Laserfiche WebLink
Generation <br /> Power <br /> Load Bank Test Procedure <br /> Project Location: <br /> Project Description: <br /> Date of Test: <br /> Witnessed By: <br /> 1. Connect Load Bank to the generator. Load Bank shall be equal to 100%of the generator rating <br /> 2. Start generator set(manually) <br /> 3. Apply 25%of the EPS nameplate rating for 30 minutes. <br /> 4. Take readings every 15 minutes per enclosed table <br /> 5. Apply 50%of the EPS nameplate rating for 30 minutes. <br /> 6. Take readings every 15 minutes per enclosed table <br /> 7. Apply 75%of the EPS nameplate rating for 60 minutes. <br /> 8. Take readings every 15 minutes per enclosed table <br /> 9. Remove load from generator set <br /> 10. Let the unit cool down for 5 minutes <br /> 11. Shut off generator set <br /> 12. Disconnect load bank from generator set <br /> 13. Put generator set back in Auto <br /> 14. Test complete <br /> PERFORM 2 HOUR LOAD BANK TEST ON STANDBY GENERATOR. DISCONNECT BUILDING CONDUCTORS, <br /> CONNECT LOAD BANK, PERFORM LOAD BANK TEST, LAND AND TORQUE BUILDING CONDUCTORS <br />