Laserfiche WebLink
ATTACH IN A MANNER THAT <br />ASSURES FABRIC 15 FIRMLY <br />HELD BY THE BACKUP <br />SUPPORT IN A WAY THAT <br />REDUCES THEPOTENTIAL <br />FOR FABRIC TEARING <br />BACKUPSUPPORT <br />BACKFILLED & <br />COMPACTED <br />BURY GEOTEXTILE <br />IN TRENCH <br />DRAINAGE <br />GRATE FRF <br />SEDIMENT <br />AND DEB <br />F <br />DRAINAGE GRATE <br />BELOW INLET GRATE <br />DEVICE <br />SECTION VIEW <br />POST SEE WSDOT STANDARD <br />SPECIFICATIONS 8-01.3(9)A <br />FASTEN GEOTEXTILE TO <br />POST EVERY 6" IN O.C. <br />IW BYPASS <br />AETGRATE <br />WATER <br />RETRIEVAL SYSTEM <br />TYPICAL <br />OVERFLOW BYPASS <br />TYPICAL <br />4� <br />SELF-LOCKING TIE-NYLONE <br />6/6 (M GRADE) <br />TEXTILE c' I 6/6MI N TENSILE STRENGTH, <br />`` fill UV STABI LIED <br />e� <br />r _ <br />GEOTEXTI HE FOR SILT FENCE <br />n SEESTANDARDSPECIFICATION <br />SECTION 9-33.2(1), TABLE 6 - <br />ip <br />TYPICAL INSTALLATION DETAIL \, <br />INSTALL BACKUP SUPPORT FOR <br />THE GEOTEXTILE SEE STANDARD <br />SPECIFICATION SECTION 8.01.3(9)A <br />EP / i F <br />� O <br />P <br />19 E <br />a <br />0 <br />m <br />r <br />o�O�O PRE <br />e'POD <br />TYPICAL SILT FENCE <br />WITH BACKUP SUPPORT <br />ISOMETRIC <br />NOTES <br />1. CATCH BASIN INSERTS SHALL BE REMOVED AT THE <br />END OF THE PROJECT. <br />2. CATCH BASIN INSERTS ARE ONLY TO BE INSTALLED IN <br />DRAINAGE DEVICES PER THE MANUFACTURES'S <br />RECOMMENDATIONS. CATCH BASIN INLET INSERTS <br />SHALL BE INSTALLED IN CURB INLETS. <br />3. CATCH BASIN INSERTS SHALL BE INSTALLED PRIOR TO <br />CLEARING AND GRADING ACTIVITY, OR UPON <br />PLACEMENT OF A NEW CATCH BASIN. <br />4. SEDIMENT SHALL BE REMOVED FROM TH EUNIT <br />WHEN IT BECOMES ONE THIRD FULL OR IN <br />ACCORDANCE WITH THE MANUFACTURES' <br />INSTRUCTIONS. <br />5. SEDIMENT REMOVAL SHALL BE ACCOMPLISHED BY <br />REMOVING THE INLET INSERTS, EMPTYING, AND <br />RE -INSTALLING IT INTO THE CATCH BASIN. DO NOT <br />WASH SEDIMENT INTO STORM DRAINS WHILE <br />CLEANING. <br />6. SIE THE BELOW INLET GRATE DEVICE (BIGD) FOR THE <br />STORM WATER STRUCTURE IT WILL SERVICE. <br />]. THEBIGDSHALLHAVEA BUILT-IN HIGH -FLOW RELIEF <br />SYSTEM (OVERFLOW BYPASS). <br />8. THE RETRIEVAL SYSTEM MUST ALLOW REMOVAL OF <br />THE BIGD WITHOUT SPILLING THE COLLECTED <br />MATERIAL. <br />9. PERFORM MAINTENANCE IN ACCORDANCE WITH <br />STANDARD SPECIFICATION 8-01.3(15). <br />WSDOT STD PLAN 1-40,20-00 ACCEPTABLE SUBSTITUTE IF <br />MAINTENANCE MEETS NOTES 1-S <br />NOTES <br />1. INSTALL THE ENDS OF THE SILT FENCE TO POINT <br />SLIGHTLY UPSLOPE TO PREVENT SEDIMENT FROM <br />FLOWING AROUND THE ENDS OF THE FENCE. <br />2. PERFORM MAINTENANCE IN ACCORDANCE WITH <br />WSDOT STANDARD SPECIFICATIONS 8-01.3(9)A <br />AND 8-01.3(15). <br />3. SPLICES SHALL NEVER BE PLACED IN LOW SPOTS <br />OR SUMP LOCATIONS. IF SPLICES ARE LOCATED IN <br />LOW OR SUMP AREAS THE FENCE MAY NEED TO <br />BE REINSTALLED UNLESS OTHERWISE APPROVED. <br />4. INSTALL SILT FENCING PARALLEL TO MAPPED <br />CONTOUR LINES. <br />5. DURING EXCAVATION, MINIMIZE DISTURBING <br />THE GROUND AROUND TRENCH AS MUCH AS IS <br />FEASIBLE, AND SMOOTH SURFACE FOLLOWING <br />EXCAVATION TO AVOID CONCENTRATING FLOWS. <br />COMPACTION MUST BE ADEQUATE TO PREVENT <br />UNDERCUTTING FLOWS. <br />0F. BACKUP SUPPORT <br />FH'O� STEEL POST (TYPICAL) <br />F TYPICAL <br />FABRIC <br />i <br />i <br />/ V i <br />o PP�p <br />(GEOTEXTILE) / <br />e <br />(TYPICAL) <br />fill <br />SPLICED FENCE SECTIONS SHALL BE CLOSE ENOUGH TOGETHER <br />TO PREVENT SILT LADEN WATER FROM ESCAPING THROUGH THE <br />FENCE ATTHE OVERLAP. <br />SPLICE DETAIL <br />WSDOT STD PLAN 1-30.10-02 ACCEPTABLE SUBSTITUTE <br />EXCEPT STEEL POST REQUIRED <br />F <br />CITY OF EVERETT <br />�En <br />TT PUBLIC WORKS DEPARTMENT <br />NOTES <br />1. STABILIZED CONSTRUCTION ENTRANCE SHALL <br />MEETTHE REQUIREMENTS OF WSDOT STANDARD <br />SPECIFICATION SECTION 8-01.3(7). <br />INSTALL DRIVEWAY CULVERT <br />IF THERE IS A ROADSIDE DITCH <br />25, <br />PRESENT <br />25' <br />ROAD <br />EX15t\4G <br />30' MIN TYPICAL <br />_ -- _ <br />PERM EABLE BALLAST TYPICAL SEE <br />- <br />\ <br />STANDARD SPECIFICATION <br />SECTION 9-03.9(2) <br />1' MIN <br />LENGTH AS REQUIRED 1W MIN, EXCEPT <br />DEPTH <br />MAY BE REDUCEDTO 50' MIN FOR <br />SITES WITH LESS THAN ONE ACRE <br />TYPICAL <br />OF EXPOSED SOIL OR APPROVED BY INSPECTOR <br />�. <br />PLACE CONSTRUCTION GEOTEXTI LE FOR SOIL <br />E <br />STABILIZATION FROM THE EDGE OF THE EXISTING <br />FULL WIDTH OF <br />? <br />ROADWAY TO THE CONSTRUCTION ENTRANCE, <br />INGRESS/EGRESS AREA <br />ING RESE <br />OR AS DIRECTED BY THE ENGINEER <br />15'MIN <br />9 <br />s <br />ISOMETRIC VIEW <br />0 <br />CONSTRUCTION ENTRANCE <br />WSDOT STD PLAN 1-80.10-02 ACCEPTABLE SUBSTITUTE <br />1 <br />CITY OF EVERETT <br />B; <br />� PUBLIC WORKS DEPARTMENT <br />o a <br />04/03/201] <br />CONSTRUCTION ACCESS 201 <br />ts9 <br />STORM DRAINAGE NOTES <br />CITY OF EVERETT REQUIRED NOTES FOR STORM DRAINAGE PLANS: <br />1. NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED <br />OR PUT INTO USE UNTIL IT HAS BEEN INSPECTED, TESTED, AND <br />ACCEPTED BY THE CITY OF EVERETT. <br />2. ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT <br />STANDARDS AND STANDARD SPECIFICATIONS OF WSDOT/APWA. <br />3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN <br />OBTAINED FROM AVAILABLE RECORDS AND ARE SHOWN FOR <br />CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR <br />VERIFICATION OF LOCATIONS AND TO AVOID DAMAGE TO ANY <br />ADDITIONAL UTILITIES SHOWN. IF CONFLICTS WITH EXISTING UTILITIES <br />ARISE DURING CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE <br />PUBLIC WORKS INSPECTOR AND ANY CHANGES REQUIRED SHALL BE <br />APPROVED BY THE CITY ENGINEER PRIOR TO COMMENCEMENT OF <br />RELATED CONSTRUCTION ON THE PROJECT. <br />4. ALL STORM SYSTEMS WITHIN THE PUBLIC RIGHT-OF-WAY OR IN <br />EASEMENTS MUST BE STAKED BY SURVEY FOR LINE AND GRADE <br />PRIOR TO STARTING CONSTRUCTION. <br />5. ALL CATCH BASIN GRATES MUST BE STENCILED OR STAMPED "DUMP <br />NO WASTE, DRAINS TO STREAM, LAKE, RIVER, PUGET SOUND, OR <br />WETLAND.' CHOOSE APPROPRIATE FEATURE FOR THE PROJECT. <br />ADDITIONAL NOTES: <br />6. ALL PIPE SHALL BE PLACED ON STABLE EARTH, OR IF IN THE OPINION <br />OF THE INSPECTOR THE EXISTING FOUNDATION IS UNSATISFACTORY, <br />THEN IT SHALL BE EXCAVATED BELOW GRADE AND BACK -FILLED WITH <br />A GRAVEL MATERIAL TO SUPPORT THE PIPE. <br />7. THE BACK FILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE <br />PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6", MAXIMUM <br />DEPTH 8"-9", THOROUGHLY STAMPING EACH LAYER. THESE <br />COMPACTED LAYERS MUST EXTEND FOR ONE DIAMETER ON EACH <br />SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS TO <br />COMPLETE THIS FILL OVER PIPE SHALL BE THE SAME AS DESCRIBED. <br />(REFER TO WSDOT STANDARD SPECIFICATIONS 7-04.3(3) AND <br />2-03.2(14)C, METHOD B & C). <br />8. CATCH BASIN OFFSETS ARE MEASURED TO CENTER OF GRATE. <br />9. ALL CATCH BASINS SHALL BE TYPE A PER C.O.E. STANDARD DWG 402, <br />EXCEPT AS OTHERWISE NOTED. <br />10. ALL CATCH BASINS WITH A DEPTH OVER 5.0 FEET TO THE FLOW LINE <br />SHALL BE A TYPE II CB OR LARGER (MANHOLE). <br />11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING ALL <br />MANHOLE, INLET AND CATCH BASIN FRAMES AND GRATES TO GRADE <br />JUST PRIOR TO POURING CURBS AND PAVING. <br />12. CATCH BASIN FRAME AND GRATE SHALL BE OLYMPIC FOUNDRY MODEL <br />5435 LOCKING TYPE OR EQUAL. STANDARD GRATES SHALL BE USED <br />UNLESS SPECIFIED OTHERWISE. <br />13. UNLESS OTHERWISE NOTED, ALL STORM SEWER PIPE SHALL BE <br />CORRUGATED POLYETHYLENE PIPE: THE MATERIAL SUPPLIED UNDER <br />THIS SPECIFICATION SHALL BE HIGH -DENSITY CORRUGATED <br />POLYETHYLENE SMOOTH INTERIOR PIPE AND SHALL BE <br />MANUFACTURED IN CONFORMITY WITH THE LATEST AASHTO <br />SPECIFICATIONS OR M 294 TYPE S AND THE MATERIAL COMPOUND <br />SHALL CONFORM TO AASHTO M 294. COUPLERS SHALL COVER NOT <br />LESS THAN ONE FULL CORRUGATION ON EACH ANNULAR SECTION OF <br />PIPE AND PASS THE WSDOT STANDARD SPECIFICATION SECTION <br />7-04.3(4)D LOW PRESSURE AIR TEST FOR STORM SEWERS. <br />14. GALVANIZED STEEL PIPE SHALL HAVE TYPE 1 ASPHALT COATING. <br />ALUMINIZED PIPE DOES NOT REQUIRE COATING. <br />15. STORM WATER RETENTION/DETENTION FACILITIES, STORM DRAINAGE <br />PIPE AND CATCH