<br />SECTION VIEW
<br />POST SEE WSDOT STANDARD
<br />SPECIFICATIONS 8-01.3(9)A
<br />FASTEN GEOTEXTILE TO
<br />POST EVERY 6" IN O.C.
<br />IW BYPASS
<br />AETGRATE
<br />WATER
<br />RETRIEVAL SYSTEM
<br />TYPICAL
<br />OVERFLOW BYPASS
<br />TYPICAL
<br />4�
<br />SELF-LOCKING TIE-NYLONE
<br />6/6 (M GRADE)
<br />TEXTILE c' I 6/6MI N TENSILE STRENGTH,
<br />`` fill UV STABI LIED
<br />e�
<br />r _
<br />GEOTEXTI HE FOR SILT FENCE
<br />n SEESTANDARDSPECIFICATION
<br />SECTION 9-33.2(1), TABLE 6 -
<br />ip
<br />TYPICAL INSTALLATION DETAIL \,
<br />INSTALL BACKUP SUPPORT FOR
<br />THE GEOTEXTILE SEE STANDARD
<br />SPECIFICATION SECTION 8.01.3(9)A
<br />EP / i F
<br />� O
<br />P
<br />19 E
<br />a
<br />0
<br />m
<br />r
<br />o�O�O PRE
<br />e'POD
<br />TYPICAL SILT FENCE
<br />WITH BACKUP SUPPORT
<br />ISOMETRIC
<br />NOTES
<br />1. CATCH BASIN INSERTS SHALL BE REMOVED AT THE
<br />END OF THE PROJECT.
<br />2. CATCH BASIN INSERTS ARE ONLY TO BE INSTALLED IN
<br />DRAINAGE DEVICES PER THE MANUFACTURES'S
<br />RECOMMENDATIONS. CATCH BASIN INLET INSERTS
<br />SHALL BE INSTALLED IN CURB INLETS.
<br />3. CATCH BASIN INSERTS SHALL BE INSTALLED PRIOR TO
<br />CLEARING AND GRADING ACTIVITY, OR UPON
<br />PLACEMENT OF A NEW CATCH BASIN.
<br />4. SEDIMENT SHALL BE REMOVED FROM TH EUNIT
<br />WHEN IT BECOMES ONE THIRD FULL OR IN
<br />ACCORDANCE WITH THE MANUFACTURES'
<br />INSTRUCTIONS.
<br />5. SEDIMENT REMOVAL SHALL BE ACCOMPLISHED BY
<br />REMOVING THE INLET INSERTS, EMPTYING, AND
<br />RE -INSTALLING IT INTO THE CATCH BASIN. DO NOT
<br />WASH SEDIMENT INTO STORM DRAINS WHILE
<br />CLEANING.
<br />6. SIE THE BELOW INLET GRATE DEVICE (BIGD) FOR THE
<br />STORM WATER STRUCTURE IT WILL SERVICE.
<br />]. THEBIGDSHALLHAVEA BUILT-IN HIGH -FLOW RELIEF
<br />SYSTEM (OVERFLOW BYPASS).
<br />8. THE RETRIEVAL SYSTEM MUST ALLOW REMOVAL OF
<br />THE BIGD WITHOUT SPILLING THE COLLECTED
<br />MATERIAL.
<br />9. PERFORM MAINTENANCE IN ACCORDANCE WITH
<br />STANDARD SPECIFICATION 8-01.3(15).
<br />WSDOT STD PLAN 1-40,20-00 ACCEPTABLE SUBSTITUTE IF
<br />MAINTENANCE MEETS NOTES 1-S
<br />NOTES
<br />1. INSTALL THE ENDS OF THE SILT FENCE TO POINT
<br />SLIGHTLY UPSLOPE TO PREVENT SEDIMENT FROM
<br />FLOWING AROUND THE ENDS OF THE FENCE.
<br />2. PERFORM MAINTENANCE IN ACCORDANCE WITH
<br />WSDOT STANDARD SPECIFICATIONS 8-01.3(9)A
<br />AND 8-01.3(15).
<br />3. SPLICES SHALL NEVER BE PLACED IN LOW SPOTS
<br />OR SUMP LOCATIONS. IF SPLICES ARE LOCATED IN
<br />LOW OR SUMP AREAS THE FENCE MAY NEED TO
<br />BE REINSTALLED UNLESS OTHERWISE APPROVED.
<br />4. INSTALL SILT FENCING PARALLEL TO MAPPED
<br />CONTOUR LINES.
<br />5. DURING EXCAVATION, MINIMIZE DISTURBING
<br />THE GROUND AROUND TRENCH AS MUCH AS IS
<br />FEASIBLE, AND SMOOTH SURFACE FOLLOWING
<br />EXCAVATION TO AVOID CONCENTRATING FLOWS.
<br />COMPACTION MUST BE ADEQUATE TO PREVENT
<br />UNDERCUTTING FLOWS.
<br />0F. BACKUP SUPPORT
<br />FH'O� STEEL POST (TYPICAL)
<br />F TYPICAL
<br />FABRIC
<br />i
<br />i
<br />/ V i
<br />o PP�p
<br />(GEOTEXTILE) /
<br />e
<br />(TYPICAL)
<br />fill
<br />SPLICED FENCE SECTIONS SHALL BE CLOSE ENOUGH TOGETHER
<br />TO PREVENT SILT LADEN WATER FROM ESCAPING THROUGH THE
<br />FENCE ATTHE OVERLAP.
<br />SPLICE DETAIL
<br />WSDOT STD PLAN 1-30.10-02 ACCEPTABLE SUBSTITUTE
<br />EXCEPT STEEL POST REQUIRED
<br />F
<br />CITY OF EVERETT
<br />�En
<br />TT PUBLIC WORKS DEPARTMENT
<br />NOTES
<br />1. STABILIZED CONSTRUCTION ENTRANCE SHALL
<br />MEETTHE REQUIREMENTS OF WSDOT STANDARD
<br />SPECIFICATION SECTION 8-01.3(7).
