A <br /> CITY OF EVERETT STANDARD TESC NOTES (VOL. 1 , 2-5� <br /> 1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD <br /> OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES). <br /> 2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE <br /> ESC FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED <br /> AND PERMANENT STABILIZATION MEASURES ARE ESTABLISHED. <br /> 3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED IN THE FIELD PRIOR TO <br /> CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL BE <br /> PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE APPLICANT/CONTRACTOR FOR THE DURATION OF CONSTRUCTION. <br /> 4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND GRADING <br /> ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE <br /> SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE WATER QUALITY STANDARDS. <br /> 5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE <br /> CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO <br /> ENSURE THAT SEDIMENT AND SEDIMENT-LADEN WATER DO NO LEAVE THE SITE. <br /> 6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE APPLICANT/CONTRACTOR TO ENSURE THEIR <br /> CONTINUED FUNCTIONING, ESPECIALLY AFTER STORM EVENTS. <br /> 7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN THE 48 <br /> HOURS FOLLOWING A MAJOR STORM EVENT. <br /> 8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A TRAPPED CATCH BASIN. ALL <br /> CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH <br /> SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM. <br /> 9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE <br /> DURATION OF THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR <br /> THE DURATION OF THE PROJECT. <br /> 10. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND SEDIMENT TRACKED OFF THE SITE. <br /> 11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE WATER BODIES IF PROPOSED BMPs FAIL. <br /> PLASTIC SHEETING <br /> (MIN 20 MIL THICKNESS) 12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR NO MORE THAN 2 DAYS FROM <br /> ABOVE AND BELOW STOCKPILE OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY 1 THROUGH SEPTEMBER 30. <br /> ECOLOGY BLOCK <br /> ECOLOGY BLOCK SAND BAGS NOTES o <br /> 1 <br /> SAND BAGS R Y 1. STOCKPILED MATERIALS SHALL BE COVERED AND SECURED FROM WIND, <br /> STOCKPILED RAIN, AND OTHER DISTURBANCES AT ALL TIMES EXCEPT DURING ACTIVE <br /> T R A S LOADING AND UNLOADING. <br /> 2 PUMPING TO A TOR HCONTAINMENT VESSEL WITHINALL REMOVE WATER FOR PI LE I B ANALYSS THE OTODETERMNEITS <br /> PROPER DISPOSAL. CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSAL <br /> OF COLLECTED WATER IN THE STOCKPILE AREA. <br /> '/f✓������/,��i�`i�T///��`:�`i/��i��`�i�`//�j�`���������/ice//�i�//��.�i���i�����ii 1/iY/�\��//��!/��!< <br /> 3. CONTRACTOR IS RESPONSIBLE FOR SOIL AND STOCKPILE MANAGEMENT, <br /> INCLUDING SIZE, LOCATION AND NUMBER OF STOCKPILES. SEE <br /> Q SPECIFICATIONS FOR FURTHER REQUIREMENTS. <br /> 4. IF MULTIPLE SHEETS OF PLASTIC SHEETING ARE USED ABOVE OR BELOW <br /> THE STOCKPILES, THEY MUST OVERLAP BY 3' MINIMUM. <br /> 5. BARRIER REQUIRED AT TOE OF STOCKPILES. <br /> ® 6. SECURE COVERING TIGHTLY IN PLACE BY USING SANDBAGS OR TIRES ON <br /> 1 STOCKPILE COVER ROPES WITH MAXIMUM 10' GRID SPACING IN ALL DIRECTIONS. <br /> C1.1 C1.4 SCALE: NTS 7. STOCKPILES MUST BE LOCATED MORE THAN 75' FROM SHORELINE AND <br /> AWAY FROM STORM DRAIN CATCH BASINS. <br /> 8. GROUND SURFACES UNDER CONTAMINATED MATERIAL STOCKPILES SHALL <br /> BE FREE OF OBJECTS THAT WILL DAMAGE SHEETING, OR A LAYER OF CALL48 HOURS <br /> GEOTEXTILE OR PLYWOOD SHALL BE PLACED BELOW. BEFORE YOU DIG <br /> DIAL 811 <br /> VERT DATUM: NAVD 88 <br /> CONV TO MLLW = NAVD88+2.03 <br /> HORZ DATUM: NAD 83/91 Z <br /> IF SHEET IS THAN <br /> RECORD DRAWING EDUCE SCALELESS ACCORDI GLY 4 a <br /> PROJECT WATSONENGINEER: SCALEPORT OF EVERETT DWG. N0. CIA <br /> RECORD CONDITIONS N. W ASS SHOWN <br /> ILLUSTRATED IN THESE <br /> Port o,f PLANS REFLECT DESIGNED BY: DATE: NORTON TERMINAL DEVELOPMENT <br /> J. BECKER 06/21/2021 CIP NO. <br /> EVERETT INFORMATION 1-8-900-OS O <br /> PROVIDED BY THE DRAWN BY: CHECKED BY: & MTCA 3RD INTERIM ACTION <br /> 0 07/05/2023 NW RECORD DRAWING K. EDWARDS, D. YU N. WATSON PROJECT <br /> 1601 5th Avenue,Suite 1300 t0 07/09/2021 NW ADDENDUM 1 CONTRACTOR.RECORD T E S C STOCKPILE NO. MT-NT-2021-02.2 V P.O. Box 53a Seattle,Washington 98101 <br /> ® 06/21/2021 NW ISSUED FOR BID CONDITIONS WERE NOT APPROVED BY: <br /> EVERETT, WA 98206 (206)382-0600 Fax(206)382-0500 <br /> W <br /> (425) 259-3164 PROJECT NO.1600120 NO. DATE BY REVISION NO. DATE BY REVISION VERIFIED BY ENGINEER. COVER DETAILS SHEET NO. 22 OF 150 <br />