My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2600 FEDERAL AVE 2021 PORT OF EVERETT 2025-09-29
>
Address Records
>
FEDERAL AVE
>
2600
>
PORT OF EVERETT
>
2600 FEDERAL AVE 2021 PORT OF EVERETT 2025-09-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 11:38:10 AM
Creation date
9/5/2025 12:01:45 PM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
2600
Tenant Name
PORT OF EVERETT
Year
2021
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HIGH-MAST POLE FOUNDATION <br /> THE HIGH MAST POLE FOUNDATIONS ARE SUPPORTED ON 36" <br /> DRILLED SHAFTS. THE POLE REACTIONS ARE PROVIDED BY THE <br /> LIGHT POLE MANUFACTURER AND ARE LISTED AS MAXIMUM BASE <br /> REACTIONS FOR THE FOUNDATIONS ON THE DRAWINGS. THE <br /> PROJECT GEOTECHNICAL ENGINEER PROVIDED LPILE PARAMETERS <br /> FOR EACH LIGHT POLE DUE TO THE VARIED SOIL CONDITIONS <br /> ACROSS THE SITE. ONE LPILE MODEL IS SHOWN BELOW TO SHOW <br /> THE DESIGN CONCEPT. PILE LENGTHS HAVE BEEN SELECTED TO <br /> PREVENT MOVEMENT AT THE TIP OF THE SHAFT UNDER LOADING. <br /> SHEAR AND FLEXURAL CAPACITIES FOR THE SHAFT ARE CHECKED <br /> AGAINST MAXIMUM DEMANDS DETERMINED IN LPILE. <br /> V HIGH MAST POLE, SEE <br /> S1.1 FOR MAX <br /> N REACTIONS <br /> nn <br /> 8'X5' CONC VEHICLE BARRIER <br /> 4'-011 III 11 <br /> Lj; <br /> 0000 o°o 0000000/�\� <br /> On> o0000 �/ 1 <br /> ° I I I I 000 \/1 <br /> ° - i o <br /> 36" DIA DRILLED SHAFT <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.