<br />INSTALL DRIVEWAY CULVERT
<br />IF THERE IS A ROADSIDE DITCH
<br />25,
<br />PRESENT
<br />25'
<br />ROAD
<br />EX15t\4G
<br />30' MIN TYPICAL
<br />_ -- _
<br />PERM EABLE BALLAST TYPICAL SEE
<br />-
<br />\
<br />STANDARD SPECIFICATION
<br />SECTION 9-03.9(2)
<br />1' MIN
<br />LENGTH AS REQUIRED 1W MIN, EXCEPT
<br />DEPTH
<br />MAY BE REDUCEDTO 50' MIN FOR
<br />SITES WITH LESS THAN ONE ACRE
<br />TYPICAL
<br />OF EXPOSED SOIL OR APPROVED BY INSPECTOR
<br />�.
<br />PLACE CONSTRUCTION GEOTEXTI LE FOR SOIL
<br />E
<br />STABILIZATION FROM THE EDGE OF THE EXISTING
<br />FULL WIDTH OF
<br />?
<br />ROADWAY TO THE CONSTRUCTION ENTRANCE,
<br />INGRESS/EGRESS AREA
<br />ING RESE
<br />OR AS DIRECTED BY THE ENGINEER
<br />15'MIN
<br />9
<br />s
<br />ISOMETRIC VIEW
<br />0
<br />CONSTRUCTION ENTRANCE
<br />WSDOT STD PLAN 1-80.10-02 ACCEPTABLE SUBSTITUTE
<br />1
<br />CITY OF EVERETT
<br />B;
<br />� PUBLIC WORKS DEPARTMENT
<br />o a
<br />04/03/201]
<br />CONSTRUCTION ACCESS 201
<br />ts9
<br />STORM DRAINAGE NOTES
<br />CITY OF EVERETT REQUIRED NOTES FOR STORM DRAINAGE PLANS:
<br />1. NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED
<br />OR PUT INTO USE UNTIL IT HAS BEEN INSPECTED, TESTED, AND
<br />ACCEPTED BY THE CITY OF EVERETT.
<br />2. ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT
<br />STANDARDS AND STANDARD SPECIFICATIONS OF WSDOT/APWA.
<br />3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN
<br />OBTAINED FROM AVAILABLE RECORDS AND ARE SHOWN FOR
<br />CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
<br />VERIFICATION OF LOCATIONS AND TO AVOID DAMAGE TO ANY
<br />ADDITIONAL UTILITIES SHOWN. IF CONFLICTS WITH EXISTING UTILITIES
<br />ARISE DURING CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE
<br />PUBLIC WORKS INSPECTOR AND ANY CHANGES REQUIRED SHALL BE
<br />APPROVED BY THE CITY ENGINEER PRIOR TO COMMENCEMENT OF
<br />RELATED CONSTRUCTION ON THE PROJECT.
<br />4. ALL STORM SYSTEMS WITHIN THE PUBLIC RIGHT-OF-WAY OR IN
<br />EASEMENTS MUST BE STAKED BY SURVEY FOR LINE AND GRADE
<br />PRIOR TO STARTING CONSTRUCTION.
<br />5. ALL CATCH BASIN GRATES MUST BE STENCILED OR STAMPED "DUMP
<br />NO WASTE, DRAINS TO STREAM, LAKE, RIVER, PUGET SOUND, OR
<br />WETLAND.' CHOOSE APPROPRIATE FEATURE FOR THE PROJECT.
<br />ADDITIONAL NOTES:
<br />6. ALL PIPE SHALL BE PLACED ON STABLE EARTH, OR IF IN THE OPINION
<br />OF THE INSPECTOR THE EXISTING FOUNDATION IS UNSATISFACTORY,
<br />THEN IT SHALL BE EXCAVATED BELOW GRADE AND BACK -FILLED WITH
<br />A GRAVEL MATERIAL TO SUPPORT THE PIPE.
<br />7. THE BACK FILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE
<br />PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6", MAXIMUM
<br />DEPTH 8"-9", THOROUGHLY STAMPING EACH LAYER. THESE
<br />COMPACTED LAYERS MUST EXTEND FOR ONE DIAMETER ON EACH
<br />SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS TO
<br />COMPLETE THIS FILL OVER PIPE SHALL BE THE SAME AS DESCRIBED.
<br />(REFER TO WSDOT STANDARD SPECIFICATIONS 7-04.3(3) AND
<br />2-03.2(14)C, METHOD B & C).
<br />8. CATCH BASIN OFFSETS ARE MEASURED TO CENTER OF GRATE.
<br />9. ALL CATCH BASINS SHALL BE TYPE A PER C.O.E. STANDARD DWG 402,
<br />EXCEPT AS OTHERWISE NOTED.
<br />10. ALL CATCH BASINS WITH A DEPTH OVER 5.0 FEET TO THE FLOW LINE
<br />SHALL BE A TYPE II CB OR LARGER (MANHOLE).
<br />11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING ALL
<br />MANHOLE, INLET AND CATCH BASIN FRAMES AND GRATES TO GRADE
<br />JUST PRIOR TO POURING CURBS AND PAVING.
<br />12. CATCH BASIN FRAME AND GRATE SHALL BE OLYMPIC FOUNDRY MODEL
<br />5435 LOCKING TYPE OR EQUAL. STANDARD GRATES SHALL BE USED
<br />UNLESS SPECIFIED OTHERWISE.
<br />13. UNLESS OTHERWISE NOTED, ALL STORM SEWER PIPE SHALL BE
<br />CORRUGATED POLYETHYLENE PIPE: THE MATERIAL SUPPLIED UNDER
<br />THIS SPECIFICATION SHALL BE HIGH -DENSITY CORRUGATED
<br />POLYETHYLENE SMOOTH INTERIOR PIPE AND SHALL BE
<br />MANUFACTURED IN CONFORMITY WITH THE LATEST AASHTO
<br />SPECIFICATIONS OR M 294 TYPE S AND THE MATERIAL COMPOUND
<br />SHALL CONFORM TO AASHTO M 294. COUPLERS SHALL COVER NOT
<br />LESS THAN ONE FULL CORRUGATION ON EACH ANNULAR SECTION OF
<br />PIPE AND PASS THE WSDOT STANDARD SPECIFICATION SECTION
<br />7-04.3(4)D LOW PRESSURE AIR TEST FOR STORM SEWERS.
<br />14. GALVANIZED STEEL PIPE SHALL HAVE TYPE 1 ASPHALT COATING.
<br />ALUMINIZED PIPE DOES NOT REQUIRE COATING.