BASINS SHALL BE FLUSHED AND CLEANED PRIOR TO <br />CITY OF EVERETT PUBLIC WORKS ACCEPTANCE. <br />CLEARING LIMITS <br />CLEARING LIMITS SHOWN ON PLAN REPRESENT MAXIMUM ALLOWABLE <br />EXTENT OF CLEARING ON THE PROPERTY. OWNER MAY ELECT TO CLEAR <br />LESS AREA WITHIN WSDOT RIGHT-OF-WAY. DRAINAGE FACILITY DESIGN IS <br />BASED ON ASSUMPTION OF MAXIMUM ALLOWED ONSITE CLEARING AND <br />HARDSCAPE. <br />MARKING OF CLEARING LIMITS AND PLACEMENT OF EROSION CONTROL <br />BMPS IN THE FIELD SHALL BE ADJUSTED FOR ACTUAL EXTENT OF <br />CLEARING AS DIRECTED BY OWNER. CLEARING LIMITS SHALL BE CLEARLY <br />MARKED IN FIELD PRIOR TO COMMENCEMENT OF SITE WORK. <br />UNDERGROUND UTILITY NOTE <br />EX. UNDERGROUND UTILITY LOCATIONS SHOWN HEREON ARE BASED UPON <br />SURFACE INDICATORS. NO UNDERGROUND LOCATE SERVICE WAS <br />UTILIZED FOR THEIR LOCATION. THE USE OF THIS MAP FOR THEIR EXACT <br />LOCATION IS NOT WARRANTED. PRIOR TO CONSTRUCTION USER SHOULD <br />CALL THE UTILITY LOCATE SERVICE AT 1-800-424-5555 TWO BUSINESS <br />DAYS BEFORE CONSTRUCTION. <br />WATER QUALITY STANDARD <br />STORMWATER RELEASED FROM THIS CONSTRUCTION SITE TO <br />OFF -SITE DRAINAGE CHANNELS SHALL NOT BE PERMITTED TO <br />TRANSPORT SEDIMENT LOADINGS EXCEEDING 5 NI ABOVE <br />BACKGROUND LEVELS. <br />EROSION CONTROL BMP'S <br />HIGH VISIBILITY FENCING (BMP C103) <br />USE IN COMBINATION WITH BMP C233, SILT FENCE AS INDICATED ON <br />THE PLANS. <br />CONSTRUCTION ROAD/PARKING AREA STABILIZATION (BMP C107) <br />ONCE DEMOLITION IS COMPLETE, THE BUILDING FOUNDATIONS AND <br />SLAB AREAS WILL BE STABILIZED WITH GRAVEL AND CONCRETE. <br />TEMPORARY & PERMANENT SEEDING (BMP C120) <br />PERMANENT SEEDING SHALL BE USED TO STABILIZE EXPOSED SOILS <br />AND SHALL BE PERFORMED UNDER THE DIRECTION OF THE <br />LANDSCAPE PLANS AND SPECIFICATIONS. <br />MULCHING (BMP C121) <br />STABILIZE EXPOSED SURFACES WITH 2"- 4" MULCH WHEN SURFACES <br />ARE TO BE UNWORKED FOR THE SEASONAL TIME FRAMES LISTED IN <br />THE TESC NOTES AND SWPPP NARRATIVE. <br />PLASTIC COVERING (BMP C123) <br />USE PLASTIC SHEATHING TO PROTECT STOCKPILES. STABILIZE WITH <br />SAND BAGS CONNECTED WITH ROPE. <br />TOPSOILING/COMPOSTING (BMP C125) <br />TOPSOIL EXPOSED SOILS AND PROPOSED PLANTERS. <br />DUST CONTROL (BMP C140) <br />CONTRACTOR SHALL IMPLEMENT MEASURES TO PREVENT WIND <br />TRANSPORT OF DUST FROM SOIL SURFACES. SUCH MEASURES CAN <br />INCLUDE BUT ARE NOT LIMITED TO THE FOLLOWING: MULCHING AREAS <br />NOT USED FOR VEHICLE ACCESS, SPRINKLING EXPOSED SURFACES <br />WITH WATER, SURFACE HAUL ROADS WITH GRAVEL. <br />STORM INLET PROTECTION (BMP C220) <br />PLACE INSERTS PER PLAN DETAIL IN EXISTING CATCH BASINS AS <br />INDICATED ON THE PLAN. <br />AS NEW CATCH BASINS ARE INSTALLED, THESE SHALL ALSO BE <br />PROTECTED UNTIL THE DRAINAGE AREA IS STABILIZED. <br />SILT FENCE (BMP C233) <br />INSTALL SILT FENCE IN LOCATIONS INDICATED ON THE PLAN. <br />POLLUTANTS OTHER THAN SEDIMENT <br />ALL POLLUTANTS, INCLUDING WASTE MATERIALS AND DEMOLITION DEBRIS, <br />THAT OCCUR ONSITE SHALL BE HANDLED AND DISPOSED OF IN A MANNER <br />THAT DOES NOT CAUSE CONTAMINATION OF STORMWATER. GOOD <br />HOUSEKEEPING AND PREVENTATIVE MEASURES WILL BE TAKEN TO <br />ENSURE THAT THE SITE WILL BE KEPT CLEAN, WELL ORGANIZED, AND FREE <br />OF DEBRIS. IF REQUIRED, BMPS TO BE IMPLEMENTED TO CONTROL <br />SPECIFIC SOURCES OF POLLUTANTS ARE DISCUSSED BELOW. <br />VEHICLES, CONSTRUCTION EQUIPMENT, AND/OR PETROLEUM PRODUCT <br />STORAGE/DISPENSING: <br />• ALL VEHICLES, EQUIPMENT, AND PETROLEUM PRODUCT <br />STORAGE/DISPENSING AREAS WILL BE INSPECTED REGULARLY TO <br />DETECT ANY LEAKS OR SPILLS, AND TO IDENTIFY MAINTENANCE <br />NEEDS TO PREVENT LEAKS OR SPILLS. <br />• ON -SITE FUELING TANKS AND PETROLEUM PRODUCT STORAGE <br />CONTAINERS SHALL INCLUDE SECONDARY CONTAINMENT. <br />• SPILL PREVENTION MEASURES, SUCH AS DRIP PANS, WILL BE <br />USED WHEN CONDUCTING MAINTENANCE AND REPAIR OF <br />VEHICLES OR EQUIPMENT. <br />• IN ORDER TO PERFORM EMERGENCY REPAIRS ON SITE, <br />TEMPORARY PLASTIC WILL BE PLACED BENEATH AND, IF RAINING, <br />OVER THE VEHICLE. <br />• CONTAMINATED SURFACES SHALL BE CLEANED IMMEDIATELY <br />FOLLOWING ANY DISCHARGE OR SPILL