My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2600 FEDERAL AVE 2021 PORT OF EVERETT 2025-09-29
>
Address Records
>
FEDERAL AVE
>
2600
>
PORT OF EVERETT
>
2600 FEDERAL AVE 2021 PORT OF EVERETT 2025-09-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 11:38:10 AM
Creation date
9/5/2025 12:01:45 PM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
2600
Tenant Name
PORT OF EVERETT
Year
2021
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Maintenance <br /> Depending on the configuration of the particular system, <br /> maintenance personnel will be required to enter the vault to <br /> perform the maintenance. <br /> Important: If vault entry is required, OSHA rules for confined I <br /> space entry must be followed. <br /> Filter cartridge replacement should occur during dry weather. <br /> It may be necessary to plug the filter inlet pipe if base flows is <br /> occurring. <br /> Replacement cartridges can be delivered to the site or customers <br /> facility. Information concerning how to obtain the replacement <br /> cartridges is available from Contech Engineered Solutions. �� <br /> Warning: In the case of a spill,the maintenance personnel <br /> should abort maintenance activities until the proper guidance <br /> Mai l <br /> is obtained. Notify the local hazard control agency and <br /> Contech Engineered Solutions immediately. <br /> To conduct cartridge replacement and sediment removal 4 <br /> maintenance: � <br /> 1. If applicable, set up safety equipment to protect maintenance <br /> personnel and pedestrians from site hazards. <br /> 2. Visually inspect the external condition of the unit and take <br /> notes concerning defects/problems. ' <br /> 3. Open the doors(access portals)to the vault and allow the <br /> system to vent. <br /> 4. Without entering the vault, give the inside of the unit, Important: Care must be used to avoid damaging the <br /> including components, a general condition inspection. cartridges during removal and installation.The cost of <br /> 5. Make notes about the external and internal condition of repairing components damaged during maintenance will be <br /> the vault. Give particular attention to recording the level of the responsibility of the owner. <br /> sediment build-up on the floor of the vault, in the forebay, C. Set the used cartridge aside or load onto the hauling <br /> and on top of the internal components. truck. <br /> 6. Using appropriate equipment offload the replacement <br /> cartridges(up to 150 lbs. each)and set aside. D. Continue steps a through c until all cartridges have been <br /> 7. Remove used cartridges from the vault using one of the removed. <br /> following methods: <br /> Method 2: <br /> Method 1 : A. This activity will require that maintenance personnel enter <br /> A. This activity will require that maintenance personnel enter the vault to remove the cartridges from the under drain <br /> the vault to remove the cartridges from the under drain manifold and place them under the vault opening for <br /> manifold and place them under the vault opening for lifting (removal). Disconnect each filter cartridge from the <br /> lifting (removal). Disconnect each filter cartridge from the underdrain connector by rotating counterclockwise 1/4 of <br /> underdrain connector by rotating counterclockwise 1/4 of a turn. Roll the loose cartridge, on edge,to a convenient <br /> a turn. Roll the loose cartridge, on edge, to a convenient spot beneath the vault access. <br /> spot beneath the vault access. B. Unscrew the cartridge cap. <br /> Using appropriate hoisting equipment, attach a cable C. Remove the cartridge hood and float. <br /> from the boom, crane, or tripod to the loose cartridge. <br /> Contact Contech Engineered Solutions for suggested D. At location under structure access,tip the cartridge on its <br /> attachment devices. side. <br /> B. Remove the used cartridges(up to 250 lbs. each)from the E. Empty the cartridge onto the vault floor. Reassemble the <br /> vault. empty cartridge. <br /> F. Set the empty, used cartridge aside or load onto the <br /> hauling truck. <br /> G. Continue steps a through e until all cartridges have been <br /> removed. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.