<br />15. STORM WATER RETENTION/DETENTION FACILITIES, STORM DRAINAGE
<br />PIPE AND CATCH BASINS SHALL BE FLUSHED AND CLEANED PRIOR TO
<br />CITY OF EVERETT PUBLIC WORKS ACCEPTANCE.
<br />CLEARING LIMITS
<br />CLEARING LIMITS SHOWN ON PLAN REPRESENT MAXIMUM ALLOWABLE
<br />EXTENT OF CLEARING ON THE PROPERTY. OWNER MAY ELECT TO CLEAR
<br />LESS AREA WITHIN WSDOT RIGHT-OF-WAY. DRAINAGE FACILITY DESIGN IS
<br />BASED ON ASSUMPTION OF MAXIMUM ALLOWED ONSITE CLEARING AND
<br />HARDSCAPE.
<br />MARKING OF CLEARING LIMITS AND PLACEMENT OF EROSION CONTROL
<br />BMPS IN THE FIELD SHALL BE ADJUSTED FOR ACTUAL EXTENT OF
<br />CLEARING AS DIRECTED BY OWNER. CLEARING LIMITS SHALL BE CLEARLY
<br />MARKED IN FIELD PRIOR TO COMMENCEMENT OF SITE WORK.
<br />UNDERGROUND UTILITY NOTE
<br />EX. UNDERGROUND UTILITY LOCATIONS SHOWN HEREON ARE BASED UPON
<br />SURFACE INDICATORS. NO UNDERGROUND LOCATE SERVICE WAS
<br />UTILIZED FOR THEIR LOCATION. THE USE OF THIS MAP FOR THEIR EXACT
<br />LOCATION IS NOT WARRANTED. PRIOR TO CONSTRUCTION USER SHOULD
<br />CALL THE UTILITY LOCATE SERVICE AT 1-800-424-5555 TWO BUSINESS
<br />DAYS BEFORE CONSTRUCTION.
<br />WATER QUALITY STANDARD
<br />STORMWATER RELEASED FROM THIS CONSTRUCTION SITE TO
<br />OFF -SITE DRAINAGE CHANNELS SHALL NOT BE PERMITTED TO
<br />TRANSPORT SEDIMENT LOADINGS EXCEEDING 5 NI ABOVE
<br />BACKGROUND LEVELS.
<br />EROSION CONTROL BMP'S
<br />HIGH VISIBILITY FENCING (BMP C103)
<br />USE IN COMBINATION WITH BMP C233, SILT FENCE AS INDICATED ON
<br />THE PLANS.
<br />CONSTRUCTION ROAD/PARKING AREA STABILIZATION (BMP C107)
<br />ONCE DEMOLITION IS COMPLETE, THE BUILDING FOUNDATIONS AND
<br />SLAB AREAS WILL BE STABILIZED WITH GRAVEL AND CONCRETE.
<br />TEMPORARY & PERMANENT SEEDING (BMP C120)
<br />PERMANENT SEEDING SHALL BE USED TO STABILIZE EXPOSED SOILS
<br />AND SHALL BE PERFORMED UNDER THE DIRECTION OF THE
<br />LANDSCAPE PLANS AND SPECIFICATIONS.
<br />MULCHING (BMP C121)
<br />STABILIZE EXPOSED SURFACES WITH 2"- 4" MULCH WHEN SURFACES
<br />ARE TO BE UNWORKED FOR THE SEASONAL TIME FRAMES LISTED IN
<br />THE TESC NOTES AND SWPPP NARRATIVE.
<br />PLASTIC COVERING (BMP C123)
<br />USE PLASTIC SHEATHING TO PROTECT STOCKPILES. STABILIZE WITH
<br />SAND BAGS CONNECTED WITH ROPE.
<br />TOPSOILING/COMPOSTING (BMP C125)
<br />TOPSOIL EXPOSED SOILS AND PROPOSED PLANTERS.
<br />DUST CONTROL (BMP C140)
<br />CONTRACTOR SHALL IMPLEMENT MEASURES TO PREVENT WIND
<br />TRANSPORT OF DUST FROM SOIL SURFACES. SUCH MEASURES CAN
<br />INCLUDE BUT ARE NOT LIMITED TO THE FOLLOWING: MULCHING AREAS
<br />NOT USED FOR VEHICLE ACCESS, SPRINKLING EXPOSED SURFACES
<br />WITH WATER, SURFACE HAUL ROADS WITH GRAVEL.
<br />STORM INLET PROTECTION (BMP C220)
<br />PLACE INSERTS PER PLAN DETAIL IN EXISTING CATCH BASINS AS
<br />INDICATED ON THE PLAN.
<br />AS NEW CATCH BASINS ARE INSTALLED, THESE SHALL ALSO BE
<br />PROTECTED UNTIL THE DRAINAGE AREA IS STABILIZED.
<br />SILT FENCE (BMP C233)
<br />INSTALL SILT FENCE IN LOCATIONS INDICATED ON THE PLAN.
<br />POLLUTANTS OTHER THAN SEDIMENT
<br />ALL POLLUTANTS, INCLUDING WASTE MATERIALS AND DEMOLITION DEBRIS,
<br />THAT OCCUR ONSITE SHALL BE HANDLED AND DISPOSED OF IN A MANNER
<br />THAT DOES NOT CAUSE CONTAMINATION OF STORMWATER. GOOD
<br />HOUSEKEEPING AND PREVENTATIVE MEASURES WILL BE TAKEN TO
<br />ENSURE THAT THE SITE WILL BE KEPT CLEAN, WELL ORGANIZED, AND FREE
<br />OF DEBRIS. IF REQUIRED, BMPS TO BE IMPLEMENTED TO CONTROL
<br />SPECIFIC SOURCES OF POLLUTANTS ARE DISCUSSED BELOW.
<br />VEHICLES, CONSTRUCTION EQUIPMENT, AND/OR PETROLEUM PRODUCT
<br />STORAGE/DISPENSING:
<br />• ALL VEHICLES, EQUIPMENT, AND PETROLEUM PRODUCT
<br />STORAGE/DISPENSING AREAS WILL BE INSPECTED REGULARLY TO
<br />DETECT ANY LEAKS OR SPILLS, AND TO IDENTIFY MAINTENANCE
<br />NEEDS TO PREVENT LEAKS OR SPILLS.
<br />• ON -SITE FUELING TANKS AND PETROLEUM PRODUCT STORAGE
<br />CONTAINERS SHALL INCLUDE SECONDARY CONTAINMENT.