INCIDENT. <br />CHEMICAL STORAGE: <br />• ANY CHEMICALS STORED IN THE CONSTRUCTION AREAS WILL <br />CONFORM TO THE APPROPRIATE SOURCE CONTROL BMPS LISTED <br />IN VOLUME IV OF THE ECOLOGY STORMWATER MANUAL. IN <br />WESTERN WA, ALL CHEMICALS SHALL HAVE COVER, <br />CONTAINMENT, AND PROTECTION PROVIDED ON SITE, PER BMP <br />C153 FOR MATERIAL DELIVERY, STORAGE AND CONTAINMENT IN <br />SWMMWW 2005 <br />• APPLICATION OF AGRICULTURAL CHEMICALS, INCLUDING <br />FERTILIZERS AND PESTICIDES, SHALL BE CONDUCTED IN A <br />MANNER AND AT APPLICATION RATES THAT WILL NOT RESULT IN <br />LOSS OF CHEMICAL TO STORMWATER RUNOFF. MANUFACTURERS' <br />RECOMMENDATIONS FOR APPLICATION PROCEDURES AND RATES <br />SHALL BE FOLLOWED. <br />DEMOLITION: <br />• DUST RELEASED FROM DEMOLISHED SIDEWALKS SHALL BE <br />CONTROLLED USING DUST CONTROL MEASURES (BMP C140). <br />• STORM DRAIN INLETS VULNERABLE TO STORMWATER DISCHARGE <br />CARRYING DUST, SOIL, OR DEBRIS WILL BE PROTECTED USING <br />STORM DRAIN INLET PROTECTION (BMP C220 AS INDICATED ON <br />THE PLAN). <br />• PROCESS WATER AND SLURRY RESULTING FROM SAWCUTTING <br />AND SURFACING OPERATIONS WILL BE PREVENTED FROM <br />ENTERING THE WATERS OF THE STATE BY IMPLEMENTING <br />SAWCUTTING AND SURFACING POLLUTION PREVENTION <br />MEASURES (BMP C152). <br />1. SLURRY AND CUTTING SHALL BE VACUUMED DURING <br />CUTTING AND SURFACING OPERATIONS. <br />2. SLURRY AND CUTTINGS SHALL NOT DRAIN TO ANY NATURAL <br />OR CONSTRUCTED DRAINAGE CONVEYANCE. <br />3. COLLECTED SLURRY AND CUTTINGS SHALL BE DISPOSED OF <br />IN A MANNER THAT DOES NOT VIOLATE GROUNDWATER OR <br />SURFACE WATER QUALITY STANDARDS. <br />CONCRETE AND GROUT: <br />• PROCESS WATER AND SLURRY RESULTING FROM CONCRETE <br />WORK WILL BE PREVENTED FROM ENTERING THE WATERS OF THE <br />STATE BY IMPLEMENTING CONCRETE HANDLING MEASURES (BMP <br />C151). <br />1. CONCRETE TRUCK CHUTES, PUMPS, AND INTERNALS SHALL <br />BE WASHED OUT ONLY INTO FORMED AREAS AWAITING <br />INSTALLATION OF CONCRETE OR ASPHALT. <br />2. UNUSED CONCRETE REMAINING IN THE TRUCK AND PUMP <br />SHALL BE RETURNED TO THE ORIGINATING BATCH PLANT <br />FOR RECYCLING. <br />3. HAND TOOLS INCLUDING, BUT NOT LIMITED TO, SCREEDS, <br />SHOVELS, RAKES, FLOATS, AND TROWELS SHALL BE <br />WASHED OFF ONLY INTO FORMED AREAS AWAITING <br />INSTALLATION OF CONCRETE OR ASPHALT. <br />WHEN NO FORMED AREAS ARE AVAILABLE, WASHWATER AND <br />LEFTOVER PRODUCT SHALL BE CONTAINED IN A LINED <br />CONTAINER. CONTAINED CONCRETE SHALL BE DISPOSED OF IN A <br />MANNER THAT DOES NOT VIOLATE GROUNDWATER OR SURFACE <br />WATER QUALITY STANDARDS. <br />SANITARY WASTEWATER: <br />• PORTABLE SANITATION FACILITIES WILL BE FIRMLY SECURED, <br />REGULARLY MAINTAINED, AND EMPTIED WHEN NECESSARY. <br />• SOLID WASTE WILL BE STORED IN SECURE, CLEARLY MARKED <br />CONTAINERS. <br />OTHER: <br />• OTHER BMPS WILL BE ADMINISTERED AS NECESSARY TO <br />ADDRESS ANY ADDITIONAL POLLUTANT SOURCES ON SITE. <br />MAINTENANCE OF BMP'S <br />ALL TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL <br />PRACTICES SHALL BE MAINTAINED AND REPAIRED AS NEEDED TO <br />ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. <br />FACILITIES SHALL BE INSPECTED AT A MINIMUM ON A WEEKLY BASIS <br />AND IMMEDIATELY AFTER ANY RUNOFF PRODUCING RAIN EVENT. ALL <br />MAINTENANCE AND REPAIR SHALL BE CONDUCTED IN ACCORDANCE <br />WITH MARYSVILE STANDARDS. AT A MINIMUM REPAIRS TO BMP'S <br />SHALL TAKE PRECEDENT OVER OTHER SITE WORK AND COMPLETED <br />PRIOR TO CLOSING THE SITE OF THE NIGHT. TRAPPED SEDIMENT MUST <br />BE REMOVED OR STABILIZED ON SITE. DISTURBED SOIL AREAS <br />RESULTING FROM REMOVAL SHOULD BE PERMANENTLY STABILIZED. <br />HIGH VISIBILITY FENCING (BMP C103) <br />INSPECT FENCING AND REPAIR DAMAGED SECTIONS. <br />CONSTRUCTION ROAD STABILIZATION (BMP C107) <br />INSPECT STABILIZED AREAS REGULARLY, ESPECIALLY AFTER LARGE <br />STORM EVENTS. ADD GRAVEL IF NECESSARY AND RESTABILIZE ANY <br />AREAS FOUND TO BE ERODING. <br />BMP C120, TEMPORARY SEEDING OF STRIPPED AREAS <br />SEEDING SHOULD BE SUPPLIED WITH ADEQUATE MOISTURE. SUPPLY <br />WATER AS NEEDED, ESPECIALLY IN ABNORMALLY HOT OR DRY <br />WEATHER OR ON ADVERSE SITES. WATER APPLICATION