Laserfiche WebLink
B. BMP Detail <br />Element #1 - Mark Clearing Limits <br />BMP C103 High Visibility Plastic or Metal Fence <br />Element #2 - Establish Construction Access <br />BMP C105 Stabilized Construction Access <br />BMP C107 Construction Road <br />Element #3 - Control Flow Rates <br />Element #4 - Install Sediment Controls <br />BMP C233 Silt Fence <br />Element #5 - Stabilize Soils <br />BMP C121 Mulching <br />BMP C123 Plastic covering <br />Element #6 - Protect Slopes <br />Element #7 — Protect Drain Inlets <br />BMP C220 Inlet Protection <br />Element #8 - Stabilize Channels and Outlets <br />BMP C201 Temporary Surface Channel <br />Element #9 —Control Pollutants <br />BMP C151 Concrete Handling <br />BMP C152 Saw cutting <br />BMP C153 Material Delivery, Storage, & Containment <br />BMP C154 Concrete washout Area <br />Element #10 - Control Dewatering <br />Vacuum truck <br />Baker Tank <br />Element #11 — Maintain BMP's <br />BMP C150 Materials On -Hand <br />BMP C160 CESCL <br />Element #12 — Manage the Project <br />BMP C150 Materials On -Hand <br />BMP C160 CESCL <br />BMP C162 Scheduling <br />Element #13 — Protect Low Impact Development <br />