My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4418 29TH AVE SE 2017 Plans 2025-08-28
>
Address Records
>
29TH AVE SE
>
4418
>
Plans
>
4418 29TH AVE SE 2017 Plans 2025-08-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 2:14:04 PM
Creation date
8/28/2025 11:33:59 AM
Metadata
Fields
Template:
Address Document
Street Name
29TH AVE SE
Street Number
4418
Permit
C1707-003
Year
2017
Notes
SFR BASIC/2015 IRC RB1502-004
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br />SHEARWALL SCHEDULE - 7/1 E" APA RATED SHEATHING W/ HEM --FIR STUDS AND HEM -FIR PLATES <br />_ WALL PANEL FIELD BOTTOM PLATE O RIM OR BLOCKING TO TOP PLATE CONN. FRAMING FOUNDATION ANCHOR BOLT <br />SHEARWALL PER PLAN TYPE EDGE NAILING NAILING " " AT ADJOINING SILL PLATE SPACING o <br />(1) ROW BOTTOM PLATE NAILING PER (3) ROWS SHEATHING 0.148 x3.25 LTP4 DIRECT <br />NAILING A35 ONLY 10 PANEL 5/8 DIA. ao <br />RE: 14/81.1. & 10/S1.1 SHEARWALL SCHEDULE RE: 14/S1.1 & 10/81.1 ® ROWS SPACING TOENAIL TO FRAMING EDGES Q 7' EMBED <br />RE: 2/S1.1 RE: 14/S1.1 & 1O/S1.1 P6TN 7/16" SHT. 6' O.C. 12" O.C. {1} 4' O.C. 4" O.C. N/A N/A 2x 2x 48" O.C. <br />FOR BALANCE ONE SIDE <br />PEN FLOOR SHEATHING 3x 48" O.C. <br />OF SECTION RE: 2/S1.1 7 16" SHT. 6" O.C. 12' O.C. (1) 4" O.C. N A 16' O.C. 2x 2x 48" O.C. C.?' <br />RE. NOTES SECTION 06160 FOR BALANCE P6 / 24 O.C. 3x 48' O.C. Z_ <br />FLOOR DIAPHRAGM EDGE NAILING OF SEC11ON ONE SIDE <br />RE: NOTES SECTION 06160 P4 7/16" SHT. " " 2 " 16" O.C. " 2 2x OR 3x 2x 32m O.C. <br />4 O.C. 12 O.C. O 6 O.C. w <br />2x BLKG. W/.148"DIA.x3 0 3"OC <br />ONE SIDE N/A 12 O.C. O 3x 40 O.C. C\2 00 <br />BLOCK TO RIM o <br />2x CONT. RIM P3 7/16" SHT. 3" O.C. 12. O.C. (2) 4" O.C. N/A 12' O.C. 10" O.C. (2)2x OR 3x 2x 24' O.C. ® C° <br />0 <br />ONE SIDE 3x 22 O.C. u <br />U) co <br />CONT. 4x RIM 7 i6" SHT. " 2x 18" O.C. rn <br />12 O.C. (3) 6 O.C. N/A 10 O.C. 10 O.C. (2)2x OR 3x 3x 24" O.C. ( o <br />SHEARWALL PANEL EDGE NAILING P2 f 2" O.C. " " " <br />PEN 2x CONT. RIM PER SCHEDULE PEN � +, � <br />ONE SIDE _ <br />7/16" SHT. 4" O.C. " " " " 2x 16' O.C. •� <br />2P4 12 O.C. (3) 5 O.C. N/A 10 O.C. 10 O.C. (2)2x OR 3x 3x 20' O.C. <br />RIM LOCKING TO TOP PLATE RIM/BLOCKING TO TOP PLATE BOTH SIDES W <br />R1M/BLOCKING TO TOP PLATE � _ � <br />CONN. PER SHEARWALL SCHEDULE 7 ifi" SHT. '' " " 2x 12" O.C. o .� <br />CONN. PER SHEARWALL CONN. PER SHEARWALL 2P3 / 3 O.C. 12 O.C. (3) 4 Q.C. N/A 8'� O.G. 8" O.C. (2}2x OR 3x p <br />�35 ATP4 W/(12) 0.131 DIA. X 3x 16 O.C. �, <br />SCHEDULE A35/LTP4 BOTH SIDES Lo <br />SCHEDULE A35/L1P4 W/(12} / " " <br />0.131' DIA. X 2 1 /2" W/(12) 0.131" DIA, X 2 1 /2" 7 i 6' SHT. " " " 2x 8 O.C. -'-' .