Laserfiche WebLink
Table of Contents <br />Contents <br />ProjectInformation(1.0)............................................................................................................. 5 <br />ExistingConditions(1.1)......................................................................................................... 5 <br />Proposed Construction Activities(1.2).................................................................................... <br />5 <br />Construction Stormwater Best Management Practices (BMPs)(2.0).......................................... 7 <br />The13 Elements (2.1)............................................................................................................ 7 <br />Element 1: Preserve Vegetation / Mark Clearing Limits(2.1.1)............................................... <br />7 <br />Element 2: Establish Construction Access (2.1.2).................................................................. <br />8 <br />Element 3: Control Flow Rates(2.1.3).................................................................................... <br />9 <br />Element 4: Install Sediment Controls(2.1.4)..........................................................................10 <br />Element 5: Stabilize Soils(2.1.5)...........................................................................................11 <br />Element 6: Protect Slopes (2.1.6)..........................................................................................12 <br />Element 7: Protect Drain Inlets(2.1.7)...................................................................................13 <br />Element 8: Stabilize Channels and Outlets(2.1.8).................................................................14 <br />Element 9: Control Pollutants (2.1.9).....................................................................................15 <br />Element 10: Control Dewatering(2.1.10)...............................................................................19 <br />Element 11: Maintain BMPs (2.1.11).....................................................................................20 <br />Element 12: Manage the Project (2.1.12)..............................................................................21 <br />Element 13: Protect Low Impact Development (LID) BMPs(2.1.13)......................................22 <br />Pollution Prevention Team(3.0)................................................................................................23 <br />Monitoring and Sampling Requirements (4.0)...........................................................................24 <br />SiteInspection(4.1)...............................................................................................................24 <br />Stormwater Quality Sampling (4.2)........................................................................................24 <br />Turbidity Sampling(4.2.1)......................................................................................................24 <br />pHSampling(4.2.2)...............................................................................................................26 <br />Discharges to 303(d) or Total Maximum Daily Load (TMDL) Waterbodies (5.0)........................27 <br />303(d) Listed Waterbodies (5.1)............................................................................................27 <br />TMDLWaterbodies (5.2).......................................................................................................27 <br />Reporting and Record Keeping(6.0).........................................................................................28 <br />RecordKeeping (6.1)............................................................................................................28 <br />SiteLog Book(6.1.1).............................................................................................................28 <br />Records Retention(6.1.2)......................................................................................................28 <br />