My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3322 BROADWAY COMPASS HEALTH 2025-10-03
>
Address Records
>
BROADWAY
>
3322
>
COMPASS HEALTH
>
3322 BROADWAY COMPASS HEALTH 2025-10-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2025 3:03:26 PM
Creation date
9/3/2025 7:38:51 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3322
Tenant Name
COMPASS HEALTH
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
997
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spill prevention measures, such as drip pans, will be used when conducting maintenance <br />and repair of vehicles or equipment. <br />To perform emergency repairs on site, temporary plastic will be placed beneath and, if <br />raining, over the vehicle. <br />Contaminated surfaces shall be cleaned immediately following any discharge or spill <br />incident. <br />Will wheel wash or tire bath system BMPs be used during construction? <br />No <br />Will pH -modifying sources be present on -site? <br />Yes, The footings and slab for the building. <br />Table 3 — pH -Modifying Sources <br />None <br />X <br />Bulk cement <br />Cement kiln dust <br />Fly ash <br />Other cementitious materials <br />New concrete washing or curing waters <br />Waste streams generated from concrete grinding and sawing <br />Exposed aggregate processes <br />Dewatering concrete vaults <br />Concrete pumping and mixer washout waters <br />Recycled concrete <br />Other (i.e., calcium lignosulfonate) [please describe] <br />• Process water and slurry resulting from concrete work will be prevented from entering the <br />waters of the state by implementing concrete handling measures (BMP C151). <br />• Concrete truck chutes, pumps, and internals shall be washed out only into formed areas <br />awaiting installation of concrete or asphalt. <br />• Unused concrete remaining in the truck and pump shall be returned to the originating <br />batch plant for recycling. <br />Hand tools including, but not limited to, screeds, shovels, rakes, floats, and trowels shall <br />be washed off only into formed areas awaiting installation of concrete or asphalt. <br />• When no formed areas are available, wash water and leftover product shall be contained <br />in a lined container. Contained concrete shall be disposed of in a manner that does not <br />violate groundwater or surface water quality standards. <br />Installation Schedules: At time of use. <br />Inspection and Maintenance plan: Inspect during operation and verify BMPs or functioning <br />adequately. Make repairs or revisions as needed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.