� Lo <br />2P2 / 2 O.C. 12 Q.C. (3) 3 O.C. N/A 6' O.C. 6 O.C. (2)2x OR 3x 3x 12" O.C. z co <br />SHEARWALL PER PLAN SHEARWALL PER PLAN SHEARWALL PER PLAN BOTH SIDES <br />SCALE: NONE SCALE: NONEco <br />SHEARWALL SCHEDULE NOTES: CQ <br />o <br />TYPICAL EXTERIOR SHEARWALL CONNECTION TYPICAL EXTERIOR SHEARWALL CONNECTION TYPICAL EXTERIOR SHEARWALL CONNECTION 1. STUDS SHALL NOT BE SPACED MORE THAN 16" O.C.. -=- <br />2. RE: S1.0 SECTION 06100 ROUGH FRAMING FOR REQUIRED WALL STUD AND PLATE SPECIES AND GRADE. <br />P6TN & P 6 QQ,�, P21 2 P 4 2P31 2 P 2 ON 06160 "WOOD SHEATHING' FOR REQUIRED SHEAR WALL SHEATHING THICKNESS AND GRADE. ALL SHEAR WALL PANELS SHALL BE APPLIED DIRECTLY TO FRAMING. <br />P � CX, P � _ � 3. RE. S1.0 sECTI <br />4. SHEATHING PANELS MAY BE INSTALLED EITHER HORIZONTALLY OR VERTICALLY WITH ALL PANEL EDGES BACKED/BLOCKED WITH 2' NOMINAL OR WIDER FRAMING. SEE NOTE 5. U <br />5. FRAMING MEMBERS RECEIVING EDGE NAILING FROM ABUTTING PANELS SHALL NOT BE LESS THAN 3" NOMINAL AND NAILS SHALL BE STAGGERED FOR ALL SHEARWALL MARKS EXCEPT "P6". <br />PROVIDE 3X3XO.229' PLATE 6. WHERE PANELS ARE APPLIED ON BOTH FACES OF A WALL AND NAIL SPACING IS LESS THAN 6' O.C. ON EITHER SIDE, PANEL JOINTS SHALL BE OFFSET TO FALL ON DIFFERENT FRAMING MEMBERS OR <br />WASHER 0 EA. ANCHOR (TYP. FOUNDATION SILL PLATE AND STUDS FRAMING SHALL BE 3" NOMINAL OR THICKER AND NAILS SHALL BE STAGGERED. <br />U.N.O.) PER SHEARWALL SCHEDULE (TYP.) 7. NAILS FOR PLYWOOD AND OSB PANEL EDGE AND FIELD NAILING SHALL BE 8d COMMON (0.131" X 2 1/2"). <br />8. NAILS FOR BOTTOM PLATE FRAMING SHALL BE 12d COMMON (0.148 X 3.25 ). - ►n <br />9. FLOOR DIAPHRAGM NAILING SHALL BE PLACED BETWEEN THE SPACING CALLED OUT FOR BOTTOM PLATE NAILING. DO NOT OVER NAIL THE BLOCKING. 1 <br />10. ANCHOR BOLTS SHALL BE GALVANIZED 5/8' DIAMETER A-307 AND SHALL BE SECURED IN PLACE PRIOR TO CONCRETE POUR. WET STICKING OF ANCHOR BOLTS IS NOT ALLOWED. `�hr o <br />11. GALVANIZED 3" X 3' X 0.229' (MIN.) PLATE WASHERS ARE REQUIRED AT EACH ANCHOR BOLT - SEE 8 THIS SHEET FOR PLACEMENT REQUIREMENTS. RECESSING PLATE WASHERS IN PLATES IS NOT ALLOWED. r `� <br />12. LTP4 FRAMING PLATES SHALL BE INSTALLED WITH 12-$d X 1 1/2" (0.131' X 2 1/2") NAILS. RE: DETAILS 1, 2, & 3. '~ ~ <br />�a <br />ANCHOR BOLT PER SHEARWALL 13. A35 FRAMING ANGLES SHALL BE INSTALLED WITH 12-8d X 1 1/2' (0.131" X 1 1/2') NAILS. RE: DETAILS 1, 2, & 3. IOF a <br />SCHEDULE • . ' 14, ALL NAILS INTO PRESSURE TREATED WOOD SHALL BE HOT -DIPPED GALVANIZED CONFORMING TO ASTM 153 OR STAINLESS STEEL. N co o <br />° 15. ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY SHALL BE PRESERVATIVE TREATED. <br />• <br />° 16. WHERE BOTTOM PLATE NAILING SPECIFIES A SPACING OF 4 INCHES OR LESS NAILS SHALL BE INSTALLED IN TWO ROWS OFFSET 1/2 INCH AND STAGGERED. <br />44 ° ° <br />° 17. GALVANIZED EXPANSION ANCHORS OF SIMILAR. DIAMETER AND EMBEDMENT ALLOWED AT INTERIOR BEARING AND PARTY WALLS. a <br />o a d Q ° ° ° 18. 2-2x S IN LIEU OF 3x S AT PANEL EDGES ACCEPTABLE PROVIDED STUDS ARE ATTACHED PER 10/81.2 SIM. AND BOTTOM PLATE NAILING. <br />19. WHERE BUILDING OFFICIALS ALLOW, OSB SHEATHING MAY BE APPLIED OVER 1/2 OR 3/8* GYPSUM WALL BOARD PROVIDED SHEATHING IS NAILED WITH 10d NAILS (0.148 DIA X 3" LONG) <br />° ° SHEARWALL SCHEDULE �, cn <br />z HEAD -OUT FOR d° a � 0 <br />RIM JOIST w � � � � cn <br />PLUMBING, MECH., ' � ° !- m o o <br />ETC. FOUNDATION PER PLAN PLYWOOD ROOF SHEATHING Q V_ 00 M ,� N <br />Q- SCALE: 3/4" = i'-0' SIMPSON LTP4 la o o a <br />SIMPSON LTP4 W/(12) 0.131" DIA. X 1 1 /2" 10 DIAPHRAGM EDGE NAILING r <br />Q i TYP. SHEARWALL ANCHOR BOLT TO CONC. W/(12) 0.131" DIA. x 2 1/2" WHEN APPLIED DIRECT TO FRAMING w <br />2x10 <br />m WHEN APPLIED OVER SHEATING 1RUSS/JOIST BLOCKING w o <br />NOTE: PLATE WASHER SHALL EXTEND WITHIN 1 /2" OF EDGE OF BOTTOM SCALE: NONE <br />�+ BLOCKING CONNEC11ON TO `o <br />I PLATE ON SIDE(S) WITH SHEATHING. PROVIDE STAGGERED/OFFSET <br />I PLACEMENT AS SHOWN ELSE OVESIZE PLATE WASHERS AS REQUIRED. 6 TYPICAL SIMPSON LTP4 -- -- -- -- -- �- - -- TOP PLATE o <br />I I U210 HANGER Tr----I-----n----�r ---------TI <br />-----T. T.I.. <br />U 4z <br />O <br />► t I EA. END 11 11 11 I! I . <br />FRAMING AT Z <br />I �''�`' I I • PANEL EDGES a <br />I I 11 I I I l I <br />U210 HANGER 11 11 11 11 I'.I '........I'i. l.'LIJ <br />I 14.ac cn <br />I I 2x10 JOIST PER PLAN 1 I <br />I I (16" O.C. U.N.O. PER a o 8 0 $ z z Q Q <br />ILuw 1 II I1 II I II I.L.11.1. No�� <br />I W m w m Q <br />I PLAN) � V) W SHEARWALL BEYOND PER I ( 1 - - (-- - - - , <br />z t I w w � a SHEAR WALL SCHED. TYP. cn <br />N i 2x10o cn <br />o i I CONTINUOUS COIL STRAP* 1.1 1 1 I I 11 0 w w <br />DRAG STRUT PER PLAN w w in <br />1-4 1-4 FOR JOIST SPANS UP TO L LLJ <br />i1'-0', A SINGLE JOIST W JOIST PER PLAN - TYP. I ( NOTE: z M N w <br />I I MAY BE HEAD OFF TO U, °, I