My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3322 BROADWAY COMPASS HEALTH 2025-10-03
>
Address Records
>
BROADWAY
>
3322
>
COMPASS HEALTH
>
3322 BROADWAY COMPASS HEALTH 2025-10-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2025 3:03:26 PM
Creation date
9/3/2025 7:38:51 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3322
Tenant Name
COMPASS HEALTH
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
997
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reporting (6.2) <br />Discharge Monitoring Reports (6.2.1) <br />Cumulative soil disturbance is one (1) acre or larger; therefore, Discharge Monitoring <br />Reports (DMRs) will be submitted to Ecology monthly. If there was no discharge during a given <br />monitoring period the DMR will be submitted as required, reporting "No Discharge". The DMR <br />due date is fifteen (15) days following the end of each calendar month. <br />DMRs will be reported online through Ecology's WQWebDMR System. <br />https://www.ecology.wa.gov/Regulations-Permits/Guidance-technical-assistance/Water-quality- <br />permits-guidance/WQWebPortal-guidance <br />Notification of Noncompliance (6.2.2) <br />If any of the terms and conditions of the permit is not met, and the resulting noncompliance may <br />cause a threat to human health or the environment, the following actions will be taken: <br />1. Ecology will be notified within 24-hours of the failure to comply by calling the applicable <br />Regional office ERTS phone number (Regional office numbers listed below). <br />2. Immediate action will be taken to prevent the discharge/pollution or otherwise stop or <br />correct the noncompliance. If applicable, sampling and analysis of any noncompliance <br />will be repeated immediately and the results submitted to Ecology within five (5) days of <br />becoming aware of the violation. <br />3. A detailed written report describing the noncompliance will be submitted to Ecology <br />within five (5) days, unless requested earlier by Ecology. <br />Anytime turbidity sampling indicates turbidity is 250 NTUs or greater, or water transparency is 6 <br />cm or less, the Ecology Regional office will be notified by phone within 24 hours of analysis as <br />required by Special Condition S5.A of the CSWGP. <br />• Northwest Region at (425) 649-7000 for Island, King, Kitsap, San Juan, Skagit, <br />Snohomish, or Whatcom County <br />Include the following information: <br />1. Your name and / Phone number <br />2. Permit number <br />3. City / County of project <br />4. Sample results <br />5. Date / Time of call <br />6. Date / Time of sample <br />7. Project name <br />In accordance with Special Condition S4.D.5.b of the CSWGP, the Ecology Regional office will <br />be notified if chemical treatment other than CO2 sparging is planned for adjustment of high pH <br />water. <br />
The URL can be used to link to this page
Your browser does not support the video tag.