RATES <br />SHOULD BE CONTROLLED TO PREVENT RUNOFF. <br />RE -SEEDING -AREAS WHICH FAIL TO ESTABLISH VEGETATIVE COVER <br />ADEQUATE TO PREVENT EROSION SHALL BE RE -SEEDED AS SOON AS <br />SUCH AREAS ARE IDENTIFIED. <br />MULCHING (BMP C121) <br />MULCHED AREAS SHOULD BE CHECKED PERIODICALLY, ESPECIALLY <br />FOLLOWING SEVERE STORMS. DAMAGED AREAS OF MULCH OR <br />TIE -DOWN MATERIAL SHALL BE IMMEDIATELY REPAIRED. <br />PLASTIC COVERING (BMP C123) <br />CHECK REGULARLY FOR RIPS AND PLACES WHERE THE PLASTIC MAY <br />BE DISLODGED. CONTACT <br />BETWEEN THE PLASTIC AND THE GROUND SHOULD ALWAYS BE <br />MAINTAINED. ANY AIR BUBBLES FOUND SHOULD BE REMOVED <br />IMMEDIATELY OR THE PLASTIC MAY RIP DURING THE NEXT WINDY <br />PERIOD. RE -ANCHOR OR REPLACE THE PLASTIC AS NECESSARY. <br />TOPSOILING (BMP C125) <br />INSPECT FOR DAMAGE FROM RAINFALL AND SHEET FLOW. REGRADE <br />AS NECESSARY. <br />DUST CONTROL (BMP C140) <br />RESPRAY AREA AS NECESSARY TO PREVENT WIND EROSION. <br />STORM DRAIN INLET PROTECTION (BMP C220) <br />FOR SYSTEMS USING FILTER FABRIC: INSPECTIONS SHOULD BE MADE <br />ON A REGULAR BASIS, ESPECIALLY AFTER LARGE STORM EVENTS. IF <br />THE FILTER BAG BECOMES CLOGGED, IT SHOULD BE CLEANED OR <br />REPLACED. <br />SILT FENCE (BMP C233) <br />INSPECT IMMEDIATELY AFTER EACH RAINFALL, AND AT LEAST DAILY <br />DURING PROLONGED RAINFALL. REPAIR AS NECESSARY. <br />SEDIMENT MUST BE REMOVED WHEN IT REACHES APPROXIMATELY <br />ONE THIRD THE HEIGHT OF THE FENCE, ESPECIALLY IF HEAVY RAINS <br />ARE EXPECTED. <br />CITY OF EVERETT GENERAL NOTES <br />1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) <br />PLAN DOES NOT CONSTITUTE AN APPROVAL OF <br />PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF <br />ROADS, PIPES, RESTRICTORS, CHANNELS, <br />RETENTION FACILITIES, UTILITIES). <br />2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE <br />CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND <br />UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE <br />APPLICANT/CONTRACTOR UNTIL ALL <br />CONSTRUCTION IS COMPLETED AND APPROVED AND <br />VEGETATION/LANDSCAPING IS ESTABLISHED. <br />3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS <br />PLAN SHALL BE CLEARLY FLAGGED IN THE FIELD PRIOR <br />TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO <br />DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS <br />SHALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE <br />APPLICANT/CONTRACTOR FOR THE DURATION <br />OF CONSTRUCTION. <br />4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE <br />CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND <br />GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE THAT <br />SEDIMENT AND SEDIMENT LADEN WATER DO <br />NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE <br />APPLICABLE WATER QUALITY STANDARDS. <br />5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM <br />REQUIREMENTS FOR ANTICIPATED SITE <br />CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC <br />FACILITIES SHALL BE UPGRADED AS NEEDED FOR <br />UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND <br />SEDIMENT -LADEN WATER DO NOT LEAVE THE <br />SITE. <br />6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND <br />MAINTAINED BY THE APPLICANT/CONTRACTOR TO <br />ENSURE THEIR CONTINUED FUNCTIONING, ESPECIALLY AFTER STORM <br />EVENTS. <br />7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED <br />AND MAINTAINED A MINIMUM OF ONCE A <br />MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM EVENT <br />8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE <br />ALLOWED TO ACCUMULATE WITHIN A TRAPPED CATCH <br />basin. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED <br />PRIOR TO PAVING. THE CLEANING <br />OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE <br />DOWNSTREAM SYSTEM. <br />9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED <br />AT THE BEGINNING OF CONSTRUCTION AND <br />MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL <br />MEASURES MAY BE REQUIRED TO ENSURE THAT ALL <br />PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. <br />10. