My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3322 BROADWAY COMPASS HEALTH 2025-10-03
>
Address Records
>
BROADWAY
>
3322
>
COMPASS HEALTH
>
3322 BROADWAY COMPASS HEALTH 2025-10-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2025 3:03:26 PM
Creation date
9/3/2025 7:38:51 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3322
Tenant Name
COMPASS HEALTH
Imported From Microfiche
No
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
997
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORMWATER SITE PLAN <br />COMPASS HEALTH PHASE <br />AUGUST 5, 2022 <br />PAGE 5 <br />Downspout Dispersion: There is no vegetation native or otherwise in which to disperse runoff. <br />Perforated Stub -out Connections: The roof drain piping is internal to the building to the point of <br />discharge from the building where it is bedded in the dense tills. <br />Vegetative Roof: There are two roof top garden areas that are proposed to be similar in runoff <br />to vegetative roofs. The current total area is approximately 4,200 sf. See landscape plans for <br />details of the roof top planters. <br />Lawn and Landscaped Areas: <br />BMP T5.13 Post Construction Soil Quality and Depth is implemented on landscaped areas. <br />BMP T5.13 POST CONSTRUCTION SOIL QUALITY AND DEPTH <br />Post Construction Soil Quality and Depth will be used on the site to recondition those areas that <br />have been compacted by construction traffic. Additional information is provided on the <br />landscape plans that are part of the construction permit submittal. <br />Conclusion: <br />Having reached the end of List #2, the project complies with BMP T5.13 and will have two roof <br />top planters to further reduce runoff. <br />MR 6: RUNOFF TREATMENT <br />Runoff treatment is not required in the combined sewer area. <br />MR 7: FLOW CONTROL <br />The Phase 2 site has a significant reduction of impervious surface over that of the current site, <br />18,800 sf less of permanent impervious and 5,800 sf less if included the gravel operations pad <br />for construction. Therefore, Flow Control is not required for the Phase 2 work. <br />Roof drains will be connected from the building to the existing sewer through a 12" storm <br />pipeline that has a separate connection to the sewer main from that of the sanitary side sewer. <br />MR 8: WETLAND PROTECTION <br />There are no on -site or off -site wetlands to be protected. <br />MR 9: OPERATIONS AND MAINTENANCE <br />An operations and maintenance manual is provided under a separate cover. <br />[^�crk\Pr e".Ls\i021v,2 -OSG Arkrom mRass He a J L ivDc..S�.,�'ral 7riinaoe Repc-L.dcc <br />
The URL can be used to link to this page
Your browser does not support the video tag.