My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2600 FEDERAL AVE 2021 PORT OF EVERETT 2025-09-29
>
Address Records
>
FEDERAL AVE
>
2600
>
PORT OF EVERETT
>
2600 FEDERAL AVE 2021 PORT OF EVERETT 2025-09-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 11:38:10 AM
Creation date
9/5/2025 12:01:45 PM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
2600
Tenant Name
PORT OF EVERETT
Year
2021
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- --� HIGH-MAST LIGHT POLE& FIRE HYDRANT, P� x <br /> ' - - -- -------- --- - ! �� MA SEE CoS' <br /> 813 TOP N®���NIL St-�AEF-�- Iiiedtimmimm 0 0 1 mmmmm ME mmmmm ME mmmmm M &I m m <br /> ■ r\ _.....\ J �----- -- . - �18.13 TOP'J 1. SEAL ALL LONGITUDINAL AND TRANSVERSE <br /> x NT-HML-06 <br /> 1 7.71 FG JOINTS BETWEEN NEW REPLACEMENT AND <br /> - --i EXISTING PAVEMENTS PER SPECIFICATIONS. <br /> 7.70 18.13 TOP 8.13 TOP <br /> 2. ADJUST EXISTING MANHOLE,HANDHOLE,INLET <br /> 11 x 17.80 FG 17.8D FG / RIM,AND/OR VALVE COVER TO GRADE PRIOR <br /> ■ I TO PAVING. PROTECT-IN-PLACE. <br /> ■ <br /> I I x D ELECTRICAL EQUIPMENT PAD <br /> 11 �C3.8 S1.3 <br /> 1 <br /> Illlx - � ----� ■ LEGEND <br /> IIRIDGELINE=19.51 <br /> Ix 2HI:1Vx HMA PAVEMENT,9'HMA OVER 12" <br /> �o ❑ CRBC SEE SECTION A ON C3.2 <br /> II11x � I <br /> IIIIN : 17,30 FINISH GRADE SPOT ELEVATION <br /> EX CONTAINER STORAGE PAD II --- -- ----- 0.7% FINISH GRADE SLOPE <br /> II x ��11 PAVEMENT HORIZONTAL <br /> ■ II x ■ XX CONTROL POINT <br /> (SEE C3.22 FOR PAVEMENT <br /> HORIZONTAL CONTROL SCHEDULE) <br /> ON <br /> II x <br /> IN I n L� II TRENCH DRAIN, TYP <br /> 18.08 3.8 S 1.3 <br /> ■ WAREHOUSE TENANT LEASEHOLD TRENCH DRAIN Ilx NT=18.0310 <br /> L RIM=18.03 ■ <br /> ` HIGH POINT <br /> ON \ �RIM=18.03 ■ <br /> \ 1 v <br /> IN <br /> 8.08 �c <br /> ■ \ -18.08 1 -7 ■ <br /> C3.8 C3.14 II ( 18.08 <br /> r 5' WIDE CONCRETE i NT-ce-os-J ----------� 1 - o -�- <br /> ■ \>> C3.8 S1.3 GUTTER, TYP L RIM=tsso J <br /> �I 11 I <br /> ■ ---- e <br /> - 111 x <br /> NT-CB-O6 � <br /> � � RIM=19.90 <br /> - -- 20.14 HP --- 6�27f EG I x NT-CB-04 <br /> 2Q21 RIM=19.89 <br /> J \ ` rr=0.50%- -0.50%- 0.50%- _0.50% \ ®4K�, <br /> ■ ---20.13 FL c� -- z ■ <br /> ■ `/ 37 3 N HTML-1t ✓__-i �_ //\ ■ <br /> 20.21 <br /> 36 I E U \ <br /> ✓ I 1 C3.8 S 1.3 <br /> Ilmm <br /> ■ r 111Ix 21.2 220.90 /\ f/ CONCRETE GUTTER, TYP C3.8 S1.3 ■ - - - <br /> ■ i( / I I 64 RIDGELINE=20.90 ■ <br /> / - 51 0.4' ---- <br /> v o I I I 20.9D 65 co�C GU TER,T P 68 20.90 HP K E Y M A P <br /> ■ EX WAREHOUSE BLDG C J III P \ 0,50% Q50% 0,50% 0.50% ■ f� <br /> l Z <br /> "� \ / NT-CB-09 / \ <br /> III RIM=20.30 / - A V r RIM-20.30 // 30' 0 30 60' <br /> N Tq /*I � `�� -� <br /> ■ I I �C3.8S1. ���� � ��� ■ 15' 45' <br /> ■ 35 Ix - 8 / ■ SCALE: 1"=30' <br /> J \ / 34 <br /> N 21.60 -21.60 • - CALL 48 HOURS <br /> 1.60 <br /> 21.60 21.60 2 _ <br /> ■ <br /> x _��---_ 67- � i• ■ BEFORE YOU DIG <br /> DIAL811 <br /> = --- <br /> ■ -�� � -�----��- `,_�� _ ____ -- � ����■ VERT DATUM: NAVD 88 <br /> - _ -9 // _ �■ CONV TO MLLW = NAVD88+2.03 <br /> LINE HORZ DATUM: NAD 83/91 Z <br /> 1 -- IF SHEET IS LESS THAN 22x34 <br /> 4� <br /> REDUCE SCALE ACCORDINGLY Q <br /> R ENGINEER: SCALE: PORT OF EVERETT DWG. N0. C3 8 <br /> ® o7/os/zoz3 N. WATSONNW RECORD DRAWING RECORD CONDITIONS N. W 1" = 30' 0 <br /> ® 12/02/2021 JB DELETE ECOLOGY BLOCK WALL, ILLUSTRATED IN THESE <br /> ADD EX WHS GRAVEL PAD PLANS REFLECT DESIGNED BY: DATE: Q <br /> Port Of CONTOURS <br /> ANDPAV UPDATE <br /> G FINAL TES INFORMATION J. BECKER 05/07/2021 NORTON TERMINAL DEVELOPMENT GIP NO.GRADE � <br /> EVERETT 1-8-900-051Tff 0 <br /> 0 11 11 2021 NW REVISED PER RFI030 DRAWN BY CHECKED BY: <br /> / / PROVIDED BY THE & MTCA 3RD INTERIM ACTION <br /> 16015th Avenue,Suite 1300 0 06/21/2021 NW ISSUED FOR BID CONTRACTOR.RECORD K. EDWARDS, D. YU N. WATSON PROJECT <br /> P.O. BOX 536 GRADING DETAIL PLAN N0. MT-NT-2021-02.2 W <br /> Seattle,Washington 9206) ® 05/07/2021 NW FOR CITY REVIEW APPROVED aY: <br /> EVERETT, WA 98206 (206)382-0600 Fax(206)382-0500 CONDITIONS WERE NOT C <br /> (425) 259-3164 PROJECT NO.1600120 NO. DATE BY REVISION NO. DATE BY REVISION VERIFIED BY ENGINEER. (5 OF 7) SHEET NO. 36 OF 150 w <br />
The URL can be used to link to this page
Your browser does not support the video tag.