My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1721 MAPLE ST 2025-09-29
>
Address Records
>
MAPLE ST
>
1721
>
1721 MAPLE ST 2025-09-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 10:47:38 AM
Creation date
9/5/2025 9:12:42 AM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
1721
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jireh Asphalt&Concrete Inc � IRF=H <br /> LIC#JIREHCS861 N5 <br /> 10121 Evergreen Way suite 25-515 d <br /> EVERETT, WA 98204 <br /> Phone:425-737-6355 <br /> Contact:Wilmer Herrera <br /> Email:info@jirehconstructioninc.com <br /> Customer Address <br /> Evan Ebert <br /> 1721 Maple ST <br /> Everett,WA 98201 <br /> 425-275-1628 <br /> evanebert7@gmail.com <br /> Quote#: 28943 <br /> Date: Nov 1, 2021 <br /> Description Total <br /> NEW CONCRETE DRIVEWAY $4,236.79 <br /> * Remove section of existing concrete walkway approx 16sgft <br /> * Remove existing concrete driveway 10'X 7'X 4" <br /> * Remove grass and excavate about 6" up to 8" of dirt <br /> * Haul away, pay dump fees, <br /> * Re grade sub base, <br /> * Install new gravel base 2"-3"thick, <br /> * Compact base using plate compactor, <br /> * Set forms for new concrete driveway, <br /> * Reinforce base with wire mesh, <br /> * Supply and pour concrete 4" thick commercial grade 4000 PSI tooled joints broom finish <br /> approx 200sgft <br /> PER COSTUMER REQUEST THIS DRIVEWAY WILL HAVE LAMP BLACK CONCRETE COLOR <br /> NEW 3/4 WASH GRAVEL APRON $1,950.87 <br /> * Remove grass and excavate 4" of dirt <br /> * Haul away, <br /> * Pay dump fees, <br /> * Re grade sub base, <br /> * Compact gravel base using plate compactor <br /> * Supply and install new 3/4 wash gravel approx 138sgft <br /> Subtotal $6,187.66 <br /> 10.0%Tax $618.77 <br /> Tota 1 $6,806.43 <br /> Jireh Asphalt&Concrete Inc I Phone:425-737-6355 I www.jirehconstructioninc.com <br /> Pagel of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.