Laserfiche WebLink
STEP 4. COMPLETE MINIMUM REQUIREMENTS <br /> The more information provided in these subsections typically corresponds to faster review and permit <br /> issuance times. Submitted checklists that lack the necessary information for review are considered <br /> incomplete and will be returned unprocessed to the applicant. <br /> Preparation of Stormwater Site Plan <br /> The purpose of this task is to convey all relevant information aboutthe proposed project to the City for review <br /> to ensure the project is in compliance with the current City and State stormwater management standards. <br /> This is your opportunity to inform the reviewer about the project fundamentals as well as highlight the <br /> significant and insignificant aspects of the project with regards to stormwater management. <br /> Task 1: Describe existing site conditions <br /> Provide description of existing site conditions: <br /> Existing developed lot on city street in Everett. Site has street frontage and an <br /> alley behind. <br /> Describe existing structures (location, type): <br /> Existing single family home and detached garage. <br /> Describe slopes on your site (flat, rolling, steep, <br /> Flat. <br /> Describe hard surfaces (roof, ground treatment): <br /> Shingle Roof on house, Shingle Roof of garage, concrete walkways. <br /> Describe vegetative surfaces (location, quantity ft2): <br /> Grass and planters <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 6 <br /> the Combined Sewer Area-April 2021 <br />