /> KRAZAN&ASSOCIATES,INC. <br /> With Offices Serving the Western United States <br /> 094-23024 Iiazmat Survey <br />
The URL can be used to link to this page
Your browser does not support the video tag.