Laserfiche WebLink
Areas on the site that have potential erosion problems: <br /> None known. <br /> Locations where surface water leaves the site: <br /> The surface water will leave the site into the street. <br /> Task 2: Select Construction Best Management Practices (BMPs) to be used on your project <br /> All new development and redevelopment projects are responsible for preventing erosion and sedimentation <br /> during construction.Each of the 13 requirements below contains a list of Best Management Practices(BMPs) <br /> that are accepted by the Washington State Department of Ecology(Ecology)for satisfying each requirement. <br /> The BMPs below are the most common. For a complete selection of BMPs please see Volume 11 of Ecology's <br /> Stormwater Management Manual for Western Washington. <br /> Each of the 13 Elements below must be considered in the SWPPP. Select all <br /> BMPs that you will be usingto satisfy each requirement.All requirements must <br /> 0 have at least one item selected. <br /> Element 1. Preserve vegetation/mark clearing limits: <br /> ❑ BMP C 10I:Preserving Natural Vegetation <br /> ❑ BMP C 102: Buffer Zones <br /> ❑ BMP C 103:High Visibility Plastic or Metal Fence <br /> ❑ Other Perthe SWMMWW: <br /> 0 Not applicable to my proposed project <br /> Explain: <br /> Element 2. Establish construction: <br /> ❑ BMP C 105:Stabilized Construction Entrance/Exit <br /> ❑ BMP C 106:Wheel Wash <br /> ❑ BMP C 107:Construction Road/Parking Area Stabilization <br /> ❑ Other Perthe 9A44,'MN . <br /> 0 Not applicable to my proposed project <br /> Explain: <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 10 <br /> the Combined Sewer Area-April 2021 <br />