My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2326 MCDOUGALL AVE 2025-09-12
>
Address Records
>
MCDOUGALL AVE
>
2326
>
2326 MCDOUGALL AVE 2025-09-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2025 8:57:19 AM
Creation date
8/27/2025 11:00:37 AM
Metadata
Fields
Template:
Address Document
Street Name
MCDOUGALL AVE
Street Number
2326
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2302-015 Description: REMODEL 900SF OF BASEMENT ADD WALLS/WINDOWS <br /> Applied:2/7/2023 Approved: 7/3/2023 Site Address: 2326 MCDOUGALL AVE <br /> Issued:7/3/2023 Finaled: 12/7/2023 City,State Zip Code: EVERETT,WA 98201-3032 <br /> Status: FINALED Applicant: MARTIN REIMERS,CONCEPT ARCH. <br /> Parent Permit:W2206-010 Owner: BALTHIS JOSHUA L&JENNIFER A <br /> Parent Project: Contractor: OWNER <br /> Details: <br /> "SEPARATE ELECTRICAL,MECHANICAL, PLUMBING PERMITS REQUIRED" <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 10/30/2023 11/2/2023 BLDG 08-FRAMING RAKEEB KHAN NOT READY <br /> Notes: <br /> Need rough in approval for all sub permits. <br /> Inspected on 10/30/2023 originally on permit B2010-058. <br /> BLDG 09-FIRE CORRECTION <br /> 10/30/2023 11/2/2023 STOPPING/BLOCKIN RAKEEB KHAN REQUIRED <br /> G <br /> Notes: <br /> Vertical Firestop from bottom plate to top plate behind exterior walls every 10 feet measured horizontally.Firestop all penetrations in top plate. <br /> Inspected on 10/30/2023 originally on permit B2010-058. <br /> 11/1/2023 11/2/2023 BLDG 08-FRAMING I RAKEEB KHAN APPROVAL <br /> Notes: <br /> Basement only. <br /> Inspected on 11/1/2023 originally on permit B2010-058. <br /> BLDG 09-FIRE <br /> 11/1/2023 11/2/2023 STOPPING/BLOCKIN RAKEEB KHAN APPROVAL <br /> G <br /> Notes: <br /> Basement only. <br /> Inspected on 11/1/2023 originally on permit B2010-058. <br /> 12/1/2023 12/1/2023 BLDG 16-FINAL RAKEEB KHAN CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 11/29/2023 3:40 PM JOSHUA BALTHIS <br /> Contact Name:JOSHUA BALTHIS <br /> Site Address:2326 MCDOUGALL AVE <br /> Phone:2532615992 <br /> e-Mail:joshbalthis@gmail.com <br /> Smoke detectors and co alarms should be interconnected throughout the home. Return stair handrails to wall.Previously gave ok to finish insulation <br /> and drywall at previous inspection. <br /> I <br /> Printed:Thursday,07 December,2023 1 of 2 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.