<br />• SPILL PREVENTION MEASURES, SUCH AS DRIP PANS, WILL BE
<br />USED WHEN CONDUCTING MAINTENANCE AND REPAIR OF
<br />VEHICLES OR EQUIPMENT.
<br />• IN ORDER TO PERFORM EMERGENCY REPAIRS ON SITE,
<br />TEMPORARY PLASTIC WILL BE PLACED BENEATH AND, IF RAINING,
<br />OVER THE VEHICLE.
<br />• CONTAMINATED SURFACES SHALL BE CLEANED IMMEDIATELY
<br />FOLLOWING ANY DISCHARGE OR SPILL INCIDENT.
<br />CHEMICAL STORAGE:
<br />• ANY CHEMICALS STORED IN THE CONSTRUCTION AREAS WILL
<br />CONFORM TO THE APPROPRIATE SOURCE CONTROL BMPS LISTED
<br />IN VOLUME IV OF THE ECOLOGY STORMWATER MANUAL. IN
<br />WESTERN WA, ALL CHEMICALS SHALL HAVE COVER,
<br />CONTAINMENT, AND PROTECTION PROVIDED ON SITE, PER BMP
<br />C153 FOR MATERIAL DELIVERY, STORAGE AND CONTAINMENT IN
<br />SWMMWW 2005
<br />• APPLICATION OF AGRICULTURAL CHEMICALS, INCLUDING
<br />FERTILIZERS AND PESTICIDES, SHALL BE CONDUCTED IN A
<br />MANNER AND AT APPLICATION RATES THAT WILL NOT RESULT IN
<br />LOSS OF CHEMICAL TO STORMWATER RUNOFF. MANUFACTURERS'
<br />RECOMMENDATIONS FOR APPLICATION PROCEDURES AND RATES
<br />SHALL BE FOLLOWED.
<br />DEMOLITION:
<br />• DUST RELEASED FROM DEMOLISHED SIDEWALKS SHALL BE
<br />CONTROLLED USING DUST CONTROL MEASURES (BMP C140).
<br />• STORM DRAIN INLETS VULNERABLE TO STORMWATER DISCHARGE
<br />CARRYING DUST, SOIL, OR DEBRIS WILL BE PROTECTED USING
<br />STORM DRAIN INLET PROTECTION (BMP C220 AS INDICATED ON
<br />THE PLAN).
<br />• PROCESS WATER AND SLURRY RESULTING FROM SAWCUTTING
<br />AND SURFACING OPERATIONS WILL BE PREVENTED FROM
<br />ENTERING THE WATERS OF THE STATE BY IMPLEMENTING
<br />SAWCUTTING AND SURFACING POLLUTION PREVENTION
<br />MEASURES (BMP C152).
<br />1. SLURRY AND CUTTING SHALL BE VACUUMED DURING
<br />CUTTING AND SURFACING OPERATIONS.
<br />2. SLURRY AND CUTTINGS SHALL NOT DRAIN TO ANY NATURAL
<br />OR CONSTRUCTED DRAINAGE CONVEYANCE.
<br />3. COLLECTED SLURRY AND CUTTINGS SHALL BE DISPOSED OF
<br />IN A MANNER THAT DOES NOT VIOLATE GROUNDWATER OR
<br />SURFACE WATER QUALITY STANDARDS.
<br />CONCRETE AND GROUT:
<br />• PROCESS WATER AND SLURRY RESULTING FROM CONCRETE
<br />WORK WILL BE PREVENTED FROM ENTERING THE WATERS OF THE
<br />STATE BY IMPLEMENTING CONCRETE HANDLING MEASURES (BMP
<br />C151).
<br />1. CONCRETE TRUCK CHUTES, PUMPS, AND INTERNALS SHALL
<br />BE WASHED OUT ONLY INTO FORMED AREAS AWAITING
<br />INSTALLATION OF CONCRETE OR ASPHALT.
<br />2. UNUSED CONCRETE REMAINING IN THE TRUCK AND PUMP
<br />SHALL BE RETURNED TO THE ORIGINATING BATCH PLANT
<br />FOR RECYCLING.
<br />3. HAND TOOLS INCLUDING, BUT NOT LIMITED TO, SCREEDS,
<br />SHOVELS, RAKES, FLOATS, AND TROWELS SHALL BE
<br />WASHED OFF ONLY INTO FORMED AREAS AWAITING
<br />INSTALLATION OF CONCRETE OR ASPHALT.
<br />WHEN NO FORMED AREAS ARE AVAILABLE, WASHWATER AND
<br />LEFTOVER PRODUCT SHALL BE CONTAINED IN A LINED
<br />CONTAINER. CONTAINED CONCRETE SHALL BE DISPOSED OF IN A
<br />MANNER THAT DOES NOT VIOLATE GROUNDWATER OR SURFACE
<br />WATER QUALITY STANDARDS.
<br />SANITARY WASTEWATER:
<br />• PORTABLE SANITATION FACILITIES WILL BE FIRMLY SECURED,
<br />REGULARLY MAINTAINED, AND EMPTIED WHEN NECESSARY.
<br />• SOLID WASTE WILL BE STORED IN SECURE, CLEARLY MARKED
<br />CONTAINERS.
<br />OTHER:
<br />• OTHER BMPS WILL BE ADMINISTERED AS NECESSARY TO
<br />ADDRESS ANY ADDITIONAL POLLUTANT SOURCES ON SITE.
<br />MAINTENANCE OF BMP'S
<br />ALL TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL
<br />PRACTICES SHALL BE MAINTAINED AND REPAIRED AS NEEDED TO
<br />ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION.
<br />FACILITIES SHALL BE INSPECTED AT A MINIMUM ON A WEEKLY BASIS
<br />AND IMMEDIATELY AFTER ANY RUNOFF PRODUCING RAIN EVENT. ALL
<br />MAINTENANCE AND REPAIR SHALL BE CONDUCTED IN ACCORDANCE
<br />WITH MARYSVILE STANDARDS. AT A MINIMUM REPAIRS TO BMP'S
<br />SHALL TAKE PRECEDENT OVER OTHER SITE WORK AND COMPLETED
<br />PRIOR TO CLOSING THE SITE OF THE NIGHT. TRAPPED SEDIMENT MUST
<br />BE REMOVED OR STABILIZED ON SITE. DISTURBED SOIL AREAS
<br />RESULTING FROM REMOVAL SHOULD BE PERMANENTLY STABILIZED.
