Laserfiche WebLink
f IE=6.84(36"E,W) <br /> ■ 18"INLINE CHECK VALV11111611 FLOW <br /> E <br /> ® 1 \ \ \ <br /> AND LIFT STATION SYSTEM, <br /> SEE SHEETS C4.14,C4.15,C4.16 <br /> DEGREE BEND EX OUTFACE 004 ■ <br /> ■ 9s + \ Z -p (� <br /> ■ l,� �O �' (DECOMMISSIONED) ■w <br /> S 2,. <br /> F� sQ 4 L.Li <br /> CB TYPE 2 60"DIA m � �'0 LE-1 <br /> 5 DEGREFBEND12. <br /> cn <br /> RIM=15.02 o cop 1.27IE-12.73(12"N) 29LF-12"SD,S=1.0% FP FLANGED NDREATED WATER LIE=7.07(36"E W) ll \ TREATED STORMWATER VEF�1142LF-12"SO,S=1.0% TO OUTFALL M -� <br /> TD-2 140LF-8 SDFM 3 M N COVER WO FLOWRATE FROM - ABOVE GwR �' L.Li <br /> HIGH FLOW BYPASS/ TER gS <br /> LIFT STATION,SEE C4.15 4• X CONC BASE ES ■ J <br /> TRENCH DRAIN ■ <br /> U 1 TRANSMISSION POLE <br /> TRENCH DRAIN CB HIGH POINT _n NTAINE� \ <br /> v PROTECT-IN-PLACE <br /> RIM=449 RIM=16.02 I <br /> IE=14.49 TD E=15.41 \ <br /> IE=13.02(12 <br /> 90�EGREE BEND <br /> ■ w w w w w =ae� _ JI f� \�� _ ■ - - <br /> -1 SEE SHEET C4.11 (�" R TA oa OP oP"� <br /> �w <br /> --------- LIAU T18 VE Gf3AD�0 00 GAL BAKE op <br /> WINIALWIkU <br /> 75LF-12"SO, S=0.3%- - / \mow �op <br /> p <br /> ■ I EX ASPH ROAD��-"'-$ "�-"'---"'---"'---"'---"'---w, ■ �--� <br /> ■ L 7 S'x20' so s - <br /> M I CONTAINER "---"--- - - - --- - - - t -__ <br /> �1 <br /> �J CARGO CONTAINER I ���/ I ��I ■ <br /> ■ CONTAINMENT AREA o 14' <br /> EX P ✓` \ <br /> Lij - � � SUBSTATION I <br /> I <br /> 3 � � <br /> J <br /> � / `, � l � J � CB TYPE 1 <br /> �t 10'x15' I <br /> IXIMPSTER _ x �� x x J x " I / EM111.707 <br /> CB TYPE 2,48"DIA &RECYCLE AREA se / ` <br /> ■ CB TYPE 2,60"DIA RIM=15.02 -- ■ / <br /> ■ RIM=15.02 IE-10.30(24"E) N� \ �. £ I o ■ <br /> U IE-11.69(12"E) IE=9.85(12"N) - / I <br /> T NI <br /> \ �s <br /> IE=12.02(24"N) IE=9.85(24"S) <br /> IE=8.84(24"S) CB TYPE 2,48"DIA T Li <br /> RIM=16.60 <br /> ■ CB TYPE 2,48" <br /> E=10-09 (12"N) --0 - <br /> - 10LF-18"SD,5=0.4% RIM-15.27 <br /> \ / / `■IE- . <br /> ■ M / <br /> ---- ?164LF-24"SD, 5=0.39-- �--127LF-24"SD, 5=0.3%--- � 58LF-12"SD,5=0.3%- �E <br /> - - _ _ ___ _ _ _ - _ - _ TD-3�_ _ _ _ - _ - _- _ _ __ - 16 \ / \� / <br /> sss- ss L ss ss ^�ss ss ss ss ss ssYMAP <br /> ss ss ss ss ss 5s �^ss ss <br /> 282LFssTRENCH DRAINss ss ss <br /> ------_iu_ ---� -� '�-_F TRENCH DRAIN_ / \ £ \\ Z <br /> -11111110- <br /> �- TRENCH DRAIN TRENCH DRAIN \ CB TYPE 1 CB TYPE 1 ( W <br /> TRENCH DRAIN CB TYPE 2,48"DIA HIGH POINT RIM=15.27 I RIM=15.27 30' 0 30' 60' _ <br /> / HIGH POINT RIM=15.80 RIM=15.80 \-16- IE=12.00 �1F� IE-12.00r9mmal > <br /> RIM=15.80 IE=13.37 TO IE=15.19 <br /> ■/ IE=14.49 IE=10.40 (18") 1 5' 45' W <br /> 3 SCALE: 1"=30' <br /> -]�BASELINE CALL 48 HOURS LU <br /> w w HE w w w w w w - w w w w w w w w <br /> 17+0 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25 0 <br /> - - -�- - - I - - - - BEFORE YOU DIG <br /> DIAL811 w <br /> LP8 LP1 _ <br /> L------- -18------------ --------18---- ---- <br /> f VERT DATUM: NAVD 88 <br /> ■ CONV TO MLLW = NAVD88+2.03 cy <br /> �.� HORZ DATUM: NAD 83/91 W <br /> ■ ■ � m ■ � ■ ■ ■• ■ ■ ■ ■ ■ ■ ■ ■ ■ �1 ■may��� ■ ■ ■ ■ IF SHEET IS LESS THAN 22x34 <br /> M AT C D�L I E e S E 7 REDUCE SCALE ACCORDINGLY W` <br /> PROJECT ENGINEER: SCALE: / <br /> DWG. N0. <br /> F� A. �q N. WATSON 1" = 30' PORT OF EVERETT C4.4 <br /> `L�S6 GQ cP D� 7Mp� ESIGNED BY: DATE: Z <br /> Port of zey< J. BECKER 05/07/2021 NORTON TERMINAL DEVELOPMENT CIP NO. Q <br /> Ram DRAWNBY: CHECKED BY: & MTCA 3RD INTERIM ACTION 1-8-900-05 y <br /> 1601 5th Avenue,Suite 1300 ' a'r014 K. EDWARDS, D. YU N. WATSON PROJECT <br /> P.O. BOX 538 ® 05/07/2021 NW ISSUED FOR SUBSTANTIVE � � y STO R M WAT E R DETAIL PLAN <br /> '�93 G��\�T APPROVED BY: N0. MT-NT-2021-02.2 <br /> Seattle,Washington 98101 <br /> EVERETT, WA 98206 (206)382-0600 Fax(206)382-0500 REQUIREMENTS REVIEW. toxa�8+ <br /> (425) 259-3I64 PROJECT NO.1600120 NO. DATE I BY I REVISION NO. DATE I BY REVISION SHEET NO. XX OF XX A <br />