My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/08/27 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/08/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 9:02:28 AM
Creation date
8/28/2025 8:59:29 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/27/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />2025 TDP – FINAL DRAFT 18 <br /> <br /> <br /> <br />PLANNED OPERATING CHANGES 2025-2030 <br />SERVICE <br />2025 • Add 500 revenue hours (Fall 2025 service change implementation) <br />• Service adjustments for schedule integrity and delivery optimization <br />• Improve maintenance return to service timelines for revenue service fleet <br />2026 • Add 2,000 revenue hours (full Fall 2025 service change realized) <br />• Service adjustments for schedule integrity and delivery optimization <br /> <br />2027 • Add 3,250 revenue hours (Extension of Route 19 to the Riverfront and Eclipse Mill Park) <br />• Service adjustments for schedule integrity and delivery optimization <br />• Long range system recalibration planning <br />2028 • Add 500 revenue hours <br />• Extend service to Riverfront <br />• Service adjustments for schedule integrity and delivery optimization <br /> <br />2029 • Add 500 revenue hours <br />• Service adjustments for schedule integrity and delivery optimization. <br />• Plan for integration of service with Community Transit’s Swift Gold Line <br /> <br />2030 • Add 500 revenue hours <br />• Service adjustments for schedule integrity and delivery optimization. <br />• Plan for integration of service with Community Transit’s Swift Gold Line <br /> <br />FLEET & EQUIPMENT <br />2025 • Install ORCA fare collection equipment in Paratransit fleet in preparation for integration with <br />ORCA <br />• Replace 14 fixed-route buses with electric buses <br />• Replace 7 fixed-route buses with refurbished R99 diesel buses <br />• Install 12 cabinet chargers <br />• Integration of on-route vehicle charging to maximize the electric fleet service range <br />2026 • Replace 7 paratransit vans <br />• Add 2 paratransit electric vans <br />• Replace 2 Road Supervisor vehicles <br />2027 • Replace 7 paratransit vehicles <br />• Replace Transit Operations and Public Works Complex power generator <br />• Replace 2 Road Relief support vehicles <br />2028 • Replace 7 paratransit vehicles <br />• Replace 9 fixed-route buses with hybrid-electric <br />• Replace 1 Road Supervisor vehicle <br />2029 • Replace 4 paratransit vehicles <br />• Replace Utility and Vault trailer <br />• Replace Transit Maintenance Facility air compressor
The URL can be used to link to this page
Your browser does not support the video tag.