My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2600 FEDERAL AVE 2021 PORT OF EVERETT 2025-09-29
>
Address Records
>
FEDERAL AVE
>
2600
>
PORT OF EVERETT
>
2600 FEDERAL AVE 2021 PORT OF EVERETT 2025-09-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 11:38:10 AM
Creation date
9/5/2025 12:01:45 PM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
2600
Tenant Name
PORT OF EVERETT
Year
2021
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Iq:I <br /> Consulting <br /> Engineers <br /> Page 9 of 13 <br /> - ADT count equal or greater than 100 vehicles per 1,000SF of gross building area <br /> - 300 total trip ends per day <br /> - Storage or maintenance of 25 or more vehicles greater than 20 tons gross weight(including heavy <br /> equipment) <br /> Minimum Requirement#7: Flow Control: <br /> The Norton Terminal is flow control exempt because it has direct discharge to Port Gardner Bay through <br /> Outfalls A and M. <br /> Minimum Requirement#8: Wetland Protection: <br /> There are no wetlands within the project limits and no on-site stormwater discharges into a wetland area. <br /> Minimum Requirement#9: Operation and Maintenance: <br /> Maintenance and inspection guidelines for drainage facilities are provided in Appendix D. <br /> 5.0 Drainage Calculations <br /> 5.1 General <br /> New stormwater collection and conveyance systems will be installed to accommodate the <br /> redevelopment of the site. The proposed stormwater collection and conveyance system includes <br /> trench drains, concrete gutters, catch basins, and manholes to convey stormwater runoff from the <br /> site to Port Gardner Bay. Existing downspouts collecting the warehouse roof at the south end of the <br /> site will be maintained and tied into the new and replaced Outfall A. <br /> Additional stormwater system improvements for basin M, that encompasses the majority of the <br /> terminal, include installing a high-flow bypass structure with an integrated stormwater lift station to <br /> pump the water quality flow rate to the Chitosan Enhanced Sand Filtration (CESF)system. Higher flows <br /> that exceed the water quality flow rate will bypass the lift station and flow into Port Gardner Bay via <br /> the new Outfall M. <br /> The new stormwater conveyance system will also include the replacement and upsizing of existing <br /> outfalls. Outfall A will be upsized from a 10 inch ductile iron pipe to an 18 inch HDPE pipe. Outfall M <br /> will be upsized from a 12 inch PVC pipe to a 36 inch HDPE pipe. <br /> 5.2 Drainage Basin Summary <br /> Basin A drainage area is roughly 4.24 acres in size and includes the existing warehouse roof area, <br /> which is approximately 3.11 acres.The remainder of the basin will be completely paved with asphalt <br />
The URL can be used to link to this page
Your browser does not support the video tag.