<br />HIGH VISIBILITY FENCING (BMP C103)
<br />INSPECT FENCING AND REPAIR DAMAGED SECTIONS.
<br />CONSTRUCTION ROAD STABILIZATION (BMP C107)
<br />INSPECT STABILIZED AREAS REGULARLY, ESPECIALLY AFTER LARGE
<br />STORM EVENTS. ADD GRAVEL IF NECESSARY AND RESTABILIZE ANY
<br />AREAS FOUND TO BE ERODING.
<br />BMP C120, TEMPORARY SEEDING OF STRIPPED AREAS
<br />SEEDING SHOULD BE SUPPLIED WITH ADEQUATE MOISTURE. SUPPLY
<br />WATER AS NEEDED, ESPECIALLY IN ABNORMALLY HOT OR DRY
<br />WEATHER OR ON ADVERSE SITES. WATER APPLICATION RATES
<br />SHOULD BE CONTROLLED TO PREVENT RUNOFF.
<br />RE -SEEDING -AREAS WHICH FAIL TO ESTABLISH VEGETATIVE COVER
<br />ADEQUATE TO PREVENT EROSION SHALL BE RE -SEEDED AS SOON AS
<br />SUCH AREAS ARE IDENTIFIED.
<br />MULCHING (BMP C121)
<br />MULCHED AREAS SHOULD BE CHECKED PERIODICALLY, ESPECIALLY
<br />FOLLOWING SEVERE STORMS. DAMAGED AREAS OF MULCH OR
<br />TIE -DOWN MATERIAL SHALL BE IMMEDIATELY REPAIRED.
<br />PLASTIC COVERING (BMP C123)
<br />CHECK REGULARLY FOR RIPS AND PLACES WHERE THE PLASTIC MAY
<br />BE DISLODGED. CONTACT
<br />BETWEEN THE PLASTIC AND THE GROUND SHOULD ALWAYS BE
<br />MAINTAINED. ANY AIR BUBBLES FOUND SHOULD BE REMOVED
<br />IMMEDIATELY OR THE PLASTIC MAY RIP DURING THE NEXT WINDY
<br />PERIOD. RE -ANCHOR OR REPLACE THE PLASTIC AS NECESSARY.
<br />TOPSOILING (BMP C125)
<br />INSPECT FOR DAMAGE FROM RAINFALL AND SHEET FLOW. REGRADE
<br />AS NECESSARY.
<br />DUST CONTROL (BMP C140)
<br />RESPRAY AREA AS NECESSARY TO PREVENT WIND EROSION.
<br />STORM DRAIN INLET PROTECTION (BMP C220)
<br />FOR SYSTEMS USING FILTER FABRIC: INSPECTIONS SHOULD BE MADE
<br />ON A REGULAR BASIS, ESPECIALLY AFTER LARGE STORM EVENTS. IF
<br />THE FILTER BAG BECOMES CLOGGED, IT SHOULD BE CLEANED OR
<br />REPLACED.
<br />SILT FENCE (BMP C233)
<br />INSPECT IMMEDIATELY AFTER EACH RAINFALL, AND AT LEAST DAILY
<br />DURING PROLONGED RAINFALL. REPAIR AS NECESSARY.
<br />SEDIMENT MUST BE REMOVED WHEN IT REACHES APPROXIMATELY
<br />ONE THIRD THE HEIGHT OF THE FENCE, ESPECIALLY IF HEAVY RAINS
<br />ARE EXPECTED.
<br />CITY OF EVERETT GENERAL NOTES
<br />1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC)
<br />PLAN DOES NOT CONSTITUTE AN APPROVAL OF
<br />PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF
<br />ROADS, PIPES, RESTRICTORS, CHANNELS,
<br />RETENTION FACILITIES, UTILITIES).
<br />2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE
<br />CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND
<br />UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE
<br />APPLICANT/CONTRACTOR UNTIL ALL
<br />CONSTRUCTION IS COMPLETED AND APPROVED AND
<br />VEGETATION/LANDSCAPING IS ESTABLISHED.
<br />3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS
<br />PLAN SHALL BE CLEARLY FLAGGED IN THE FIELD PRIOR
<br />TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO
<br />DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS
<br />SHALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE
<br />APPLICANT/CONTRACTOR FOR THE DURATION
<br />OF CONSTRUCTION.
<br />4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE
<br />CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND
<br />GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE THAT
<br />SEDIMENT AND SEDIMENT LADEN WATER DO
<br />NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE
<br />APPLICABLE WATER QUALITY STANDARDS.
<br />5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM
<br />REQUIREMENTS FOR ANTICIPATED SITE
<br />CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC
<br />FACILITIES SHALL BE UPGRADED AS NEEDED FOR
<br />UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND
<br />SEDIMENT -LADEN WATER DO NOT LEAVE THE
<br />SITE.
<br />6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND
<br />MAINTAINED BY THE APPLICANT/CONTRACTOR TO
<br />ENSURE THEIR CONTINUED FUNCTIONING, ESPECIALLY AFTER STORM
<br />EVENTS.
<br />7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED
<br />AND MAINTAINED A MINIMUM OF ONCE A
<br />MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM EVENT
<br />8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE
<br />ALLOWED TO ACCUMULATE WITHIN A TRAPPED CATCH
<br />basin. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED
<br />PRIOR TO PAVING. THE CLEANING
<br />OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE
<br />DOWNSTREAM SYSTEM.
<br />9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED
<br />AT THE BEGINNING OF CONSTRUCTION AND
<br />MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL
<br />MEASURES MAY BE REQUIRED TO ENSURE THAT ALL
<br />PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT.
<br />10. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING
<br />TO REMOVE DEBRIS AND SEDIMENT TRACKED OFF
<br />THE SITE.
<br />11. APPROPRIATE MEASURES SHALL BETAKEN TO STOP SEDIMENT
<br />FROM ENTERING SURFACE WATER BODIES IF THE
<br />PROPOSED BMPS FAIL.
<br />12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED
<br />AND/OR UNSTABILIZED FOR NO MORE THAN 2 DAYS
<br />FROM OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN 7
<br />DAYS FROM MAY 1 THROUGH SEPTEMBER 30.
