My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3904 FEDERAL AVE 2025-09-11
>
Address Records
>
FEDERAL AVE
>
3904
>
3904 FEDERAL AVE 2025-09-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2025 10:24:41 AM
Creation date
8/29/2025 7:41:17 AM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
3904
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOLG . N <br /> P O W E R <br /> January 27, 2022 <br /> Subject: Proposed Solar Panel Installation <br /> Aaron Gay Residence, 3904 Federal Ave, Everett,WA <br /> To Whom it May Concern, <br /> Our engineering department has reviewed information, gathered by our field crews, related to the proposed solar <br /> panel installation at the above-referenced address. The purpose of our review was to determine the structural <br /> adequacy of the existing roof. Based on our review and analysis of the available information, and in accordance with <br /> governing building codes, it is our professional opinion that the existing structure is permitted to remain unaltered <br /> for the proposed solar installation. <br /> Design Parameter Summary <br /> Governing Building Code: 2018 Washington Building Code (2018 IBC) <br /> Risk Category: II <br /> Design Wind Speed: 110 mph (per ASCE 7-16) <br /> Ground Snow Load: 15 psf <br /> Roof Information <br /> Roof Structure: 2x6 Rafters @ 24" O.C. <br /> Roofing Material:Asphalt Shingles(1 layer) <br /> Roof Slope: 26 degrees <br /> Roof Connection Details <br /> Lag Screws: 5/16" diameter min.,with min. 1.5" embedment into framing members,at 48" O.C. max,staggered <br /> Locations per design drawings <br /> Note:Required embedment length excludes the tapered tip of the screw,and embedment into sheathing. <br /> Analysis <br /> The proposed installation - including weight of panels, racking, and mounts - will be approximately 2.76 psf. In the <br /> areas where panels are installed, roof live loads will not be present. The reduction of roof live load is adequate to <br /> fully or partially compensate for the addition of the panel installation. Because the member forces in the area of the <br /> solar panels are not increased by more than 5%, the stresses in the members are not increased by more than 5%, <br /> and so per section 806.2 of the International Existing Building Code (IEBC), the structure need not be altered for <br /> gravity loading. <br /> The proposed installation will be 6" max. above the roof surface (flush mounted) and parallel to the roof surface. <br /> Therefore, any increase in wind loading on the building structure from the solar panel installation is expected to be <br /> negligible. Wind is the governing lateral load case. Because the increase in lateral loading is not increased by more <br /> than 10%, per section 806.3 of the adopted IEBC,the structure need not be altered for lateral loading. <br />
The URL can be used to link to this page
Your browser does not support the video tag.