My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7000 HARDESON RD 2025-09-29
>
Address Records
>
HARDESON RD
>
7000
>
7000 HARDESON RD 2025-09-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2025 9:49:47 AM
Creation date
9/4/2025 9:47:40 AM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7000
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Generation <br /> Power <br /> Load Bank Test Procedure <br /> Project Location: <br /> Project Description: <br /> Date of Test: <br /> Witnessed By: <br /> 1. Connect Load Bank to the generator. Load Bank shall be equal to 100%of the generator rating <br /> 2. Start generator set(manually) <br /> 3. Apply 25%of the EPS nameplate rating for 30 minutes. <br /> 4. Take readings every 15 minutes per enclosed table <br /> 5. Apply 50%of the EPS nameplate rating for 30 minutes. <br /> 6. Take readings every 15 minutes per enclosed table <br /> 7. Apply 75%of the EPS nameplate rating for 60 minutes. <br /> 8. Take readings every 15 minutes per enclosed table <br /> 9. Remove load from generator set <br /> 10. Let the unit cool down for 5 minutes <br /> 11. Shut off generator set <br /> 12. Disconnect load bank from generator set <br /> 13. Put generator set back in Auto <br /> 14. Test complete <br /> PERFORM 2 HOUR LOAD BANK TEST ON STANDBY GENERATOR. DISCONNECT BUILDING CONDUCTORS, <br /> CONNECT LOAD BANK, PERFORM LOAD BANK TEST, LAND AND TORQUE BUILDING CONDUCTORS <br />
The URL can be used to link to this page
Your browser does not support the video tag.