Laserfiche WebLink
UNDERGROUND UTILITY STRUCTURES DESIGN LOADING CRITERIA <br /> TRAVEL LOADING: 1. ALL UNDERGROUND AND AT GRADE STRUCTURES INCLUDING MANHOLES, CATCH BASINS, HAND HOLES, VAULTS, <br /> CLEANOUTS AND OTHER STRUCTURES, INCLUDING ALL RINGS, COVERS, HATCHES, GRATES AND OTHER FEATURES <br /> AXLE LOADS: 139K/AXLE 69.51< 69.5K CL STEER AXLE CL DRIVE AXLE WHICH MAY APPLY, SHALL BE CONTRACTOR DESIGNED. ALL VAULTS SHALL BE CONTRACTOR DESIGNED TO WITHSTAND <br /> LOADING CRITERIA FOR THE TAYLOR "BIG RED" THDC-976 CONTAINER HANDLER SHOWN ON THIS SHEET UNLESS <br /> NOTED OTHERWISE. VAULTS LOCATED WITHIN THE PROTECTIVE BOLLARDS SHALL BE CONTRACTOR DESIGNED TO <br /> p� IE Ps WITHSTAND LOADING CRITERIA FOR THE AASHTO HIS 25 TRUCK. <br /> III ��� III _C <br /> 2. LID CASTING AND FRAME SHALL BE 200 KIP PROOF TEST LOAD RATED PER AASHTO M306. <br /> �0 3. CONTRACTOR SHALL SUBMIT STAMPED AND SIGNED SHOP DRAWINGS AND CALCULATIONS COMPLETED BY A <br /> 7 SPA © 5-5" OC 13'-8" WASHINGTON STATE REGISTERED STRUCTURAL ENGINEER FOR APPROVAL BY THE ENGINEER PRIOR TO FABRICATION <br /> CL CL I'S IRdI OF ALL UNDERGROUND UTILITY STRUCTURES. SHOP DRAWINGS AND CALCULATIONS PROVIDED BY THE CONTRACTOR <br /> -GE SHALL ADDRESS BUOYANCY AND SOIL BEARING PRESSURE. <br /> OPERATING LOADING: (MAXIMUM OUTRIGGER LOAD) Ls N d 4. STANDARD PLAN REFERENCES AND MANUFACTURER MODEL NUMBERS FOR UNDERGROUND UTILITY STRUCTURES ARE <br /> INTENDED TO PROVIDE INTERIOR GEOMETRY AND INTENT ONLY. THE CONTRACTOR SHALL INCREASE REQUIRED <br /> 3� 5'-loll Ld REINFORCING AND WALL THICKNESS, AND CHANGE ACCESS GRATE AND COVER AS REQUIRED TO ACCOMMODATE <br /> 19 67' LOADING CRITERIA REQUIREMENTS. <br /> J Ps = 16K Pd = 65k 5. REFER TO THE GEOTECHNICAL ENGINEERING DESIGN REPORT DATED MAY, 2021 PREPARED BY LANDAU ASSOCIATES <br /> 693K 401 K \ U (INCLUDES 10% IMPACT) (INCLUDES 10% IMPACT) FOR SOIL DESIGN CRITERIA TO BE APPLIED TO VAULT DESIGN. <br /> Ws = 20" Wd = 51" 6. DEAD LOAD SHALL BE APPLIED TO ALL STRUCTURES, WHICH INCLUDES THE WEIGHT OF THE CONSTRUCTION <br /> h Ls = 6.1" Ld = 23" MATERIALS AND THE SOIL. <br /> qs = 131 psi qd = 112 psi <br /> � 304K 121K TAYLOR BAG RED THDC-976 CONTAINER HANDLER 7. LIVE LOADS SHALL BE APPLIED TO ALL STRUCTURES TO ACT SIMULTANEOUSLY AND IN COMBINATION WITH DEAD <br /> - - - LOADS, SOIL LOADS AND HYDROSTATIC PRESSURE. <br /> 49'-2 1/2" NOTE: 8. MEASURED DEPTH TO GROUNDWATER IN THE UPLAND AREAS OF THE NORTON TERMINAL GENERALLY RANGES 6 TO <br /> CONTAINER HANDLING REACH STACKERS 12 FEET BELOW GROUND SURFACE, BUT IS SHALLOWER ALONG THE EAST EDGE OF THE SITE AS DESCRIBED IN THE <br /> CL CL CURRENTLY USED ON SITE ARE HYSTER GEOTECHNICAL REPORT, DEWATERING MAY BE REQUIRED FOR INSTALLATION OF UTILITY LINES AND STRUCTURES <br /> RS46-36CH AND LINDE C4535TLS. THE DEPENDING UPON LOCATION, TIME OF YEAR AND TIDE ELEVATION. SEE SPECIFICATIONS AND SOIL AND GROUNDWATER <br /> OUTRIGGER PLACEMENT SHALL BE BETWEEN GRID LINES TAYLOR THPC-976 LOADING WILL GOVERN MANAGEMENT PLAN FOR ADDITIONAL GROUNDWATER INFORMATION. <br /> A-H. OUTRIGGERS SHALL BE PLACED PARALLEL TO THE OVER THE HYSTER AND LINDE LOADING. <br /> BERTHING FACE OF WHARF & SHALL NOT BE PLACED <br /> ON VAULT LIDS OR TRENCH DRAINS <br /> TEREX HMK 7608 MOBILE HARBOR CRANE N CD o °� o <br /> o � CD <br /> 0.1 w - 0.4w - 0.4w CL <br /> o.i w - 0.4 w - 0.4 w CL <br /> 14'-0" 14' TO 30' <br /> W = COMBINED WEIGHT ON THE FIRST TWO <br /> AXLES WHICH IS THE SAME AS FOR THE <br /> CORRESPONDING H TRUCK. <br /> NOTE: ADD 10% IMPACT TO ABOVE LOADS <br /> HS 25 TRUCK = (1.25 x HS20) <br /> VERT DATUM: NAVD 88 <br /> CONV TO MLLW = NAVD88+2.03 <br /> HORZ DATUM: NAD 83/91 Z <br /> IF IS LESS THAN <br /> RECORD DRAWING REDUCETSCALE ACCORDINGLY 22x34 a <br /> PROJECT ENGINEER: SCALE: <br /> RECORD CONDITIONS N. WATSON ASSPORT OF EVERETT SHOWN DWG. N0. <br /> G1 .3 <br /> ILLUSTRATED IN THESE <br /> Port of PLANS REFLECT DESIGNED BY: DATE: NORTON TERMINAL DEVELOPMENT <br /> J. BECKER 05/07/2021 CIP NO. <br /> EVERETT1Tff INFORMATION 1-8-900-05 O <br /> DRAWN BY: CHECKED BY: <br /> m/os/2o23 NW RECORD DRAWING PROVIDED BY THE K. EDWARDS, D. YU N. WATSON PROJECT <br /> 1601 5th Avenue,Suite 1300 0 06/21/2021 Nw ISSUED FOR BID CONTRACTOR.RECORD UTILITY STRUCTURE NO. MT—NT-2021-02.2 V <br /> P.O� BOX 538 Seattle,Washington 98101 ® 05/07/2021 NW FOR CIN REVIEW APPROVED BY: <br /> EVERETT, WA 98206 (206)382-0600 Fax(206)382-0500 CONDITIONS WERE NOT W�/ <br /> (425) 259-3164 PROJECT NO.1600120 NO. DATE BY REVISION NO. DATE BY REVISION VERIFIED BY ENGINEER. LOADING CRITERIA SHEET NO. 04 OF 150 w <br />