<br />FIELD MARKINGS
<br />BEFORE ANY CLEARING OR GRADING OCCURS, CONTRACTOR OR
<br />SURVEYOR SHALL INSTALL TEMPORARY FIELD MARKINGS AS FOLLOWS:
<br />1. MARK CLEARING LIMITS AS SHOWN ON PLAN OR AS DIRECTED BY
<br />OWNER (LIMITS ON PLAN ARE MAXIMUM ALLOWABLE) WITH
<br />CONTINUOUS RUN OF ORANGE SURVEYOR'S TAPE 4-6 FEET ABOVE
<br />GROUND. CONTRACTOR MAY SUBSTITUTE CONSTRUCTION OR SILT
<br />FENCING FOR SURVEYOR'S TAPE.
<br />2. CONTRACTOR SHALL REQUEST INSPECTION OF FIELD MARKINGS BY
<br />C.O.E. STAFF PRIOR TO COMMENCING CLEARING OR GRADING.
<br />SOIL STOCKPILES
<br />TEMPORARY STOCKPILE LOCATIONS MAY BE ADJUSTED BY CONTRACTOR
<br />IN FIELD. TOPSOIL STRIPPING STOCKPILES SHALL BE WINDROWED
<br />TEMPORARILY ALONG LOT FRONTAGE FOR SPREADING WHEN LOTS ARE
<br />CLEARED. CARE SHOULD BE TAKEN TO AVOID UNINTENTIONAL DRAINAGE
<br />IMPOUNDMENT OR DIVERSION. TOPSOIL STRIPPINGS MAY BE
<br />INCORPORATED INTO EROSION CONTROL DIVERSION BERMS.
<br />STOCKPILES SHALL NOT BE PLACED WITHIN NGPAS, SCREENING BUFFERS,
<br />EXISTING DRAINAGE OR UTILITY EASEMENTS OR RIGHTS -OF -WAY.
<br />STOCKPILE MANAGEMENT SHALL COMPLY WITH T.E.S.C. GENERAL NOTES
<br />ON SHEET C2.1, INCLUDING STABILIZATION WITHIN 24 HOURS.
<br />CERTIFIED EROSION &
<br />SEDIMENT CONTROL LEAD
<br />WASHINGTON STATE D.O.E. REQUIRES THAT A CERTIFIED EROSION AND
<br />SEDIMENT CONTROL LEAD (CESCL) BE RETAINED TO MONITOR T.E.S.0
<br />COMPLIANCE. THE CESCL MUST BE IDENTIFIED ON THE STORMWATER
<br />GENERAL PERMIT APPLICATION AND SHALL ATTEND THE
<br />PRE -CONSTRUCTION MEETING WITH CITY STAFF.
<br />SITE GRADING NOTES
<br />1. ALL GRADING SHALL COMPLY WITH CHAPTER A33 OF THE
<br />INTERNATIONAL BUILDING CODE (CURRENT EDITION).
<br />2. PUBLIC STREETS ARE TO BE KEPT CLEAR OF DIRT AND DEBRIS AT ALL
<br />TIMES DURING CONSTRUCTION. DUST SUPPRESSION AND STREET
<br />CLEANING MUST OCCUR AS DIRECTED BY THE PUBLIC WORKS
<br />INSPECTOR.
<br />3. THE SITE SOILS ARE GENERALLY CONSIDERED MOISTURE SENSITIVE
<br />AND AS SUCH ARE SUSCEPTIBLE TO DISTURBANCE BY CONSTRUCTION
<br />EQUIPMENT, PARTICULARLY DURING PERIODS OF WET WEATHER. THE
<br />GRADING CONTRACTOR SHALL TAKE ALL PRECAUTIONS TO LIMIT
<br />SURFACE DISTURBANCE AND PROTECT THE SITE GRADING AREA FROM
<br />EXCESSIVE RUNOFF EROSION.
<br />4. AREAS TO RECEIVE FILL SHALL BE CLEARED OF ALL VEGETATION AND
<br />DELETERIOUS MATTER.
<br />5. AREAS TO RECEIVE FILL SHALL BE PROOFROLLED. ALL LOOSE AND
<br />SOFT AREAS SHALL BE REMOVED AND REPLACED WITH
<br />STRUCTURAL FILL.
<br />6. ALL FILL MATERIALS USED SHALL BE FREE OF VEGETATION AND
<br />DELETERIOUS MATTER AND SHALL NOT CONTAIN ROCKS GREATER
<br />THAN SIX INCHES IN DIAMETER.
<br />7. STRUCTURAL FILLS SHALL BE PLACED IN EIGHT TO 10 INCH THICK
<br />LOOSE HORIZONTAL LIFTS AND SPREAD UNIFORMLY.
<br />8. AFTER EACH LIFT HAS BEEN SPREAD EVENLY, IT SHALL BE
<br />COMPACTED TO A MINIMUM OF 95%OF MAXIMUM DENSITY
<br />DETERMINED IN ACCORDANCE WITH ASTM D1557 (MODIFIED
<br />PROCTOR).
<br />9. THE SURFACE OF ALL SLOPES SHALL BE COMPACTED. THIS MAY BE
<br />ACCOMPLISHED BY OVER -BUILDING THE SLOPES, THEN CUTTING BACK
<br />TO FINAL GRADES, OR BY RUNNING THE COMPACTOR OVER THE
<br />SLOPE AS EACH FILL LIFT IS BEING PLACED. ALL SLOPES SHALL BE
<br />COMPACTED BY THE END OF EACH WORK DAY.
<br />10. FIELD DENSITY TESTS (IF REQUIRED) WILL BE MADE BY A QUALIFIED
<br />SOILS ENGINEERING FIRM. DENSITY TESTS SHALL BE TAKEN AT OR
<br />JUST BELOW THE SURFACE AT THE FREQUENCY AND LOCATIONS
<br />DETERMINED BY THE SOILS ENGINEERING FIRM. WHEN THE TESTS
<br />INDICATE THAT THE DENSITY OF ANY LAYER OF FILL OR PORTION
<br />THEREOF IS BELOW THE SPECIFIED DENSITY, THE PARTICULAR
<br />SECTION SHALL BE REWORKED UNTIL THE REQUIRED DENSITY HAS
<br />BEEN OBTAINED. ALL TEST RESULTS SHALL BE TRANSMITTED TO THE
<br />CITY OF EVERETT BUILDING DEPARTMENT.
