Laserfiche WebLink
MW <br /> Moog <br /> AKEVIEW <br /> December 4, 2024 T R U C T U R A L <br /> Adam Grubbs NGINEERING <br /> Urban Complex <br /> 1 E Deer Valley Rd, Ste 207 <br /> Phoenix, AZ 85024 <br /> Sent via: Email <br /> Subject: Blu Water Apartments; Permit B2408-029 <br /> Garage Door Header <br /> Dear Adam, <br /> At your request I have sized a header for the proposed 9-foot wide by 8-foot tall garage door. The door <br /> will replace the three windows currently on the wall. The door will support some roof and snow loads <br /> due to the hip roof framing on that wall. Based on a 25 psf snow load and 12 psf dead load the following <br /> options may be used for the proposed garage door header: <br /> - 4x8 DFL2 header <br /> - 3.5"x7.5" Glulam header, Grade 24F-V4 <br /> The header should be supported on double jack studs at each end and have at least two king studs on <br /> each end of the opening. <br /> Please feel free to contact me if you would like to discuss any of these items in more detail or if you <br /> have any questions. You can reach me by phone at(206) 914-9536, or by email at <br /> LakeviewSE@outlook.com. <br /> Sincerely, <br /> SHALL C' <br /> WAS, fr Q� <br /> Jon Conner, PE, SE <br /> Lakeview Structural Engineering <br /> .p 44672F4 W� <br /> ALE�G <br /> SIONAL E� <br /> 12/04/24 2:26 PM <br />