My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2326 MCDOUGALL AVE 2025-09-12
>
Address Records
>
MCDOUGALL AVE
>
2326
>
2326 MCDOUGALL AVE 2025-09-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2025 8:57:19 AM
Creation date
8/27/2025 11:00:37 AM
Metadata
Fields
Template:
Address Document
Street Name
MCDOUGALL AVE
Street Number
2326
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> PLUMB 02- <br /> 4/6/2022 4/6/2022 GROUND BILLY APPLETON APPROVAL eTRAKiT Inspection Request <br /> WORK/SLAB <br /> Notes: <br /> 4/5/2022 5:10 PM JOSHUA BALTHIS <br /> Contact Name:JOSHUA BALTHIS <br /> Site Address:2326 MCDOUGALL AVE <br /> Phone:2532615992 <br /> e-Mail:joshbalthis@gmail.com <br /> 5/23/2022 5/23/2022 PLUMB 03-ROUGH BILLY APPLETON CORRECTION eTRAKiT Inspection Request <br /> IN REQUIRED <br /> Notes: <br /> 5/19/2022 2:36 PM JOSHUA BALTHIS <br /> Contact Name:JOSHUA BALTHIS <br /> Site Address:2326 MCDOUGALL AVE <br /> Phone:2532615992 <br /> e-Mail:joshbalthis@gmail.com <br /> (5/23/2022 11:46 AM BGA) <br /> 1.Absolutely no water piping of any kind can be run in the attic.It must be run under floor or through walls,or in such a manor as to adequately protect <br /> it from freezing per UPC CODE REF.312.6 <br /> 2.Venting through the roof does not meet the UPC requirements for cross-sectional.A 3 inch building drain requires two 2"vents,and one 1 1/2"vent, <br /> or any combination that is equal to or greater than the cross sectional area of the building drain. <br /> 3.End of line upper terminal clean outs are required on the washer and the kitchen sink Per UPC code. <br /> 4.Relief line for hot water tank must be installed and terminate outside of the building on Rough-in. <br /> 5/27/2022 5/27/2022 PLUMB 03i-ROUGH BILLY APPLETON NO ACCESS eTRAKiT Inspection Request <br /> Notes: <br /> 5/26/2022 10:03 AM JOSHUA BALTHIS <br /> Contact Name:JOSHUA BALTHIS <br /> Site Address:2326 MCDOUGALL AVE <br /> Phone:2532615992 <br /> e-Mail:joshbalthis@gmail.com <br /> I <br /> Printed:Wednesday, 27 August, 2025 2 of 3 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.