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING <br />TO REMOVE DEBRIS AND SEDIMENT TRACKED OFF <br />THE SITE. <br />11. APPROPRIATE MEASURES SHALL BETAKEN TO STOP SEDIMENT <br />FROM ENTERING SURFACE WATER BODIES IF THE <br />PROPOSED BMPS FAIL. <br />12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED <br />AND/OR UNSTABILIZED FOR NO MORE THAN 2 DAYS <br />FROM OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN 7 <br />DAYS FROM MAY 1 THROUGH SEPTEMBER 30. <br />FIELD MARKINGS <br />BEFORE ANY CLEARING OR GRADING OCCURS, CONTRACTOR OR <br />SURVEYOR SHALL INSTALL TEMPORARY FIELD MARKINGS AS FOLLOWS: <br />1. MARK CLEARING LIMITS AS SHOWN ON PLAN OR AS DIRECTED BY <br />OWNER (LIMITS ON PLAN ARE MAXIMUM ALLOWABLE) WITH <br />CONTINUOUS RUN OF ORANGE SURVEYOR'S TAPE 4-6 FEET ABOVE <br />GROUND. CONTRACTOR MAY SUBSTITUTE CONSTRUCTION OR SILT <br />FENCING FOR SURVEYOR'S TAPE. <br />2. CONTRACTOR SHALL REQUEST INSPECTION OF FIELD MARKINGS BY <br />C.O.E. STAFF PRIOR TO COMMENCING CLEARING OR GRADING. <br />SOIL STOCKPILES <br />TEMPORARY STOCKPILE LOCATIONS MAY BE ADJUSTED BY CONTRACTOR <br />IN FIELD. TOPSOIL STRIPPING STOCKPILES SHALL BE WINDROWED <br />TEMPORARILY ALONG LOT FRONTAGE FOR SPREADING WHEN LOTS ARE <br />CLEARED. CARE SHOULD BE TAKEN TO AVOID UNINTENTIONAL DRAINAGE <br />IMPOUNDMENT OR DIVERSION. TOPSOIL STRIPPINGS MAY BE <br />INCORPORATED INTO EROSION CONTROL DIVERSION BERMS. <br />STOCKPILES SHALL NOT BE PLACED WITHIN NGPAS, SCREENING BUFFERS, <br />EXISTING DRAINAGE OR UTILITY EASEMENTS OR RIGHTS -OF -WAY. <br />STOCKPILE MANAGEMENT SHALL COMPLY WITH T.E.S.C. GENERAL NOTES <br />ON SHEET C2.1, INCLUDING STABILIZATION WITHIN 24 HOURS. <br />CERTIFIED EROSION & <br />SEDIMENT CONTROL LEAD <br />WASHINGTON STATE D.O.E. REQUIRES THAT A CERTIFIED EROSION AND <br />SEDIMENT CONTROL LEAD (CESCL) BE RETAINED TO MONITOR T.E.S.0 <br />COMPLIANCE. THE CESCL MUST BE IDENTIFIED ON THE STORMWATER <br />GENERAL PERMIT APPLICATION AND SHALL ATTEND THE <br />PRE -CONSTRUCTION MEETING WITH CITY STAFF. <br />SITE GRADING NOTES <br />1. ALL GRADING SHALL COMPLY WITH CHAPTER A33 OF THE <br />INTERNATIONAL BUILDING CODE (CURRENT EDITION). <br />2. PUBLIC STREETS ARE TO BE KEPT CLEAR OF DIRT AND DEBRIS AT ALL <br />TIMES DURING CONSTRUCTION. DUST SUPPRESSION AND STREET <br />CLEANING MUST OCCUR AS DIRECTED BY THE PUBLIC WORKS <br />INSPECTOR. <br />3. THE SITE SOILS ARE GENERALLY CONSIDERED MOISTURE SENSITIVE <br />AND AS SUCH ARE SUSCEPTIBLE TO DISTURBANCE BY CONSTRUCTION <br />EQUIPMENT, PARTICULARLY DURING PERIODS OF WET WEATHER. THE <br />GRADING CONTRACTOR SHALL TAKE ALL PRECAUTIONS TO LIMIT <br />SURFACE DISTURBANCE AND PROTECT THE SITE GRADING AREA FROM <br />EXCESSIVE RUNOFF EROSION. <br />4. AREAS TO RECEIVE FILL SHALL BE CLEARED OF ALL VEGETATION AND <br />DELETERIOUS MATTER. <br />5. AREAS TO RECEIVE FILL SHALL BE PROOFROLLED. ALL LOOSE AND <br />SOFT AREAS SHALL BE REMOVED AND REPLACED WITH <br />STRUCTURAL FILL. <br />6. ALL FILL MATERIALS USED SHALL BE FREE OF VEGETATION AND <br />DELETERIOUS MATTER AND SHALL NOT CONTAIN ROCKS GREATER <br />THAN SIX INCHES IN DIAMETER. <br />7. STRUCTURAL FILLS SHALL BE PLACED IN EIGHT TO 10 INCH THICK <br />LOOSE HORIZONTAL LIFTS AND SPREAD UNIFORMLY. <br />8. AFTER EACH LIFT HAS BEEN SPREAD EVENLY, IT SHALL BE <br />COMPACTED TO A MINIMUM OF 95%OF MAXIMUM DENSITY <br />DETERMINED IN ACCORDANCE WITH ASTM D1557 (MODIFIED <br />PROCTOR). <br />9. THE SURFACE OF ALL SLOPES SHALL BE COMPACTED. THIS MAY BE <br />ACCOMPLISHED BY OVER -BUILDING THE SLOPES, THEN CUTTING BACK <br />TO FINAL GRADES, OR BY RUNNING THE COMPACTOR OVER THE <br />SLOPE AS EACH FILL LIFT IS BEING PLACED. ALL SLOPES SHALL BE <br />COMPACTED BY THE END OF EACH WORK DAY. <br />10. FIELD DENSITY TESTS (IF REQUIRED) WILL BE MADE BY A QUALIFIED <br />SOILS ENGINEERING FIRM. DENSITY TESTS SHALL BE TAKEN AT OR <br />JUST BELOW THE SURFACE AT THE FREQUENCY AND LOCATIONS <br />DETERMINED BY THE SOILS ENGINEERING FIRM. WHEN THE TESTS <br />INDICATE THAT THE DENSITY OF ANY LAYER OF FILL OR PORTION <br />THEREOF IS BELOW THE SPECIFIED DENSITY, THE PARTICULAR <br />SECTION SHALL BE REWORKED UNTIL THE REQUIRED DENSITY HAS <br />BEEN OBTAINED. ALL TEST RESULTS SHALL BE TRANSMITTED TO THE <br />CITY OF