<br />11. A GRADING PERMIT AND APPROVAL OF THE TEMPORARY EROSION AND
<br />SEDIMENTATION CONTROL PLAN SHALL HAVE BEEN OBTAINED FROM
<br />THE CITY OF EVERETT FOR ANY ON -SITE GRADING.
<br />12. ALL CUT AND FILL SLOPES SHALL BE A MAXIMUM OF 2.:1.
<br />13. STOCKPILES ARE TO BE LOCATED IN SAFE AREAS AND ADEQUATELY
<br />PROTECTED TO PREVENT EROSION. HYDROSEED PREFERRED.
<br />14. NO GRADING SHALL OCCUR WITHIN 2 FEET OF PROPERTY BOUNDARY
<br />WITHOUT WRITTEN APPROVAL OF ADJACENT OWNER.
<br />T.E.S.C. GENERAL NOTES
<br />THE NOTES AND DETAILS PROVIDED ON THIS SHEET ILLUSTRATE SOME OF
<br />THE MOST COMMON TEMPORARY EROSION/SILTATION CONTROL BEST
<br />MANAGEMENT PRACTICES (BMPs). ALTHOUGH SOME MEASURES SHOWN HERE
<br />MAY NOT BE SPECIFIED IN THE T.E.S.C. PLAN FOR THIS PROJECT, THE DETAILS
<br />ARE PROVIDED FOR FUTURE REFERENCE SHOULD SITE CONDITIONS REQUIRE
<br />ADDITIONAL MEASURES BEYOND THOSE SPECIFIED. APPROPRIATE
<br />RESPONSES TO UNANTICIPATED SITE CONDITIONS MAY INCLUDE, BUT ARE
<br />NOTLIMI$4RAW.NTUEOFOLLOWING ADDITIONAL BMPS:
<br />• TEMPORARY DITCHES, SWALES, DIKES OR BASINS
<br />• JUTE OR SYNTHETIC MATTING, EITHER GENERIC OR PROPRIETARY
<br />• SLOPE SCARIFICATION OR TERRACING
<br />• ANCHORED PLASTIC SHEETING
<br />• MULCH, BRUSH OR GRAVEL FILTER BERMS
<br />• DUST CONTROL
<br />• TIRE WASH STATIONS
<br />• SODDING
<br />• ROCK CHECK DAMS
<br />SUCH MEASURES SHALL BE SELECTED BY THE CONTRACTOR IN
<br />CONSULTATION WITH THE CITY INSPECTOR AND THE CESCL, AND SHALL BE
<br />INSTALLED PER MANUFACTURER'S SPECIFICATIONS, ENGINEER'S DESIGN OR
<br />STANDARD CONSTRUCTION INDUSTRY PRACTICE AS THE SITUATION DICTATES.
<br />1. THE TEMPORARY EROSION/SEDIMENTATION CONTROL FACILITIES SHALL BE
<br />CONSTRUCTED PRIOR TO ANY GRADING OR LAND CLEARING IN
<br />ACCORDANCE WITH THE APPROVED TEMPORARY EROSION/SEDIMENTATION
<br />CONTROL PLAN. THESE FACILITIES MUST BE SATISFACTORILY MAINTAINED
<br />UNTIL CONSTRUCTION AND LANDSCAPING IS COMPLETED AND THE
<br />POTENTIAL FOR ON -SITE EROSION HAS PASSED.
<br />2. NONCOMPLIANCE WITH THE EROSION CONTROL REQUIREMENTS, WATER
<br />QUALITY REQUIREMENTS, AND/OR CLEARING LIMITS MAY RESULT IN
<br />REVOCATION OF PROJECT PERMITS OR PLAN APPROVAL, FINES AND BOND
<br />FORECLOSURES.
<br />3. THE T.E.S.C. FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM
<br />REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. THE CONTRACTOR
<br />SHALL BE RESPONSIBLE FOR PROVIDING IMPROVED OR MODIFIED
<br />FACILITIES AS NECESSARY TO MAINTAIN RUNOFF WATER QUALITY DURING
<br />AND AFTER SIGNIFICANT STORM EVENTS AND TO ADDRESS THE ACTUAL
<br />SITE AND SOILS CONDITIONS ENCOUNTERED.
<br />4. CONTRACTOR SHALL MAINTAIN ON SITE AT ALL TIMES SUFFICIENT
<br />QUANTITIES OF EROSION CONTROL MATERIALS TO COVER ALL EXPOSED
<br />SOIL IN THE EVENT OF UNANTICIPATED WEATHER CONDITIONS.
<br />CONTRACTOR MAY CONSIDER PHASING GRADING ON LARGE SITES TO
<br />MINIMIZE BARE SOIL EXPOSURE.
<br />5. THE IMPLEMENTATION OF THESE TESC PLANS AND THE CONSTRUCTION,
<br />MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE T.E.S.C.
<br />FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL
<br />ALL CONSTRUCTION IS APPROVED. BARE AND/OR DISTURBED SOILS SHALL
<br />REMAIN UNCOVERED FOR NO MORE THAN 2 DAYS FROM OCTOBER 1
<br />THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY 1
<br />THROUGH SEPTEMBER 30. STABILIZE WITH APPROVED T.E.S.C. METHODS
<br />E.G. SEEDING MULCHING NETTING EROSION BLANKETS PLASTIC
<br />COVERING ETC.. SOIL STOCKPILES SHALL BE STABILIZED WITHIN 24
<br />HOURS.
<br />6. WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED,
<br />IT SHALL BE APPLIED AT A MINIMUM THICKNESS OF TWO INCHES.
<br />7. ANY AREA NEEDING T.E.S.C. MEASURES, NOT REQUIRING IMMEDIATE
<br />ATTENTION, SHALL BE ADDRESSED WITHIN FIFTEEN (15) DAYS.
<br />8. THE T.E.S.C. FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND
<br />MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS
<br />FOLLOWING A STORM EVENT.
<br />9. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
<br />REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED
<br />OR AFTER THE TEMPORARY BMPs ARE NO LONGER NEEDED. TRAPPED
<br />SEDIMENT SHALL BE REMOVED OR STABILIZED ON SITE. DISTURBED SOIL
<br />AREAS RESULTING FROM REMOVAL SHALL BE PERMANENTLY STABILIZED.
