My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/08/27 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/08/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 9:02:28 AM
Creation date
8/28/2025 8:59:29 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/27/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />August 12, 2025 <br /> <br />Sabina Araya <br />Everett Transit <br />3201 Smith Avenue, Suite 200 <br />Everett, WA 98201 <br /> <br />Re: Comments on the draft Everett Transit 2025-2030 Transit Development Plan <br /> <br />Dear Ms. Araya: <br /> <br />Thank you for sharing the draft 2025-2030 Transit Development Plan with PSRC for <br />our review. We appreciate the ongoing collaboration and information sharing <br />between our two agencies as we work to ensure consistency across regional plans, <br />goals, and processes. <br /> <br />As in previous years, we reviewed the draft plan with a focus on three required <br />elements: local performance measures and targets, plan consistency, and regionally <br />significant projects. Below are PSRC’s comments on each of these elements. <br /> Local Performance Measures and Targets <br />Thank you for including a summary of safety performance actuals and targets <br />on Page 23 of the plan as well as sending the complete TAM and safety <br />actuals and targets in the PSRC templates in June. This data will help PSRC <br />report on the regional 2024 actuals and develop regional 2025 targets. <br /> <br /> Plan Consistency <br />The Plan Consistency section of the draft TDP (Page 24) provides a short <br />description of how Everett Transit’s planning efforts are coordinated with <br />citywide planning work, especially the comprehensive plan. The list of Everett <br />Transit projects from the 2044 Comprehensive Plan on Page 34 was very <br />helpful in demonstrating this coordinated planning. <br />
The URL can be used to link to this page
Your browser does not support the video tag.