EVERETT BUILDING DEPARTMENT. <br />11. A GRADING PERMIT AND APPROVAL OF THE TEMPORARY EROSION AND <br />SEDIMENTATION CONTROL PLAN SHALL HAVE BEEN OBTAINED FROM <br />THE CITY OF EVERETT FOR ANY ON -SITE GRADING. <br />12. ALL CUT AND FILL SLOPES SHALL BE A MAXIMUM OF 2.:1. <br />13. STOCKPILES ARE TO BE LOCATED IN SAFE AREAS AND ADEQUATELY <br />PROTECTED TO PREVENT EROSION. HYDROSEED PREFERRED. <br />14. NO GRADING SHALL OCCUR WITHIN 2 FEET OF PROPERTY BOUNDARY <br />WITHOUT WRITTEN APPROVAL OF ADJACENT OWNER. <br />T.E.S.C. GENERAL NOTES <br />THE NOTES AND DETAILS PROVIDED ON THIS SHEET ILLUSTRATE SOME OF <br />THE MOST COMMON TEMPORARY EROSION/SILTATION CONTROL BEST <br />MANAGEMENT PRACTICES (BMPs). ALTHOUGH SOME MEASURES SHOWN HERE <br />MAY NOT BE SPECIFIED IN THE T.E.S.C. PLAN FOR THIS PROJECT, THE DETAILS <br />ARE PROVIDED FOR FUTURE REFERENCE SHOULD SITE CONDITIONS REQUIRE <br />ADDITIONAL MEASURES BEYOND THOSE SPECIFIED. APPROPRIATE <br />RESPONSES TO UNANTICIPATED SITE CONDITIONS MAY INCLUDE, BUT ARE <br />NOTLIMI$4RAW.NTUEOFOLLOWING ADDITIONAL BMPS: <br />• TEMPORARY DITCHES, SWALES, DIKES OR BASINS <br />• JUTE OR SYNTHETIC MATTING, EITHER GENERIC OR PROPRIETARY <br />• SLOPE SCARIFICATION OR TERRACING <br />• ANCHORED PLASTIC SHEETING <br />• MULCH, BRUSH OR GRAVEL FILTER BERMS <br />• DUST CONTROL <br />• TIRE WASH STATIONS <br />• SODDING <br />• ROCK CHECK DAMS <br />SUCH MEASURES SHALL BE SELECTED BY THE CONTRACTOR IN <br />CONSULTATION WITH THE CITY INSPECTOR AND THE CESCL, AND SHALL BE <br />INSTALLED PER MANUFACTURER'S SPECIFICATIONS, ENGINEER'S DESIGN OR <br />STANDARD CONSTRUCTION INDUSTRY PRACTICE AS THE SITUATION DICTATES. <br />1. THE TEMPORARY EROSION/SEDIMENTATION CONTROL FACILITIES SHALL BE <br />CONSTRUCTED PRIOR TO ANY GRADING OR LAND CLEARING IN <br />ACCORDANCE WITH THE APPROVED TEMPORARY EROSION/SEDIMENTATION <br />CONTROL PLAN. THESE FACILITIES MUST BE SATISFACTORILY MAINTAINED <br />UNTIL CONSTRUCTION AND LANDSCAPING IS COMPLETED AND THE <br />POTENTIAL FOR ON -SITE EROSION HAS PASSED. <br />2. NONCOMPLIANCE WITH THE EROSION CONTROL REQUIREMENTS, WATER <br />QUALITY REQUIREMENTS, AND/OR CLEARING LIMITS MAY RESULT IN <br />REVOCATION OF PROJECT PERMITS OR PLAN APPROVAL, FINES AND BOND <br />FORECLOSURES. <br />3. THE T.E.S.C. FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM <br />REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. THE CONTRACTOR <br />SHALL BE RESPONSIBLE FOR PROVIDING IMPROVED OR MODIFIED <br />FACILITIES AS NECESSARY TO MAINTAIN RUNOFF WATER QUALITY DURING <br />AND AFTER SIGNIFICANT STORM EVENTS AND TO ADDRESS THE ACTUAL <br />SITE AND SOILS CONDITIONS ENCOUNTERED. <br />4. CONTRACTOR SHALL MAINTAIN ON SITE AT ALL TIMES SUFFICIENT <br />QUANTITIES OF EROSION CONTROL MATERIALS TO COVER ALL EXPOSED <br />SOIL IN THE EVENT OF UNANTICIPATED WEATHER CONDITIONS. <br />CONTRACTOR MAY CONSIDER PHASING GRADING ON LARGE SITES TO <br />MINIMIZE BARE SOIL EXPOSURE. <br />5. THE IMPLEMENTATION OF THESE TESC PLANS AND THE CONSTRUCTION, <br />MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE T.E.S.C. <br />FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL <br />ALL CONSTRUCTION IS APPROVED. BARE AND/OR DISTURBED SOILS SHALL <br />REMAIN UNCOVERED FOR NO MORE THAN 2 DAYS FROM OCTOBER 1 <br />THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY 1 <br />THROUGH SEPTEMBER 30. STABILIZE WITH APPROVED T.E.S.C. METHODS <br />E.G. SEEDING MULCHING NETTING EROSION BLANKETS PLASTIC <br />COVERING ETC.. SOIL STOCKPILES SHALL BE STABILIZED WITHIN 24 <br />HOURS. <br />6. WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, <br />IT SHALL BE APPLIED AT A MINIMUM THICKNESS OF TWO INCHES. <br />7. ANY AREA NEEDING T.E.S.C. MEASURES, NOT REQUIRING IMMEDIATE <br />ATTENTION, SHALL BE ADDRESSED WITHIN FIFTEEN (15) DAYS. <br />8. THE T.E.S.C. FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND <br />MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS <br />FOLLOWING A STORM EVENT. <br />9. