My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2600 FEDERAL AVE 2021 PORT OF EVERETT 2025-09-29
>
Address Records
>
FEDERAL AVE
>
2600
>
PORT OF EVERETT
>
2600 FEDERAL AVE 2021 PORT OF EVERETT 2025-09-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 11:38:10 AM
Creation date
9/5/2025 12:01:45 PM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
2600
Tenant Name
PORT OF EVERETT
Year
2021
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 2/18/2022 2/18/2022 ELEC 04- MIKE BEARDA PARTIAL eTRAKiT Inspection Request <br /> GROUNDING APPROVAL <br /> Notes: <br /> 2/17/2022 11:11 AM SERVICE ELECTRIC CO INC <br /> Contact Name:SERVICE ELECTRIC CO INC <br /> Site Address:2600 FEDERAL AVE <br /> Phone:3605686966 <br /> e-Mail:sharon@secoinc.com <br /> (2/18/2022 10:49 AM MCB) <br /> Ok ufer at tower site <br /> 3/7/2022 3/7/2022 ELEC 02-GROUND STEVE BANKS PARTIAL eTRAKiT Inspection Request <br /> WORK APPROVAL <br /> Notes: <br /> 3/3/2022 11:22 AM SERVICE ELECTRIC CO INC <br /> Ditch Cover-Site Contact Shane 425-508-44S6 <br /> Contact Name:SERVICE ELECTRIC CO INC <br /> Site Address:2600 FEDERAL AVE <br /> Phone:3605686966 <br /> e-Mail:sharon@secoinc.com <br /> (3/7/2022 11:37 AM SKB) <br /> skb changed Inspection Type from ELEC 03-SLAB/CONDUIT to ELEC 02-GROUND WORK <br /> (3/7/2022 11:55 AM SKB) <br /> Into the footing and stubbed up at the Comm pole and center of site with the grounding electrode conductor tried to steal up <br /> by one of the pipes. <br /> Extended conduit up through formed base on top of footing at pole CP02 and CPO1. <br /> 180'of pipe in ditch heading east from CPO1. <br /> Comm power duct in center of site between vaults VWP7 and VWP6 80 feet in concrete. <br /> 3/8/2022 3/8/2022 ELEC 03 SLAB/CONDUIT MIKE BEARDA PARTIAL APPROVAL eTRAKiT Inspection Request <br /> Notes: <br /> 3/7/2022 12:29 PM SERVICE ELECTRIC CO INC <br /> Contact Name:SERVICE ELECTRIC CO INC <br /> Site Address:2600 FEDERAL AVE <br /> Phone:3605686966 <br /> e-Mail:sharon@secoinc.com <br /> (3/8/2022 11:02 AM MCB) <br /> Ok ductbbank from vaul vwp6 to vwp5.For coms and power <br /> I <br /> Printed: Friday,05 September, 2025 2 of 33 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.