<br />10. CONTRACTOR SHALL USE INDUSTRY BEST MANAGEMENT PRACTICES TO
<br />PREVENT PETROLEUM PRODUCTS, FERTILIZERS, CONCRETE BY-PRODUCTS
<br />AND OTHER POLLUTANTS FROM ENTERING OFF -SITE DRAINAGE COURSES.
<br />SLASH PILES AND OTHER SOLID WASTE SHALL BE DISPOSED OF IN
<br />ACCORDANCE WITH ALL APPLICABLE LOCAL REGULATIONS.
<br />11. WASTEWATER FROM PROJECT ACTIVITIES AND DE -WATERING SHALL BE
<br />ROUTED TO AN UPLAND AREA FOR REMOVAL OF FINE SEDIMENTS AND
<br />OTHER CONTAMINANTS. ONLY CLEAN, UNPOLLUTED WATER SHALL LEAVE
<br />THE SITE.
<br />12. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY
<br />SWEEPING. WASHING OF THESE STREETS WILL NOT BE ALLOWED WITHOUT
<br />PRIOR CITY OF EVERETT APPROVAL.
<br />CONTRACTOR RESPONSIBILITY FOR
<br />EROSION SILTATION CONTROL
<br />IT IS THE INTENT OF THIS TEMPORARY EROSION AND SILTATION CONTROL PLAN
<br />THAT STORM WATER RUNOFF BE CONTROLLED AT ALL TIMES TO PREVENT SOIL
<br />EROSION AND TO MAINTAIN WATER QUALITY. ANY AND ALL MEASURES
<br />NECESSARY TO DO SO SHALL BE EMPLOYED BY THE CONTRACTOR.
<br />1. REGARDLESS OF SITE, WEATHER, SOIL OR OTHER CONDITIONS, THE
<br />CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ENSURING THAT EROSION
<br />DOES NOT OCCUR ON THE SITE AND THAT POLLUTED OR SILT -LADEN RUNOFF
<br />DOES NOT LEAVE THE SITE OR ENTER INTO ANY CREEK, STREAM, WETLAND
<br />OR WATER BODY ON OR OFF THE SITE.
<br />2. BEYOND THE MINIMUM REQUIREMENTS SHOWN ON THIS PLAN, THE
<br />CONTRACTOR SHALL BE RESPONSIBLE FOR SELECTING AND IMPLEMENTING
<br />APPROPRIATE METHODS, "BEST MANAGEMENT PRACTICES" (BMPs), FOR STORI
<br />WATER TREATMENT AND CONTROL THAT MEET THE REQUIREMENTS OF BOTH
<br />THE WASHINGTON STATE DEPARTMENT OF ECOLOGY AND CITY OF EVERETT.
<br />3. THE CONTRACTOR SHALL REPORT ALL WATER QUALITY CONCERNS AND
<br />ACTIVITIES TO THE CERTIFIED EROSION AND SEDIMENT CONTROL LEAD
<br />(C.E.S.C.L.) AND TO CITY OF EVERETT. IN THE EVENT THAT THE INSTALLED
<br />WATER QUALITY CONTROL MEASURES ARE INEFFECTIVE AT CONTROLLING
<br />EROSION AND SILTATION, THE CONTRACTOR SHALL IMMEDIATELY REPORT TO
<br />AND CONSULT WITH THE C.E.S. C.L. TO FIND AN APPROPRIATE REMEDY. ALL
<br />CONSTRUCTION ACTIVITIES, WITH THE EXCEPTION OF EROSION AND SILTATION
<br />CONTROL MEASURES, SHALL CEASE UNTIL SUCH TIME AS THE WATER QUALITY
<br />IS BROUGHT INTO COMPLIANCE WITH D.O.E. AND CITY OF EVERETT
<br />REQUIREMENTS.
<br />4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MONITORING WEATHER
<br />FORECASTS AND ANTICIPATING STORM ACTIVITY AND SHALL SCHEDULE ALL
<br />PROJECT ACTIVITIES IN ANTICIPATION OF THE WEATHER.
<br />5. ALL SUPPLIES AND MATERIALS NECESSARY FOR IMPLEMENTING BMPs SHALL BI
<br />STORED ON SITE AND SHALL BE IMMEDIATELY AVAILABLE FOR USE. SUCH
<br />SUPPLIES AND MATERIALS SHALL INCLUDE, BUT NOT BE LIMITED TO, STRAW
<br />BALES OR OTHER MULCHING MATERIAL, SILT FENCING AND STAKES, FILTER
<br />FABRIC, ETC.
<br />6. DURING AND AFTER RUNOFF PRODUCING STORM EVENTS, THE CONTRACTOR
<br />SHALL MONITOR ALL EROSION CONTROL MEASURES AND SHALL PRIORITIZE
<br />IMPLEMENTATION AND MAINTENANCE OF EROSION AND SILTATION CONTROL
<br />MEASURES ABOVE ALL OTHERS.
<br />11111111111111111111. 15/1 T 11
<br />Ankrom •
<br />38 NORTHWEST DAVIS, SUITE 300
<br />PORTLAND, OR 97209
<br />503.245.7100
<br />1505 5TH AVE, SUITE 300
<br />SEATTLE, WA 98101
<br />206.576.1600
<br />1014 HOWARD STREET
<br />SAN FRANCISCO, CA 94103
<br />415.252.7063
<br />©ANKROM MOISAN ARCHITECTS, INC.
<br />C "PASS
<br />Health
<br />Lc,�T US
<br />development partners
<br />O
<br />Do
<br />Ol
<br />W Q
<br />= F
<br />a W
<br />Y LU
<br />U W
<br />O W x
<br />J
<br />� � W
<br />2
<br />j
<br />Q ti
<br />7
<br />o
<br />0
<br />Q m In
<br />O N 2
<br />CC M O
<br />co L7 U
<br />REVISION
<br />DATE
<br />REASON FOR ISSUE
<br />1
<br />12/15/21
<br />50% CD'S
<br />p W H9
<br />F� r4as�2
<br />O�
<br />o
<br />3115
<br />f8T
<br />ONAL
<br />CITY NOTES &
<br />SWPPP DETAILS
<br />DEMOLITION
<br />PERMIT SET
<br />?; T-
<br />PROJECT NUMBER
<br />02.02.2022
<br />1 21-056
<br />SHEET NUMBER
<br />C1.02
<br />
|