My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4418 29TH AVE SE 2017 Plans 2025-08-28
>
Address Records
>
29TH AVE SE
>
4418
>
Plans
>
4418 29TH AVE SE 2017 Plans 2025-08-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 2:14:04 PM
Creation date
8/28/2025 11:33:59 AM
Metadata
Fields
Template:
Address Document
Street Name
29TH AVE SE
Street Number
4418
Permit
C1707-003
Year
2017
Notes
SFR BASIC/2015 IRC RB1502-004
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRAWL SPACE VENTING: LOCATION OF DOWNSPOUT RISER BOOTS REVISED <br />REQUIRED: 867 SF/300 = 2.89 SF = 417 SQ. IN. 3020 vwC FOUNDATION PLAN <br />PROVIDED: 580 S0. IN. - 8 VENTS @ 725 S0. IN. <br />LOCATE VENTS WITHIN 36" OF CRAWLSPACE CORNER, 1/4 "=i $1-0" <br />UNLESS NOTED. SEE D1 CRAWLSPACE NOTE FOR <br />GROUND COVER. <br />FRAMING CONTRACTOR SHALL <br />VERIFY HOLDOWN LOCATIONS PRIOR ALL EXTERIOR SHEARWALLS <br />TO POURING FOUNDATION. SHALL BE P6TN U.N.O. <br />FOUNDATION NOTES <br />L E G E N D <br />2x10 @ 16" OC UNLESS NOTED <br />SHEAR WALL- SEE NOTES ON THIS SHEET <br />FB FLUSH BEAM <br />HDR HEADER - SEE S1.0 FOR LUMBER VALUES <br />—� DOWNSPOUT: PROVIDE TIGHT LINE & RISER BOOT <br />+##" ELEVATION AT TOP OF CONCRETE <br />+##" FINISH SLAB ELEVATION <br />® (Z) POST SIZE & NUMBER OF BUNDLED STUDS <br />SEE STRUCTURAL SHEET S1.0 FOR ALL FLOOR SHEATHING HANGERS NOTED ARE SIMPSON STRONG -TIE. <br />NAILING AND OTHER PERTINENT STRUCTURAL INFORMATION. <br />ALL PONY WALLS IN CRAWL SPACE ARE 2x4 STUDS <br />UNLESS NOTED. <br />SHEAR WALLS SHOWN AT FOUNDATION WALLS ARE FOR <br />PLATE ANCHOR PLACEMENT. SEE SHEAR WALL SCHEDULE <br />FOR SPACING. <br />WHERE SHEAR (PONY) WALLS IN CRAWL SPACE REQUIRE <br />PLYWOOD. IT MUST BE APPLIED TO THE SIDE OF STUD <br />WALL WITH THE SYMBOL. SOME PLYWOOD SHEAR WALLS <br />MAY REQUIRE 3x4 STUDS. SEE SHEAR WALL TABLE ON <br />SHEET S1.1. <br />ALL WOOD IN CONTACT WITH CONCRETE OR EARTH SHALL <br />BE PRESSURE -TREATED AND STAMPED BY AN APPROVED <br />AGENCY. ALL EXTERIOR COLUMNS, BEAMS AND <br />JOISTS EXPOSED TO THE WEATHER SHALL BE <br />PRESSURE -TREATED. <br />SEE SHEETS S9.0, & S9.1 FOR TYPICAL WOOD FRAMING <br />DETAILS. <br />ON FOUNDATION WALLS: FOR TYPE "P" (PLYWOOD) <br />SHEAR WALLS, PROVIDE AN EXTRA ANCHOR BOLT EACH <br />SIDE OF VENT. <br />PROVIDE 4" PERFORATED FOOTING DRAINS AT PERIMETER <br />OF ALL BUILDINGS. <br />STEP FOOTINGS AS REQUIRED TO REACH FIRM BEARING - <br />SEE 4, 5/S6.0. <br />FOUNDATION VENTS PROVIDE 72.5 SQ. IN. NET FREE AREA <br />PER STUD SPACE. <br />CONCRETE FOUNDATION WALLS *ARE 8" THICK UNLESS <br />NOTED OTHERWISE. <br />FINISHED SURFACE AROUND THE BUILDING SHALL SLOPE <br />AWAY NO LESS THAN 2% FOR AT LEAST 5 FEET. <br />COVER CRAWL SPACE FLOOR WITH 6 MIL. POLYETHYLENE <br />VAPOR BARRIER. <br />5052 REGISTERED <br />ARCHITECT <br />ROBERT E. WEIBLE <br />STATE OF WASHINGTON <br />-a <br />a� <br />c� <br />as <br />�x <br />c <br />`> <br />z <br />a� <br />w <br />i <br />c <br />a <br />0 <br />0 <br />CV <br />� <br />O <br />Ct <br />0 <br />V <br />o <br />Z <br />LJ <br />o <br />i <br />a <br />G <br />LO <br />r <br />a <br />o <br />r <br />M <br />O <br />o <br />m <br />c <br />3 <br />a <br />L <br />= <br />-a <br />0 <br />um <br />O <br />a <br />r <br />�n <br />d' <br />i <br />Q <br />it <br />� <br />R5 <br />CL <br />o> <br />0 <br />E <br />N <br />4w <br />N <br />d? <br />•_ <br />+� <br />i <br />0 <br />Z <br />n <br />M <br />s <br />> <br />m <br />>% <br />IDS <br />m <br />... <br />U <br />0 <br />a. <br />Job No.: 14-38 <br />Sheet No.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.