Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 4/8/2024 4/8/2024 BLDG 12- Matt Schreifels NOT READY eTRAKiT Inspection Request <br /> INSULATION <br /> Notes: <br /> 4/3/2024 1:21 PM BURTON CONSTRUCTION INC <br /> Contact Name:BURTON CONSTRUCTION INC <br /> Site Address:528 MADISON ST <br /> Phone:5094684932 <br /> e-Mail:bscott@BURTONCONSTRUCTION.NET <br /> Must have rough in approval for mechanical in floor prior insulation and approval for floor cover.Reschedule for underfloor insulation when ready. <br /> 4/10/2024 4/10/2024 BLDG 12- Matt Schreifels PARTIAL Underfloor Insulation <br /> INSULATION APPROVAL <br /> Notes: <br /> Approval is for under floor,insulation at sleepers in converted garage area <br /> 4/16/2024 T4/16/2024 BLDG 08 FRAMING Matt Schreifels PARTIAL eTRAKiT Inspection Request <br /> APPROVAL <br /> Notes: <br /> 4/15/2024 7:35 AM BURTON CONSTRUCTION INC <br /> Contact Name:BURTON CONSTRUCTION INC <br /> Site Address:528 MADISON ST <br /> Phone:5094684932 <br /> e-Mail:bscott@BURTONCONSTRUCTION.NET <br /> Garage conversion framing.Obtain plumbing permit prior to covering areas where plumbing is located. <br /> 4/16/2024 4/16/2024 BLDG 12- Matt Schreifels APPROVAL eTRAKiT Inspection Request <br /> INSULATION <br /> Notes: <br /> 4/15/2024 7:35 AM BURTON CONSTRUCTION INC <br /> Contact Name:BURTON CONSTRUCTION INC <br /> Site Address:528 MADISON ST <br /> Phone:5094684932 <br /> e-Mail:bscott@BURTONCONSTRUCTION.NET <br /> Garage conversion area. <br /> 4/17/2024 4/17/2024 BLDG 10-DRYWALL Matt Schreifels PARTIAL eTRAKiT Inspection Request <br /> NAILING APPROVAL <br /> Notes: <br /> 4/16/2024 12:46 PM BURTON CONSTRUCTION INC <br /> Contact Name:BURTON CONSTRUCTION INC <br /> Site Address:528 MADISON ST <br /> Phone:5094684932 <br /> e-Mail:bscott@BURTONCONSTRUCTION.NET <br /> Pulled forward per contractor request. <br /> approved from mud and tape of converted garage area only. <br /> Do not cover openings in existing wall areas where plumbing rough-in inspections are needed. <br /> I <br /> Printed:Tuesday, 18 June, 2024 2 of 3 <br /> SUPERION <br />