MINIMUM SIZE OF SHEATHING } uj <br />ADJACENT SINGLE JOISTS � SHALL BE 2'-O" X 4'-0" 1 -4„ <br />I I Q Q `�' -"� DEDICATE STUD BAY AT <br />°- PLYWOOD FLOOR SHEATHING BLOCK ALL PLYWD. EDGES NOT SUPPORTED BY END OF SHEARWALL FOR <br />s 8 <br />z z z z RE: NOTES 06160 FRAMING MEMBER. HOEDOWN. <br />I i FOR JOIST SPANS <br />I BETWEEN 11'-0" AND o 1/ M o 0 oI IL BOTTOM PLATE CONNECTION 11 <br />16'-0" ADD ADDITIONAL � RE: 1, 2 & 10 S1.1 .I .. . <br />I 10 JOIST ADJACENT TO BLOCKING OR BEAM / .I �I..... <br />I PER PLAN I ( I ADD'L STUDS FOR HOEDOWN <br />I I HEAD OUT. i 3/4" MIN. 1 3/4" MIN. 1 3/4" MIN. i 3/4" MIN. DIAPHRAGM EDGE NAILING I I I <br />I " ( I:.........I.1 PER SCHEDULE. <br />I I 2" MAX. 2" MAX. 2" MAX. 2" MAX. 1 3/4 MIN. SHEARWALL BEYOND PER 1 I I. rw0ii <br />I I " NOTE: JOIST HEAD -OUT IS MAX. SHEARWALL SCHED. TYP. 11 1 I I i I. L .................I 1 <br />z i � ct <br />I I FOR UNIFORMLY LOADED 1• I I• I I• I I �I:.::. ' ... (' I <br />W i i- FLOOR JOIST ONLY*CONTINUOUS <br />_--- ---____-- _ ____-- �- COIL STRAP I 1 i......... �. CONT. 2x RIM <br />I _ - - _ I DRAG STRUT PER PLAN I 1 I I I I I 1 I'1. 1'1 W/BLOCKING IF REQUIRED <br />I I ii is it _ <br />I " tilt " ,�, " �CS20 - - - - - - - - - - - <br />m �� � � � � 0.148" DIA. X 2 1/4" AT 6" O.C. <br />WALL BELOW STAGGERED WALL ABOVE BLOCKING OR CONTI RIM CONNECTION TO TOP PLATE <br />PLAN - JOIST HEAD -OUT " " <br />2x4, 3x4 PLY ONE SIDE 2x4, 3x4 PLY TWO SIDES 2x6, 3x6 PLY ONE SIDE 2x6, 3x6 PLY TWO SIDES (14) 0.148 DIA. X 2 1/4 AT Q <br />SHEARWALL ..� <br />SCALE: 3/4' = 1'-0" SCALE: 3/4' 1'-0" SCALE: 3/4' = 1'-0' HOLDOWN PER PLAN <br />-. -.. - - _ - = -' - - _ _ _ _ = _ ' SEE SCHEDULE RE: 10/51.2 ct <br />7 TYPICAL JOIST HEAD -OUT DETAILS 8 ANCHOR BOLT PLACEMENT DETAILS 9 TYPICAL DRAG STRUT DETAILS --7�- -� ���---_��.__-------���:-r <br />1 PROVIDE PANEL AT NAILING <br />AT END OF WALL STUDS THAT <br />1. EXTERIOR BEARING 1 1 j (1 I 1 j FRAMING AT (�� I `1.I . ATTACH TO HOLDOWNS TYPICAL . <br />SUPPORT 1' 1 '1 101 ( PANEL EDGES <br />I 1 I 1 I 11 '1`r H. 11 AT ADJOINING PANEL EDGES PROVIDE <br />3 1 /2" - - - - - - - i - - - - - i - - - I PANEL EDGE NAILING AND FRAMING PER <br />S1M. ®2 2x FRAMING AT (1) 1 1 /2 (2) 1 1 /2" CONT. � � 1 I 1 I I 1 1 ( I ( I. �.. � Q <br />O SOLID I •� \ I( r I I I I r 1 I I ROOF/FLOOR SHEATHING NOTES I I 11 11 1 ( •� .1• SHEARWALL SCHEDULE (STAGGER NAILS) 0 <br />ADJOINING PANEL EDGES. CONT, RIM RIM PLUS BLOCKING RIM I �. 