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE <br />REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED <br />OR AFTER THE TEMPORARY BMPs ARE NO LONGER NEEDED. TRAPPED <br />SEDIMENT SHALL BE REMOVED OR STABILIZED ON SITE. DISTURBED SOIL <br />AREAS RESULTING FROM REMOVAL SHALL BE PERMANENTLY STABILIZED. <br />10. CONTRACTOR SHALL USE INDUSTRY BEST MANAGEMENT PRACTICES TO <br />PREVENT PETROLEUM PRODUCTS, FERTILIZERS, CONCRETE BY-PRODUCTS <br />AND OTHER POLLUTANTS FROM ENTERING OFF -SITE DRAINAGE COURSES. <br />SLASH PILES AND OTHER SOLID WASTE SHALL BE DISPOSED OF IN <br />ACCORDANCE WITH ALL APPLICABLE LOCAL REGULATIONS. <br />11. WASTEWATER FROM PROJECT ACTIVITIES AND DE -WATERING SHALL BE <br />ROUTED TO AN UPLAND AREA FOR REMOVAL OF FINE SEDIMENTS AND <br />OTHER CONTAMINANTS. ONLY CLEAN, UNPOLLUTED WATER SHALL LEAVE <br />THE SITE. <br />12. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY <br />SWEEPING. WASHING OF THESE STREETS WILL NOT BE ALLOWED WITHOUT <br />PRIOR CITY OF EVERETT APPROVAL. <br />CONTRACTOR RESPONSIBILITY FOR <br />EROSION SILTATION CONTROL <br />IT IS THE INTENT OF THIS TEMPORARY EROSION AND SILTATION CONTROL PLAN <br />THAT STORM WATER RUNOFF BE CONTROLLED AT ALL TIMES TO PREVENT SOIL <br />EROSION AND TO MAINTAIN WATER QUALITY. ANY AND ALL MEASURES <br />NECESSARY TO DO SO SHALL BE EMPLOYED BY THE CONTRACTOR. <br />1. REGARDLESS OF SITE, WEATHER, SOIL OR OTHER CONDITIONS, THE <br />CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ENSURING THAT EROSION <br />DOES NOT OCCUR ON THE SITE AND THAT POLLUTED OR SILT -LADEN RUNOFF <br />DOES NOT LEAVE THE SITE OR ENTER INTO ANY CREEK, STREAM, WETLAND <br />OR WATER BODY ON OR OFF THE SITE. <br />2. BEYOND THE MINIMUM REQUIREMENTS SHOWN ON THIS PLAN, THE <br />CONTRACTOR SHALL BE RESPONSIBLE FOR SELECTING AND IMPLEMENTING <br />APPROPRIATE METHODS, "BEST MANAGEMENT PRACTICES" (BMPs), FOR STORI <br />WATER TREATMENT AND CONTROL THAT MEET THE REQUIREMENTS OF BOTH <br />THE WASHINGTON STATE DEPARTMENT OF ECOLOGY AND CITY OF EVERETT. <br />3. THE CONTRACTOR SHALL REPORT ALL WATER QUALITY CONCERNS AND <br />ACTIVITIES TO THE CERTIFIED EROSION AND SEDIMENT CONTROL LEAD <br />(C.E.S.C.L.) AND TO CITY OF EVERETT. IN THE EVENT THAT THE INSTALLED <br />WATER QUALITY CONTROL MEASURES ARE INEFFECTIVE AT CONTROLLING <br />EROSION AND SILTATION, THE CONTRACTOR SHALL IMMEDIATELY REPORT TO <br />AND CONSULT WITH THE C.E.S. C.L. TO FIND AN APPROPRIATE REMEDY. ALL <br />CONSTRUCTION ACTIVITIES, WITH THE EXCEPTION OF EROSION AND SILTATION <br />CONTROL MEASURES, SHALL CEASE UNTIL SUCH TIME AS THE WATER QUALITY <br />IS BROUGHT INTO COMPLIANCE WITH D.O.E. AND CITY OF EVERETT <br />REQUIREMENTS. <br />4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MONITORING WEATHER <br />FORECASTS AND ANTICIPATING STORM ACTIVITY AND SHALL SCHEDULE ALL <br />PROJECT ACTIVITIES IN ANTICIPATION OF THE WEATHER. <br />5. ALL SUPPLIES AND MATERIALS NECESSARY FOR IMPLEMENTING BMPs SHALL BI <br />STORED ON SITE AND SHALL BE IMMEDIATELY AVAILABLE FOR USE. SUCH <br />SUPPLIES AND MATERIALS SHALL INCLUDE, BUT NOT BE LIMITED TO, STRAW <br />BALES OR OTHER MULCHING MATERIAL, SILT FENCING AND STAKES, FILTER <br />FABRIC, ETC. <br />6. DURING AND AFTER RUNOFF PRODUCING STORM EVENTS, THE CONTRACTOR <br />SHALL MONITOR ALL EROSION CONTROL MEASURES AND SHALL PRIORITIZE <br />IMPLEMENTATION AND MAINTENANCE OF EROSION AND SILTATION CONTROL <br />MEASURES ABOVE ALL OTHERS. <br />11111111111111111111. 15/1 T 11 <br />Ankrom • <br />38 NORTHWEST DAVIS, SUITE 300 <br />PORTLAND, OR 97209 <br />503.245.7100 <br />1505 5TH AVE, SUITE 300 <br />SEATTLE, WA 98101 <br />206.576.1600 <br />1014 HOWARD STREET <br />SAN FRANCISCO, CA 94103 <br />415.252.7063 <br />©ANKROM MOISAN ARCHITECTS, INC. <br />C "PASS <br />Health <br />Lc,�T US <br />development partners <br />O <br />Do <br />Ol <br />W Q <br />= F <br />a W <br />Y LU <br />U W <br />O W x <br />J <br />� � W <br />2 <br />j <br />Q ti <br />7 <br />o <br />0 <br />Q m In <br />O N 2 <br />CC M O <br />co L7 U <br />REVISION <br />DATE <br />REASON FOR ISSUE <br />1 <br />12/15/21 <br />50% CD'S <br />p W H9 <br />F� r4as�2 <br />O� <br />o <br />3115 <br />f8T <br />ONAL <br />CITY NOTES & <br />SWPPP DETAILS <br />DEMOLITION <br />PERMIT SET <br />?; T- <br />PROJECT NUMBER <br />02.02.2022 <br />1 21-056 <br />SHEET NUMBER <br />C1.02 <br />