Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 10/8/2024 10/25/2024 PW ASBUILTS Andy Erickson APPROVAL See Attached Record Drawings <br /> SUBMITTED 10/2/2023 <br /> Notes: <br /> Record drawings submitted online on 10/2/2023,staff not notified via proper channels.Note to PW Inspector-please review attached record drawings. <br /> Contact Elise Gronewald,Port of Everett,with any questions(eliseg@portofeverett.com,425-232-9961). <br /> PW 25-SITE APPRVD PERMIT <br /> 10/9/2024 10/25/2024 FINAL/PERMIT Andy Erickson FINAL Inspector See notes from Sabrina <br /> CLOSE OUT <br /> Notes: <br /> Ready to perform a site final after as-builts are approved.See as-built line item first. Hold this inspection open if it can be resolved within 1 week. <br /> Sabrina is assisting the Port with closing out permits. <br /> I <br /> Printed: Monday, 28 October,2024 3 of 3 rk <br /> SUPERION <br />