My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/08/27 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/08/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 9:02:28 AM
Creation date
8/28/2025 8:59:29 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/27/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Connecting people to life <br />Future Capital Projects <br />One-time Major Capital Projects <br />Project Name Description Estimated Cost <br />Everett Station Repair and <br />Updates Make updates to Everett Station $5,000,000 <br />Safety and Security <br />Enhancements <br />System-wide safety and security <br />enhancements $5,000,000 <br />Charging Infrastructure Upgrades Maintaining and upgrading the charging <br />systems to support the electric fleet.$25,000,000 <br />Technology Life Cycle <br />Maintenance & Upgrades <br />Ongoing operational costs for technology <br />maintenance and upgrades over time $5,000,000 <br />Bus Replacements 2025-2044 Capital expenditures for bus replacements <br />over the next 20 years $73,500,000 <br />Bus Stops & Shelters – <br />Replacements & Upgrades <br />Capital expenditures for bus stop upgrades <br />and shelter replacements.$2,500,000 <br />Paratransit Van Replacements <br />2025-2044 <br />Capital expenditures for paratransit van <br />replacements over the next twenty years $8,000,000 <br />Support Vehicles & Equipment <br />Replacements 2025-2044 <br />Capital expenditures for support vehicle <br />replacements over the next twenty years $3,000,000 <br />On-demand/microtransit service <br />(Fleet & Technology) <br />Capital expenditures for an on-demand <br />service $2,000,000 <br />Project Name Description Estimated <br />Cost <br />Operations Base Relocation <br />and Construction <br />Construction of a new operations <br />base.$100,000,000 <br />Vehicle Maintenance Facility <br />Relocation & Construction <br />Construction of a new vehicle <br />maintenance facility $75,000,000 <br />The Transportation <br />Element in the City’s <br />updated Comprehensive <br />Plan includes these <br />transit projects. <br />On-going Maintenance and Upgrades <br />(Costs are estimated for a 20 year-period)
The URL can be used to link to this page
Your browser does not support the video tag.