1 f' 11 1 r 1 I 1 l,l ( •1 <br />BELOW BELOW ( I - - 1- - - -- I I I .. _ .... BLOCK ALL PLYWOOD EDGES NOT ..� <br />BELOW 1 ''TI '� 1 I r I� .� 1 I r 1, BOUNDARY NAILING AT ROOF/FLOOR PERIMETER, AT CONT. <br />L.� 1 - - - - -- , <br />r'' 11 \ 1 I r 11 1 I r r 1 PANEL EDGES (B.N.) 1 I (� r I ' r r I1 11 I I I I PORTED MEMBERS 7 AND <br />NAIL EL EDGE NAILING QrT�1 <br />� <br />r r 2• PANEL EDGE NAILING (P.E.N.) AT ALL EDGES OF ALL PLYWOOD 1 11 11 11 O <br />RIM TO BLOCKING I r I I 11 11 11 -� 1 <br />r r SHEETS AT SUPPORTS AND AT INTERIOR SHEARWALLS 1'j I I 1 GALVANIZED ANCHOR BOLT RE: 5/811 u <br />J� � .148"DIA.x3' NAILS J �, I r '� 1 I 11 r 1 I 11 1 <br />a ®3"OC TYPICAL `f' r r r " 1 1 1 1 FIELD ...........•}`j: C' W/ 3 X 3 X 0.229" GALVANIZED WASHER <br />w = W = I ( r ,� ` I I r i�l ` 3• 1 3, INTERIOR FIELD NAILING (F.N.) 12 O.C. AT BEARING SUPPORTS ( NAILING *"'� �'' <br />C)ct <br />% C' I I I r 1 I 1 I •- I I I I I 11....... ' .. fi .1. DIA./FACING PER SHEARWALL SCHEDULE. 0 u <br />l l r r I I I I r r I I 4. SEE PLANS FOR PLYWOOD THICKNESS & NAILING SCHEDULE 7 ' <br />(I (_ �............ . . i .I FOUNDATION SILL PLATE � <br />LONG DIMENSION OF PLYWOOD SHALL RUN PERPENDICULAR 1 • I I . I.. ' ....... .1 9 1'.I . STAGGER NAILING 0 <br />1 1 /4" �/4„ ` �. r r ( ` `' I I r / 11 ` 5' I I 1 ( 11 1.1 .1'I: L• RE: SHEARWALL SCHEDULE FOR SIZE Q r--�cn <br />1 � ` I I r r ,� ` ( TO TRUSS FRAMING &FLOOR FRAMING. � . � . � . � ... � � <br />1 I I L,...-- 2. <br />(1 ) ROW (2) ROWS (3) ROWS r " HOEDOWN ANCHOR PER PLANct <br />1 �. r I I I I �, 11 11 r 1 6, MIN. EDGE DISTANCE FOR NAILS SHALL BE 3/8 1 1 1• 1.1 I I L1 1 ... SEE SCHEDULE E: 10 S1.2Lt <br />CENTERED ON CENTERED ON CENTERED ON 1 r r I I 1 I r 11 �, I I r r 1 11 11 1 1 I I I I R / -' <br />RIM BELOW RIM & BLKG BELOW RIM BELOW `, r r " " = t'' <br />7, MINIMUM PLYWOOD SHEET SIZE 2 -0 X 4 -0 ....:.:.:..:. <br />1 1 11 11 I ( I CONCRETE FOUNDATION <br />P6TN �C P 6 P OG P P 2 8. NAILS SHALE NOT BE OVER DRIVEN _ - _ _ - - - - - - _ - - <br />�r%� W <br />°.I J a 1 I^ A 1 a I <br />II A ° ' a tl ^ I` a. all all:: !� ^ ^ ^ t PROVIDE MINIMUM OF TWO BOLTS PERmi <br />° : a L� �L .� PLATE WITH ONE BOLT NOT LOCATED <br />^ ' ^ : a a ; ° ^ .. MORE THAN 12 INCHES OR LESS THAN <br />a ° A (7) BOLT DIAMETERS FROM THE END. 10 <br />- SEE DETAIL 8 THIS SHEET <br />SCALE: NONE SCALE: NONE SCALE: NONE <br />11 TYPICAL ROOF/FLOOR SHEATHING LAYOUT 12BOTTOM PLATE NAILING PATTERNTYPICAL SHEARWALL NOMENCLATURE (ELEVATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.